City of Daytona Beach Sealed Solicitation
Title: SWEETHEART TRAIL- BEACH STREET (WILDER BLVD. TO SHADY PLACE)
Deadline: 3/11/2019 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 19193
Description: The work generally consists of constructing 2,324 feet (0.440 miles) of concrete shared use path within the City of Daytona Beach. The proposed shared use path extends from the intersection of Wilder Boulevard and Palmetto Avenue, easterly along Wilder Boulevard for 300ft, and then northerly 2024ft along South Beach Street to the intersection of South Beach Street and Shady Place. This project also includes a reduction in the paved roadway width of South Beach Street, which includes 2085 feet (0.395 miles) of new pavement construction, milling and resurfacing, and curb and gutter construction. Other project elements include driveway reconstruction, minor drainage improvements associated with the trail project, roadway lighting, landscaping, and minor utility adjustments. All proposed improvements will be constructed entirely within existing right-of-way.
Pre-Bid Meeting Date: 2/11/2019 10:00 AM
Pre-Bid Meeting Details: A NON-MANDATORY PRE-PROPOSAL CONFERENCE will be held at the Daytona Beach Public Works Conference Room, 950 Bellevue Ave. #500, Daytona Beach, Florida 32114, on February 11, 2019 at 10:00 AM. Interested contractors are urged to attend.
Documents:
Addition 2
Posted: 3/11/2019
Type of Addition: In Review
Addition 3
Posted: 3/19/2019
Type of Addition: BAFO BID TABULATION
Overview:
Documents:
Posted: 3/11/2019
Type of Addition: In Review
Posted: 3/19/2019
Type of Addition: BAFO BID TABULATION
Overview:
Documents: