Sinclair Community College Sealed Solicitation

Title: FAC 23-02 - Plumbing Replacement Phase I

Deadline: 3/24/2023 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: FAC 23-02 (OFCC: #SCC-002302)

Description: A. Project Description


The project will accomplish the replacement of the hot and cold water supplies as well as drain, waste, and vent piping in Building 4 for the domestic water system.

The selected design team will serve as Architect/Engineer (A/E), and shall have extensive experience in State of Ohio public Design-Bid-Build (DBB) projects. A/E shall be familiar with all methods and procedures for executing Ohio public DBB projects, and will conduct programming (POR) and concept development with Sinclair staff, provide design documents, arrange for bidding, and provide construction administration of project on Owner’s behalf, and shall have broad experience related to general and plumbing building renovation construction. Important elements in the A/E selection process will be experience in similar design work, protection of building interiors and surrounding campus property as well as mitigating disruptions to students, visitors and staff. The firms must have experience in the complete design and monitoring of the work to be performed, to ensure work meets all codes and requirements, and to ensure subsequent warranties.

B. Scope of Services

The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements.

As required by the Agreement, and as properly authorized, provide the following categories of services: Program of Requirements, Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. A/E shall conduct all meetings and shall take and distribute meeting minutes to all participants.

During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience.

For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ:

1. Plumbing & Piping Design
2. General Building Renovation

Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. 


Documents:

Documents as of 3/8/2023
Login to view documents