Arlington County Government Sealed Solicitation

Title: 23-DES-ITBPW-361 Traffic Engineering & Operation Interior Renovation

Deadline: 12/21/2022 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 23-DES-ITBPW-361

Description: SOLID WASTE / TE&O RENOVATION IS A CAPITAL IMPROVEMENT PROJECT CONSISTS OF A PARTIAL RENOVATION OF THE OCCUPIED BUILDING WHICH INCLUDES AN INTERIOR LOCKER ROOM REFRESH AS WELL AS THE ADDITION OF A UTILITY CLOSET TO THE MAIN BUILDING. THE SITE IS LOCATED AT THE ARLINGTON COUNTY TRADE CENTER AND ALL OTHER FACILITIES WILL BE ACTIVE DURING CONSTRUCTION. 


Pre-Bid Meeting Date: 12/8/2022 10:30 AM


Documents:

Documents as of 11/16/2022
23-DES-ITBPW-361 Traffic Engineering and Operation Interior Renovation.pdf
ATTACHMENT A - Pricing Schedule.xlsx
ATTACHMENT B - DOLI Wage Determination.pdf
ATTACHMENT C - Solid Waste and TEO Bid PLAN.pdf
ATTACHMENT D - Solid Waste TEO Bid SPEC.pdf
ATTACHMENT E - Suplementary Conditions SW & TEO.pdf
ATTACHMENT F - Contractors Performance Form.pdf
Addition 2

Posted: 12/8/2022

Type of Addition: Attendance Sheet & Minutes

Documents:

Addition 3

Posted: 12/21/2022

Type of Addition: Bid Tabulation

Documents:

Addition 4

Posted: 2/21/2023

Type of Addition: Award Information

Documents:

Question 1

Posted: 11/21/2022

Question: I do not see the structural, civil, or MEP pages on the set of plans given to us. When will these be made available?

Response: Please refer to Addendum No. 1

Question 2

Posted: 11/29/2022

Question: Does the client/evaluator submit ATTACHMENT F – CONTRACTOR PERFORMANCE FORM to sgezachew@arlingtonva.us. There are no instructions how the form should be submitted.

Response: This is for information purposes only. This form pertains to the Contractor Performance clause in the sample contract attached.

Question 3

Posted: 11/29/2022

Question: The two projects that must be submitted under Minimum Bidder qualification. Is ATTACHMENT F – CONTRACTOR PERFORMANCE FORM for the two projects?

Response: We have already responded to this question. Please see the public solicitation.

Question 4

Posted: 11/29/2022

Question: On Page 9 of the RFP under Web-based Project Management Experience: The Bidder should have at least two years of experience in managing a project on an online management website for electronic distribution of project documents, submittals, RFIs, invoices correspondence etc. Provide evidence of online management program(s) utilized during construction for your past projects. Besides the PM and Superintendent resumes, are you requesting additional resumes for this requirement?

Response: Anyway you can provide evidence, not limited to resume.

Question 5

Posted: 11/29/2022

Question: Pursuant to the Guidance Memorandum dated May 25, 2022 issued by the Department of Defense (“Guidance on Inflation and Economic Price Adjustment), will the Government be utilizing an Economic Price Adjustment (“EPA”) provision on this project? If so, are there specific items, materials, or equipment the EPA will apply to? If the Government is not considering utilizing an EPA provision, we request that the Government include such a provision to prevent volatility and mitigate financial harm imposed on Contractors on Fixed Price contracts due to the current high inflation environment.

Response: No escalation provision at this time.

Question 6

Posted: 11/30/2022

Question: The plans state that there was a Hazmat report done by Aerosol. I do not see this report in the plans or docs. Do we need to contact Aerosol to get these reports or will they be provided on the Vendor Registry by Arlington County?

Response: Arlington County is preforming all Hazmat remediation prior to the start of this project

Question 7

Posted: 11/30/2022

Question: The spec book calls for a web based project software to be provided by the GC. The 5 that are spec-ed are Corecon, Meridian, Newforma, Procore, and Viewpoint. Are these our only options? Our company uses a project software program that does EVERYTHING Procore does. Will we be allowed to use It?

