LaGrange Sealed Solicitation

Title: Thread Phase 9 Coleman to Hunnicutt

Deadline: 12/17/2021 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Description:

PROVIDE LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY TO BUILD THE HUNNICUTT ST. TO COLEMAN CENTER THREAD IN LAGRANGE, GEORGIA 30240 IN ACCORDANCE WITH BID DOCUMENTS, SPECIFICATIONS, KAIZEN COLLABORATIVE CONSTRUCTION SPECIFICATIONS AND DRAWINGS.  VIDEO WILL SOON BE ATTACHED OF EXISTING CONDITION OF STORM DRAIN. 







Pre-Bid Meeting Date: 11/18/2021 2:00 PM

Pre-Bid Meeting Details: MANDATORY


Documents:

Documents as of 11/5/2021
THREAD PHASE 9 BID PACKET.pdf
THREAD PHASE 9 SPECS.pdf
EXSISTING PIPE VIDEO FOR DOWNLOAD.docx
Addition 2

Posted: 11/23/2021

Type of Addition: Bid Date Extension and Optional Pre Bid

Overview: I have decided to push the bid open date by 2 week until Friday, December 17th at 2PM to a lot for my time here at the holidays. Additionally, as I had some issues with the posting of the bid, I will be offering a second, optional pre bid meeting on Friday, December 10th at 2PM. If you attended the first conference, you do not have to attend the second optional one. 

Deadline: 12/17/2021 2:00 PM

Pre-Bid Meeting Date: 12/10/2021 2:00 PM

Addition 3

Posted: 12/9/2021

Type of Addition: Addendum 1

Overview: “Conduct turbidity sampling after every rain event of 0.5 inch or greater within any 24 hour period, recognizing the exceptions specified in Section IV.D.6.d of the NPDES Permits.”

Posted: 11/23/2021

Type of Addition: Bid Date Extension and Optional Pre Bid

Overview: I have decided to push the bid open date by 2 week until Friday, December 17th at 2PM to a lot for my time here at the holidays. Additionally, as I had some issues with the posting of the bid, I will be offering a second, optional pre bid meeting on Friday, December 10th at 2PM. If you attended the first conference, you do not have to attend the second optional one. 

Deadline: 12/17/2021 2:00 PM

Pre-Bid Meeting Date: 12/10/2021 2:00 PM

Posted: 12/9/2021

Type of Addition: Addendum 1

Overview: “Conduct turbidity sampling after every rain event of 0.5 inch or greater within any 24 hour period, recognizing the exceptions specified in Section IV.D.6.d of the NPDES Permits.”