Description: The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified
contractors for the purpose of removing installing new stormwater infrastructure at three City
streets: Falcon Court, Marion Way, and Washington Ave, hereinafter referred to as the
“Project”. This work includes but is not limited to removing existing piping, installing RCP &
CMP pipe, installing curb and gutter, asphalt repairs, sidewalk, headwalls and additional
manholes.


Documents:

Documents as of 4/6/2023
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
4/6/2023 10:18:11 AM Blount Construction Company Inc
4/6/2023 11:07:19 AM RDJE, Inc
4/6/2023 11:49:37 AM Southeast Pipe Survey, Inc.
4/6/2023 11:54:29 AM Complete Site llc
4/6/2023 3:39:00 PM PWXPress
4/6/2023 3:45:29 PM HD Excavations & Utilities LLC
4/6/2023 4:39:57 PM Proshot Concrete, Inc.
4/6/2023 6:18:47 PM Dodge Data & Analytics
4/7/2023 4:06:00 AM AG Ltd
4/7/2023 11:46:34 AM Advanced Road Construction, LLC
4/7/2023 12:43:56 PM Surfaces Group, LLC.
4/10/2023 7:45:18 AM Civil Solutions
4/10/2023 9:16:13 AM Rummel, Klepper & Kahl, LLP
4/10/2023 9:40:43 AM Chase Reline, Inc.
4/13/2023 4:36:52 PM CMC, Inc.
4/14/2023 9:17:09 AM Wilson Construction Management
4/19/2023 8:10:05 AM Advanced Sports Construction
4/19/2023 1:47:19 PM City of Powder Springs
4/20/2023 3:50:43 PM Deltek
4/24/2023 3:43:44 PM Garney Construction
4/27/2023 1:53:20 PM Calco Engineering
4/27/2023 2:46:53 PM Ranger Environmental
5/5/2023 5:02:14 PM Caldwell Design and Emgineering
5/8/2023 6:46:46 AM Lewallen Construction
5/9/2023 8:27:26 AM S.H. Creel Contracting
5/9/2023 8:36:14 AM Excellere Construction LLC
5/9/2023 8:40:15 AM Tri Scapes, LLC
5/9/2023 9:12:55 AM TriScapes
5/9/2023 9:46:18 AM BackBone Infrastructure, LLC
5/9/2023 10:07:18 AM DAF Concrete, Inc.
5/9/2023 11:05:35 AM dodge data and analytics
5/9/2023 11:15:14 AM ConstructConnect
5/9/2023 11:58:54 AM Dodge Data
5/9/2023 8:09:19 PM V Engineering and Construction Inc.
5/10/2023 4:00:12 PM R&B Developer, Inc
5/12/2023 2:16:34 AM Dodge Data & Analytics
5/13/2023 1:28:01 AM Dodge Data & Analytics
5/15/2023 10:26:36 AM Baldwin Paving Company, Inc.
7/24/2023 7:41:52 PM Douglas Consulting LLC
Addition 1

Posted: 5/9/2023

Type of Addition: Addendum 1 - Bid Opening Zoom Link

Deadline: 5/9/2023 10:00 AM

Solicitation #: 2023 - 16

Documents:

Question 1

Posted: 4/19/2023

Question: Due to current workload, we have decided to No Bid on this project. Thank you

Response: Thank you for your consideration in working with the City of Woodstock.

Question 2

Posted: 4/22/2023

Question: Re: Washington Ave & Arnold Mill: 1. Removal of 18" CMP across Washington Ave is included in Grading Complete, what is the line item for reconstruction of the trench. Re: Marion Way: 1. What are line Items: 500-3800 & 500-3900 used for? 2. Since there is no survey, can we have an underground utility plan at this location such as GIS map? 3. What is the line item for new headwalls? Re: Falcon Ct. 1. What is the line item for new headwalls? 2. Since there is no survey, can we have an underground utility plan at this location such as GIS map?

Response: - Follow patching specifications on page 3. (6” GAB, 8” Class B Conc., 2” Top Coat) - 500-3800: Inlet and Outlet Headwalls. See GDOT STD 1125 as specified on page 8. 500-3900: Outlet Headwall. See GDOT STD 1001B as specified on page 8. - Utility plan not available. Please see general note 3 on cover for utility specifications. - 500-3800 and 500-3900 - 500-3900 - Utility plan not available. Please see general note 3 on cover for utility specifications.

Question 3

Posted: 4/25/2023

Question: WASHINGTON AVENUE - Will the area of work where the new 18” RCP is being placed be resurfaced or just patched? If not, where will the milling and asphalt items take place? - Will the drainage structure connecting the 18” CMP on station 14+00 be removed? If so, is there going to be a pay item for it or where does it need to be included? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?

Response: - Resurfacing and leveling are for the area shown on sheet 3. - 18” pipe crossing of Washington Ave to be removed as noted on plan sheet. There are no structures for this pipe. Cost included in grading complete. - For Patching of roadway as noted on sheet 3.

Question 4

Posted: 4/25/2023

Question: MARION WAY - Will there be an item for traffic control, or does it need to be included under Washington Way? - Will there be an item for asphalt such as in Falcon court or is the asphalt used to patch the road incidental to the pipe? - Since many natural areas are being disturbed and there is a small creek, will any water monitoring be needed? Will any silt fence or other erosion control items be needed? - How far do we need to back fill with dirt where the manhole and the new 24” pipe is being built? - What is the required curb backfill width where the new curb is being built? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?

Response: - Marion Way is a low volume residential street. Must maintain 1 lane of traffic for emergency services. Include cost in Grading Complete for Marion Way - Only patch with Class B as noted on sheet 8. City will be repaving street in upcoming resurfacing project. - No. - Contractor to grass seed and mulch after construction. Cost included in grading complete. - Approximately where the fill lines are located on plan sheets. - 2’ width - For roadway patching as noted on plan sheet.

Question 5

Posted: 4/25/2023

Question: FALCON COURT - Will there be an item for traffic control, or does it need to be included under Washington Way? - Is the asphalt item to patch the road? If not, where will it be placed? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?

Response: - Falcon court is a low volume residential street. Must maintain 1 lane of traffic for emergency services. Include cost in Grading Complete for Falcon Court - Yes as noted on sheet 8. - Patching roadway as noted on sheet 8.

Posted: 5/9/2023

Type of Addition: Addendum 1 - Bid Opening Zoom Link

Deadline: 5/9/2023 10:00 AM

Solicitation #: 2023 - 16

Documents:

Posted: 4/19/2023

Question: Due to current workload, we have decided to No Bid on this project. Thank you

Response: Thank you for your consideration in working with the City of Woodstock.

Posted: 4/22/2023

Question: Re: Washington Ave & Arnold Mill: 1. Removal of 18" CMP across Washington Ave is included in Grading Complete, what is the line item for reconstruction of the trench. Re: Marion Way: 1. What are line Items: 500-3800 & 500-3900 used for? 2. Since there is no survey, can we have an underground utility plan at this location such as GIS map? 3. What is the line item for new headwalls? Re: Falcon Ct. 1. What is the line item for new headwalls? 2. Since there is no survey, can we have an underground utility plan at this location such as GIS map?

Response: - Follow patching specifications on page 3. (6” GAB, 8” Class B Conc., 2” Top Coat) - 500-3800: Inlet and Outlet Headwalls. See GDOT STD 1125 as specified on page 8. 500-3900: Outlet Headwall. See GDOT STD 1001B as specified on page 8. - Utility plan not available. Please see general note 3 on cover for utility specifications. - 500-3800 and 500-3900 - 500-3900 - Utility plan not available. Please see general note 3 on cover for utility specifications.

Posted: 4/25/2023

Question: WASHINGTON AVENUE - Will the area of work where the new 18” RCP is being placed be resurfaced or just patched? If not, where will the milling and asphalt items take place? - Will the drainage structure connecting the 18” CMP on station 14+00 be removed? If so, is there going to be a pay item for it or where does it need to be included? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?

Response: - Resurfacing and leveling are for the area shown on sheet 3. - 18” pipe crossing of Washington Ave to be removed as noted on plan sheet. There are no structures for this pipe. Cost included in grading complete. - For Patching of roadway as noted on sheet 3.

Posted: 4/25/2023

Question: MARION WAY - Will there be an item for traffic control, or does it need to be included under Washington Way? - Will there be an item for asphalt such as in Falcon court or is the asphalt used to patch the road incidental to the pipe? - Since many natural areas are being disturbed and there is a small creek, will any water monitoring be needed? Will any silt fence or other erosion control items be needed? - How far do we need to back fill with dirt where the manhole and the new 24” pipe is being built? - What is the required curb backfill width where the new curb is being built? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?

Response: - Marion Way is a low volume residential street. Must maintain 1 lane of traffic for emergency services. Include cost in Grading Complete for Marion Way - Only patch with Class B as noted on sheet 8. City will be repaving street in upcoming resurfacing project. - No. - Contractor to grass seed and mulch after construction. Cost included in grading complete. - Approximately where the fill lines are located on plan sheets. - 2’ width - For roadway patching as noted on plan sheet.

Posted: 4/25/2023

Question: FALCON COURT - Will there be an item for traffic control, or does it need to be included under Washington Way? - Is the asphalt item to patch the road? If not, where will it be placed? - Is the Class B Concrete Widening incidental to the new Curb & Gutter or where is it going to be placed?