Lindbergh Schools Sealed Solicitation

Title: Lindbergh High School Demolition of 300-400 Building

Deadline: 2/9/2023 2:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Description: Lindbergh Schools seeks proposal for the demolition of the 300/400 building located at 5000 S. Lindbergh Blvd. St. Louis, MO. This proposal is for demolition only. 


Pre-Bid Meeting Date: 2/2/2023 4:00 PM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.


Documents:

Documents as of 1/26/2023
Login to view documents
Addition 1

Posted: 2/8/2023

Type of Addition: Addendum

Documents:

Question 1

Posted: 2/6/2023

Question: Is the gas, water, sewer and electric disconnects to Building 300/400 done by the General Contractor of Bid Package 5 and therefore not included in the demolition scope of work?

Response: Utility disconnect needs to be included in current demo bid.

Question 2

Posted: 2/6/2023

Question: Is all environmental work, i.e. asbestos, bulbs/ballasts, freon recovery, etc., included in the demolition scope of Bid Package 5?

Response: The District is handling all environmental work, i.e. asbestos, bulbs/ballasts, Freon recovery.

Question 3

Posted: 2/6/2023

Question: Is the siltation control and perimeter fencing included in the demolition scope of Bid Package 5?

Response: Vendors need to contain the area around their work site while work is being done.

Question 4

Posted: 2/6/2023

Question: It was mentioned that the demolition contractor shall sawcut and remove the tops of the under-slab utility tunnels so the asbestos contractor can abate the piping in the tunnels, has this changed after our discussions at the walk thru?

Response: No, this has not changed.

Question 5

Posted: 2/6/2023

Question: In Addendum No. 1, dated January 9, 2023, 1.3 Attachments - A. 1.a. - ,General - Bidder's Question on insurance requirements addressed'; this attachment was not found in Addendum No. 1. Please advise.

Response: This was a typo within Addendum 1 dated January 9, 2023. Insurance requirements are correct within the District RFP, “GEN 23- INSURANCE REQUIREMENTS”

Posted: 2/8/2023

Type of Addition: Addendum

Documents:

Posted: 2/6/2023

Question: Is the gas, water, sewer and electric disconnects to Building 300/400 done by the General Contractor of Bid Package 5 and therefore not included in the demolition scope of work?

Response: Utility disconnect needs to be included in current demo bid.

Posted: 2/6/2023

Question: Is all environmental work, i.e. asbestos, bulbs/ballasts, freon recovery, etc., included in the demolition scope of Bid Package 5?

Response: The District is handling all environmental work, i.e. asbestos, bulbs/ballasts, Freon recovery.

Posted: 2/6/2023

Question: Is the siltation control and perimeter fencing included in the demolition scope of Bid Package 5?

Response: Vendors need to contain the area around their work site while work is being done.

Posted: 2/6/2023

Question: It was mentioned that the demolition contractor shall sawcut and remove the tops of the under-slab utility tunnels so the asbestos contractor can abate the piping in the tunnels, has this changed after our discussions at the walk thru?

Response: No, this has not changed.

Posted: 2/6/2023

Question: In Addendum No. 1, dated January 9, 2023, 1.3 Attachments - A. 1.a. - ,General - Bidder's Question on insurance requirements addressed'; this attachment was not found in Addendum No. 1. Please advise.