Response: Options provided are okay.

Question 8

Posted: 12/1/2022

Question: The Bid Form states, on Page 4, that the Bidder’s obtained project experience shall consist of ”Building interior renovation work including updated mechanical system ADA improvements.” Does this mean that the renovation work should include BOTH updated mechanical systems and ADA improvements? Please clarify.

Response: The scope is clearly defined in the drawing.

Question 9

Posted: 12/9/2022

Question: The roofing plans call for roof work only to be done by Nastos Construction or Simpson Unlimited. Is this a hard rule? Can we not use our own certified roofers?

Response: You may use your own certified roofer.

Question 10

Posted: 12/12/2022

Question: Please confirm current controls system

Response: Trane BACnet communication network

Question 11

Posted: 12/13/2022

Question: In the front of the building there is a tree in front of the area where the water closet enclosure is being built, the tree is not listed to be removed on the drawings. We ask that the tree be removed either by Arlington County or add to our scope of work for this project.

Response: If needed, the tree will be removed by Arlington County

Question 12

Posted: 12/13/2022

Question: Will the construction crew have access to restrooms for the duration of the project?

Response: Contractor should provide their own portable restrooms during construction

Question 13

Posted: 12/13/2022

Question: Is the County/Architect open to utilizing roofing companies other than the ones listed in Section 07 54 16?

Response: We have already responded to this question. Please see the public solicitation.

Question 14

Posted: 12/13/2022

Question: Is the County requiring full time superintendent supervision on this project?

Response: Yes.

Question 15

Posted: 12/13/2022

Question: On plan A2.01, there is a 6’x2’ HW window with G-1 glass but not addressed on the other drawings. Please clarify the locations where G-1 is required. Jamb Detail J-3 references Drawing A-503 which is not included in bid set.

Response: The window type 3 as shown on A2.01 is no longer in the project scope. Type G1 glass is no longer in the project scope. Jamb type J3 is no longer in the project scope.

Question 16

Posted: 12/13/2022

Question: 2. Are there any proprietary vendors for HVAC control? Fire Alarm? Access controls?

Response: Proprietary vendors as follows: Boland for HVAC Controls/M.C Dean for Fire Alarm/ADT for Access Controls

Question 17

Posted: 12/13/2022

Question: Is a time extension for bid submission date possible given the holidays?

Response: No extension at this time.

Question 18

Posted: 12/13/2022

Question: Please provide specification and fire rating on fireproofing for new structural steel.

Response: There is no required fireproofing for the structural steel. The building construction type does not require it.

Question 19

Posted: 12/13/2022

Question: Please confirm building does not have existing sprinkler system and new sprinkler system is not required.

Response: The building does not have sprinkler system and new sprinkler system is not required

Posted: 12/8/2022

Type of Addition: Attendance Sheet & Minutes

Documents:

Posted: 12/21/2022

Type of Addition: Bid Tabulation

Documents:

Posted: 2/21/2023

Type of Addition: Award Information

Documents:

Posted: 11/21/2022

Question: I do not see the structural, civil, or MEP pages on the set of plans given to us. When will these be made available?

Response: Please refer to Addendum No. 1

Posted: 11/29/2022

Question: Does the client/evaluator submit ATTACHMENT F – CONTRACTOR PERFORMANCE FORM to sgezachew@arlingtonva.us. There are no instructions how the form should be submitted.

Response: This is for information purposes only. This form pertains to the Contractor Performance clause in the sample contract attached.

Posted: 11/29/2022

Question: The two projects that must be submitted under Minimum Bidder qualification. Is ATTACHMENT F – CONTRACTOR PERFORMANCE FORM for the two projects?

Response: We have already responded to this question. Please see the public solicitation.

Posted: 11/29/2022

Question: On Page 9 of the RFP under Web-based Project Management Experience: The Bidder should have at least two years of experience in managing a project on an online management website for electronic distribution of project documents, submittals, RFIs, invoices correspondence etc. Provide evidence of online management program(s) utilized during construction for your past projects. Besides the PM and Superintendent resumes, are you requesting additional resumes for this requirement?

Response: Anyway you can provide evidence, not limited to resume.

Posted: 11/29/2022

Question: Pursuant to the Guidance Memorandum dated May 25, 2022 issued by the Department of Defense (“Guidance on Inflation and Economic Price Adjustment), will the Government be utilizing an Economic Price Adjustment (“EPA”) provision on this project? If so, are there specific items, materials, or equipment the EPA will apply to? If the Government is not considering utilizing an EPA provision, we request that the Government include such a provision to prevent volatility and mitigate financial harm imposed on Contractors on Fixed Price contracts due to the current high inflation environment.

Response: No escalation provision at this time.

Posted: 11/30/2022

Question: The plans state that there was a Hazmat report done by Aerosol. I do not see this report in the plans or docs. Do we need to contact Aerosol to get these reports or will they be provided on the Vendor Registry by Arlington County?

Response: Arlington County is preforming all Hazmat remediation prior to the start of this project

Posted: 11/30/2022

Question: The spec book calls for a web based project software to be provided by the GC. The 5 that are spec-ed are Corecon, Meridian, Newforma, Procore, and Viewpoint. Are these our only options? Our company uses a project software program that does EVERYTHING Procore does. Will we be allowed to use It?

Response: Options provided are okay.

Posted: 12/1/2022

Question: The Bid Form states, on Page 4, that the Bidder’s obtained project experience shall consist of ”Building interior renovation work including updated mechanical system ADA improvements.” Does this mean that the renovation work should include BOTH updated mechanical systems and ADA improvements? Please clarify.

Response: The scope is clearly defined in the drawing.

Posted: 12/9/2022

Question: The roofing plans call for roof work only to be done by Nastos Construction or Simpson Unlimited. Is this a hard rule? Can we not use our own certified roofers?

Response: You may use your own certified roofer.

Posted: 12/12/2022

Question: Please confirm current controls system

Response: Trane BACnet communication network

Posted: 12/13/2022

Question: In the front of the building there is a tree in front of the area where the water closet enclosure is being built, the tree is not listed to be removed on the drawings. We ask that the tree be removed either by Arlington County or add to our scope of work for this project.

Response: If needed, the tree will be removed by Arlington County

Posted: 12/13/2022

Question: Will the construction crew have access to restrooms for the duration of the project?

Response: Contractor should provide their own portable restrooms during construction

Posted: 12/13/2022

Question: Is the County/Architect open to utilizing roofing companies other than the ones listed in Section 07 54 16?

Response: We have already responded to this question. Please see the public solicitation.

Posted: 12/13/2022

Question: Is the County requiring full time superintendent supervision on this project?

Response: Yes.

Posted: 12/13/2022

Question: On plan A2.01, there is a 6’x2’ HW window with G-1 glass but not addressed on the other drawings. Please clarify the locations where G-1 is required. Jamb Detail J-3 references Drawing A-503 which is not included in bid set.

Response: The window type 3 as shown on A2.01 is no longer in the project scope. Type G1 glass is no longer in the project scope. Jamb type J3 is no longer in the project scope.

Posted: 12/13/2022

Question: 2. Are there any proprietary vendors for HVAC control? Fire Alarm? Access controls?

Response: Proprietary vendors as follows: Boland for HVAC Controls/M.C Dean for Fire Alarm/ADT for Access Controls

Posted: 12/13/2022

Question: Is a time extension for bid submission date possible given the holidays?

Response: No extension at this time.

Posted: 12/13/2022

Question: Please provide specification and fire rating on fireproofing for new structural steel.

Response: There is no required fireproofing for the structural steel. The building construction type does not require it.

Posted: 12/13/2022

Question: Please confirm building does not have existing sprinkler system and new sprinkler system is not required.

Response: The building does not have sprinkler system and new sprinkler system is not required