Town of Summerville Sealed Solicitation
Title: Mast Arms Project (US-17A and Berlin Myers Parkway)
Deadline: 8/3/2017 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Cancelled
Description: The Project consists of providing all labor, materials, and equipment for installing mast arms located in the Town of Summerville. Work items include: • Install two new mast arms including foundations, poles, and arms. Foundation design will be provided by the mast arm supplier. • Provide and install new signal heads on mast arms. • Provide and install new pedestrian signals. • Provide signal reprogramming; coordinate with SCDOT. • Install new 2" PVC by directional boring under existing roads. • Modify existing sidewalks and construct ADA-compliant ramps with detectable warning. • Install new Striping. • Coordinate all work with SCDOT and Town of Summerville. • Provide new electrical service for signals. Coordinate with utility provider. • Provide accurate as-built drawings of each intersection.
Pre-Bid Meeting Date: 7/27/2017 2:00 PM
Pre-Bid Meeting Details: A mandatory pre-bid conference will be held at the Town of Summerville located at 200 S. Main St., 2nd floor Training Room, Town Hall Annex, Summerville, SC, at 2:00 PM, on July 27, 2017.
Documents:
Documents as of 6/21/2017 |
---|
ITB_Mast Arms Project.pdf |
SC165US17AMastArms.SS051717.pdf |
Addition 1
Posted: 7/7/2017
Type of Addition: Addendum #1
Documents: