Village of Addison Sealed Solicitation
Title: Byron Storm Sewer Installation
Deadline: 7/13/2020 10:00 AM (UTC-06:00) Central Time (US & Canada)
Status: Awarded
Solicitation Number: 20-6-1
Description:
The Village of Addison is currently seeking bids for the Byron Storm Sewer Installation project. The project consists of installing approximately 800 lineal feet of 21-Inch storm
sewer mains and appurtenances, in Byron Avenue/Road from Rohlwing Road to just
east of JoAnn Lane.
Documents:
Documents as of 6/23/2020 |
---|
Login to view documents |
Addition 1
Posted: 7/9/2020
Type of Addition: Addendum 1
Overview:
Amended Drawing
The aerial drawing within the bid
packet is incorrect. The storm sewer line was incorrectly designated as new.
This storm sewer line is existing.
The storm sewer running north/south
along Rohwling is an existing 36” RCP storm sewer that will require a new 5’
diameter manhole to be installed and connected to the existing 26” RCP and
new, proposed 21” storm sewer.
The corrected drawing is attached. |
Deadline: 7/13/2020 10:00 AM
Solicitation #: 20-6-1
Documents:
Addition 2
Posted: 7/9/2020
Type of Addition: Answers to Inquiries
Overview: Please review the questions and answer sheet.
Solicitation #: 20-6-1
Documents:
Addition 4
Posted: 7/28/2020
Type of Addition: Award Information
Overview: John Neri Construction Addison, IL
Amount: $193,500.00
Addition 5
Posted: 7/28/2020
Type of Addition: Award Information
Overview: John Neri Construction Addison, IL
Amount: $193,500.00
Posted: 7/9/2020
Type of Addition: Addendum 1
Overview:
Amended Drawing
The aerial drawing within the bid
packet is incorrect. The storm sewer line was incorrectly designated as new.
This storm sewer line is existing.
The storm sewer running north/south
along Rohwling is an existing 36” RCP storm sewer that will require a new 5’
diameter manhole to be installed and connected to the existing 26” RCP and
new, proposed 21” storm sewer.
The corrected drawing is attached. |
Deadline: 7/13/2020 10:00 AM
Solicitation #: 20-6-1
Documents:
Posted: 7/9/2020
Type of Addition: Answers to Inquiries
Overview: Please review the questions and answer sheet.
Solicitation #: 20-6-1
Documents:
Posted: 7/28/2020
Type of Addition: Award Information
Overview: John Neri Construction Addison, IL
Amount: $193,500.00
Posted: 7/28/2020
Type of Addition: Award Information
Overview: John Neri Construction Addison, IL
Amount: $193,500.00