Fort Mill School District Sealed Solicitation
Title: FCMS Data Cabling
Deadline: 12/2/2020 10:00 AM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 20-011
Description: Complete End to End Panduit wiring solution for the new construction of Forest Creek Middle School.
Pre-Bid Meeting Date: 11/16/2020 1:30 PM
Pre-Bid Meeting Details: Mandatory Pre-Bid Meeting & Site Walk-Thru (1:30 p.m.). Forest Creek Middle School, 2211 Whites Road, Fort Mill, SC 29715 Construction Trailer. You will need to bring a hard hat, vests, and safety glasses for this site walk.
Documents:
Documents as of 11/6/2020 |
---|
20-011 FCMS Data Cabling.pdf |
20-011 FCMS Cabling Blue prints Adem C.pdf |
20-011 FCMS data locations Adem D.xlsx |
Addition 1
Posted: 11/17/2020
Type of Addition: Addendum E
Overview: Electrical Site Plan
Solicitation #: 20-011
Documents:
Addition 2
Posted: 11/17/2020
Type of Addition: Addendum F
Overview: Electrical Legend and Notes
Solicitation #: 20-011 FCMS Data Cabling
Documents:
Addition 3
Posted: 11/18/2020
Type of Addition: Addendum G
Overview:
Please see the attached drawings showing the routing of the
Fiber to the IDF F212. Per the electrical engineer, it was the design
intent for all of the Area F Level 1 data to be routed from the larger IDF D125
(located just through the double doors from Area F). Therefore only the
fiber is needed to be routed to Level 2 IDF F212. However, I will go
ahead and install (2) 4” conduits to provide raceway between the Level 1 &
2 cable trays for future use.
Documents:
Addition 4
Posted: 11/20/2020
Type of Addition: Addendum H Questions
Overview: Questions submitted have been answered in Addendum H
Solicitation #: 20-011 FCMS Data Cabling
Documents:
Addition 5
Posted: 12/2/2020
Type of Addition: In Review
Addition 6
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Bid Tab
Overview: Bid submission rank based on scope of work pricing bid results
Documents:
Addition 7
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Intent to Award
Overview: Intent to award on December 2, 2020 based on bid tab results.
Documents:
Addition 8
Posted: 12/2/2020
Type of Addition: Award Information
Overview: Awarded to lowest qualified bidder.
Amount: $211,653.62
Documents:
Addition 9
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Award Statement
Overview: Awarded Bid
Documents:
Posted: 11/17/2020
Type of Addition: Addendum E
Overview: Electrical Site Plan
Solicitation #: 20-011
Documents:
Posted: 11/17/2020
Type of Addition: Addendum F
Overview: Electrical Legend and Notes
Solicitation #: 20-011 FCMS Data Cabling
Documents:
Posted: 11/18/2020
Type of Addition: Addendum G
Overview:
Please see the attached drawings showing the routing of the
Fiber to the IDF F212. Per the electrical engineer, it was the design
intent for all of the Area F Level 1 data to be routed from the larger IDF D125
(located just through the double doors from Area F). Therefore only the
fiber is needed to be routed to Level 2 IDF F212. However, I will go
ahead and install (2) 4” conduits to provide raceway between the Level 1 &
2 cable trays for future use.
Documents:
Posted: 11/20/2020
Type of Addition: Addendum H Questions
Overview: Questions submitted have been answered in Addendum H
Solicitation #: 20-011 FCMS Data Cabling
Documents:
Posted: 12/2/2020
Type of Addition: In Review
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Bid Tab
Overview: Bid submission rank based on scope of work pricing bid results
Documents:
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Intent to Award
Overview: Intent to award on December 2, 2020 based on bid tab results.
Documents:
Posted: 12/2/2020
Type of Addition: Award Information
Overview: Awarded to lowest qualified bidder.
Amount: $211,653.62
Documents:
Posted: 12/2/2020
Type of Addition: 20-011 FCMS Data Cabling Award Statement
Overview: Awarded Bid
Documents: