City of Daytona Beach Sealed Solicitation

Title: BETHUNE POINT WATER RECLAMATION FACILITY GENERATOR REPLACEMENT

Deadline: 5/4/2020 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: ITB 20343

Description:

The work generally consists of Project includes furnishing all labor, equipment, materials, and construction services to complete the project work as noted in the Project Documents. The primary work includes installation of two (2) new 750kW diesel generators at the Bethune Point Water Reclamation Facility. The Order of Magnitude for this project is $1,487,500 - $1,925,000.


Pre-Bid Meeting Date: 3/18/2020 10:00 AM

Pre-Bid Meeting Details: A NON-MANDATORY PRE-BID CONFERENCE will be held via teleconference, on March 18, 2020 at 10:00 AM. Interested contractors are urged to call 386.671.3178 no earlier than 15 minutes prior to the meeting.


Documents:

Documents as of 5/4/2020
ITB-INVITATION 20343.pdf
ITB 20343-Bethune Point Generator Replacement-FINAL.pdf
ITB 20343-Plans-200-26561-18002 - REV1_Bethune WRF Generator Replacement_Drawings_S&S.PDF
PreBidSignUp-3_18_2020.pdf
Site Visit Registration 4.20.20.pdf
Addendum 8-Revised Bid Schedule.xlsx
Bid_Tabulation-20343.pdf
Addition 1

Posted: 3/17/2020

Type of Addition: Addendum 1

Overview: Prebid will be conducted by teleconference, not at 950 Bellevue Avenue.

Documents:

Addition 2

Posted: 3/19/2020

Type of Addition: Addendum 2

Overview: Electronic bid submittal allowed.

Documents:

Addition 3

Posted: 3/20/2020

Type of Addition: Addendum 3

Overview: site visits planned - 3/25/2020 at 10:00 AM.  You must RSVP so that no more than 10 people are in attendance.  Secondary date of 3/27/2020 at 2:00 PM if more than 10 request to attend. 

Pre-Bid Meeting Details: site visits planned - 3/25/2020 at 10:00 AM. You must RSVP so that no more than 10 people are in attendance.

Documents:

Addition 4

Posted: 3/24/2020

Type of Addition: Addendum 4

Overview: cancellation of site visit on 3/25/20; added a virtual tour.  

Documents:

Addition 5

Posted: 4/3/2020

Type of Addition: Addendum 5

Overview: Q & A, Only Online Bids Accepted, Change terms, change due date. 

Deadline: 4/22/2020 2:00 PM

Documents:

Addition 6

Posted: 4/17/2020

Type of Addition: Addendum 6

Overview: Site visit scheduled, planholders list.

Documents:

Addition 7

Posted: 4/20/2020

Type of Addition: Addendum 7

Overview: change bid due/opening date, questions & answers, additional addendum coming.

Deadline: 5/1/2020 2:00 PM

Documents:

Addition 8

Posted: 4/27/2020

Type of Addition: Addendum 8

Overview: Question/Answers, revised drawings, revised bid schedule, change due date

Deadline: 5/4/2020 2:00 PM

Documents:

Addition 9

Posted: 5/4/2020

Type of Addition: In Review

Addition 10

Posted: 7/2/2020

Type of Addition: Award Information

Documents:

Question 1

Posted: 3/23/2020

Question: In regard to Minimum qualifications, would the City/Engineer accept 3 past projects that include Active Governmental Facilities (i.e: Branch Jails, EMS Facilities, etc) of equal size and scope? Not just Active Wastewater Treatment Facilities.

Response: See addendum 5, #7, question 19

Question 2

Posted: 4/1/2020

Question: The specifications for the generator enclosure requires a 65 dBA rating at 23 feet sound levels. This is not economically feasible with the size of generator engine and HVHR enclosure of this size/type. It would require additional attenuation measures be installed within the enclosure and would significantly increase the footprint and cost. Please advise if 74dBA ratings at 23 feet is acceptable.

Response: See Addendum 5, #7, question 14.

Posted: 3/17/2020

Type of Addition: Addendum 1

Overview: Prebid will be conducted by teleconference, not at 950 Bellevue Avenue.

Documents:

Posted: 3/19/2020

Type of Addition: Addendum 2

Overview: Electronic bid submittal allowed.

Documents:

Posted: 3/20/2020

Type of Addition: Addendum 3

Overview: site visits planned - 3/25/2020 at 10:00 AM.  You must RSVP so that no more than 10 people are in attendance.  Secondary date of 3/27/2020 at 2:00 PM if more than 10 request to attend. 

Pre-Bid Meeting Details: site visits planned - 3/25/2020 at 10:00 AM. You must RSVP so that no more than 10 people are in attendance.

Documents:

Posted: 3/24/2020

Type of Addition: Addendum 4

Overview: cancellation of site visit on 3/25/20; added a virtual tour.  

Documents:

Posted: 4/3/2020

Type of Addition: Addendum 5

Overview: Q & A, Only Online Bids Accepted, Change terms, change due date. 

Deadline: 4/22/2020 2:00 PM

Documents:

Posted: 4/17/2020

Type of Addition: Addendum 6

Overview: Site visit scheduled, planholders list.

Documents:

Posted: 4/20/2020

Type of Addition: Addendum 7

Overview: change bid due/opening date, questions & answers, additional addendum coming.

Deadline: 5/1/2020 2:00 PM

Documents:

Posted: 4/27/2020

Type of Addition: Addendum 8

Overview: Question/Answers, revised drawings, revised bid schedule, change due date

Deadline: 5/4/2020 2:00 PM

Documents:

Posted: 5/4/2020

Type of Addition: In Review

Posted: 7/2/2020

Type of Addition: Award Information

Documents:

Posted: 3/23/2020

Question: In regard to Minimum qualifications, would the City/Engineer accept 3 past projects that include Active Governmental Facilities (i.e: Branch Jails, EMS Facilities, etc) of equal size and scope? Not just Active Wastewater Treatment Facilities.

Response: See addendum 5, #7, question 19

Posted: 4/1/2020

Question: The specifications for the generator enclosure requires a 65 dBA rating at 23 feet sound levels. This is not economically feasible with the size of generator engine and HVHR enclosure of this size/type. It would require additional attenuation measures be installed within the enclosure and would significantly increase the footprint and cost. Please advise if 74dBA ratings at 23 feet is acceptable.

Response: See Addendum 5, #7, question 14.