Town of Medley Sealed Solicitation
Title: RFP 2020-015 MEDLEY TOBIE WILSON PARK COMMUNITY POOL
Deadline: 11/21/2019 3:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 2020-015
Description:
Design-Builder shall furnish all design, construction, and
commissioning of the community pool facility. Upon completion of the project,
the Design-Builder will provide a fully functional, turn-key facility. Design-Builder shall provide supervision,
labor, materials, tools, equipment, obtaining all required permits, and
performing all operations required to construct the Town of Medley Capital
Improvements Project Number CR-0227, Medley Tobie Wilson Park Community Pool in
accordance with the Contract Documents.
The Design-Builder will be responsible for the development and
preparation of all construction documents from the Design Criteria Package
provided by the TOWN.
The project work includes, but is not limited to, the
construction of a swimming pool, pool deck, Restroom Building, Picnic Area and
Parking Lot. The Restroom building contains; men’s and women’s restrooms, an
outdoor shower, outdoor lockers, a pool equipment room, an electrical room, a
storage room and Janitor’s Closet.
Design-Builder shall be responsible for complying with the
requirements of all regulatory agencies and applicable laws; coordinating with
all impacted utility owners.
Pre-Bid Meeting Date: 10/15/2019 11:00 AM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-solicitation meeting.
Documents:
Documents as of 10/2/2019 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Addition 1
Posted: 10/21/2019
Type of Addition: Addendum #1
Documents:
Addition 2
Posted: 11/5/2019
Type of Addition: Addendum #2
Overview:
Deadline: 11/21/2019 3:00 PM
Solicitation #: 2020-015
Documents:
Addition 3
Posted: 11/19/2019
Type of Addition: Addendum #3
Overview: Since this is a Town of Medley project, Supplementary Condition 1.02 Applicable Wage Rates and corresponding Appendix A Responsible Wages and Benefits, are not applicable and are to be excluded from the Proposal.
Solicitation #: 2020-015
Documents:
Addition 4
Posted: 11/20/2019
Type of Addition: Addendum #4
Overview:
Documents:
Addition 5
Posted: 11/21/2019
Type of Addition: In Review/ Bid Opening Report
Overview:
Documents:
Addition 6
Posted: 11/21/2019
Type of Addition: In Review
Addition 7
Posted: 4/8/2020
Type of Addition: Award Information
Addition 8
Posted: 4/9/2020
Type of Addition: Notice of Award
Overview:
Documents:
Posted: 10/21/2019
Type of Addition: Addendum #1
Documents:
Posted: 11/5/2019
Type of Addition: Addendum #2
Overview:
Deadline: 11/21/2019 3:00 PM
Solicitation #: 2020-015
Documents:
Posted: 11/19/2019
Type of Addition: Addendum #3
Overview: Since this is a Town of Medley project, Supplementary Condition 1.02 Applicable Wage Rates and corresponding Appendix A Responsible Wages and Benefits, are not applicable and are to be excluded from the Proposal.
Solicitation #: 2020-015
Documents:
Posted: 11/20/2019
Type of Addition: Addendum #4
Overview:
Documents:
Posted: 11/21/2019
Type of Addition: In Review/ Bid Opening Report
Overview:
Documents:
Posted: 11/21/2019
Type of Addition: In Review
Posted: 4/8/2020
Type of Addition: Award Information