Title: SPALDING COUNTY CORRECTIONAL INSTITUTE BAR SCREEN

Deadline: 3/3/2020 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: In Review

Description:


 SPALDING COUNTY CORRECTIONAL INSTITUTE BAR SCREEN


  The OWNER of the project is SPALDING COUNTY. The ENGINEER for the project is Paragon Consulting Group, Inc.


The approximate extent and character of the Work is generally described as follows:


Construction of a new sewerage screening system for the Spalding County Jail and Correctional Facility.  Construction of a 16-inch wide, four foot deep concrete channel to house the screening equipment is required.  Bypass pumping will be required for construction of the channel.  The screening unit will require a 460 volt three phase circuit and a 15 gpm water supply to be run to the unit.  The project will require grading of the channel location and a gravel drive to access the dumpster at the screen discharge auger.




Pre-Bid Meeting Date: 2/12/2020 10:00 AM

Pre-Bid Meeting Details: A mandatory pre-bid meeting will be held on Wednesday, February 12, 2020 at 10:00 am at the site location, 295 Justice Blvd. in Griffin, GA 30223.


Documents:

Documents as of 2/20/2020
Advertisement for Bidders-19102.00.pdf
19102.00 Addendum #1_02.18.2020.pdf
Bid Tabulation_Revised 02.18.2020.pdf
Plan Sheet 4_Revised 02.18.2020.pdf
Plan Sheet 5_Revised 02.18.2020.pdf
Plan Sheet 9_Revised 02.18.2020.pdf
Addendum Exhibit 1.1 - Water Service Line Location.pdf
EX E - Contractor Affidavit and Agreement.pdf
19102.00 Addendum #2_02.20.2020.pdf
HP Series N1A Stop Gate.pdf
Addition 1

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Addition 2

Posted: 3/5/2020

Type of Addition: Bid Chart

Overview:

Documents:

Addition 3

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Addition 4

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Addition 5

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Posted: 3/5/2020

Type of Addition: Bid Chart

Overview:

Documents:

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Posted: 3/5/2020

Type of Addition: In Review

Documents:

Posted: 3/5/2020

Type of Addition: In Review

Documents: