Whitfield County Schools Sealed Solicitation
Title: Technology - VPM Technology 2019
Deadline: 2/13/2019 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Deadline Expired
Solicitation Number: WCS-IT-2019-003
Description: Provide technology, security cameras and security system for Valley Point Middle school - New Construction
Pre-Bid Meeting Details: N/A
Documents:
Documents as of 1/23/2019 |
---|
RFP VPM - Technology 2019.pdf |
Addition 1
Posted: 1/25/2019
Type of Addition: Additional Information
Overview:
This link will contain any files that are requested. We have a school layout PDF and Camera Location layout already in the folder. Anything else that you need must be requested and will be published in this folder.
VPM Files
Question 1
Posted: 2/1/2019
Question: How many switches are needed for each IDF and MDF?
Response: A link to the parts list is below. This gives a total number of switches and Access points as well as other items specific to Cisco to accomplish stacking. Please note, that if you are responding with a different product and you feel that you can cover the location with fewer access points, you may adjust that number but please provide a heat map showing how you would lay the network out. This school has 1 MDF and 4 IDF's in the school and 1 IDF in a planned concessions stand for a total of 5 IDF's. The concession stand will only contain a single switch. https://docs.google.com/spreadsheets/d/1GrKjnBKLiKszvsyBulXxU2zzIuRKqHDIW6RQr7AgQw8/edit#gid=1321643855
Question 2
Posted: 2/6/2019
Question: Will architectural drawings (floorplans) or line drawings be provided previous to the bid due date?
Response: I had posted a link on the 29th to this folder. Let me know if it does not work. https://drive.google.com/drive/folders/12Hrp7uK_ksBbUZvzVMaITOOqfG-xSbpT
Question 3
Posted: 2/6/2019
Question: Are manufacturer equipment substitutions accepted?
Response: Per section 6.1.2 - You may offer up equivalent product or solutions to what is listed below. The intent of this statement is to allow you to respond with other manufacturers.
Posted: 1/25/2019
Type of Addition: Additional Information
Overview:
This link will contain any files that are requested. We have a school layout PDF and Camera Location layout already in the folder. Anything else that you need must be requested and will be published in this folder.
VPM Files
Posted: 2/1/2019
Question: How many switches are needed for each IDF and MDF?
Response: A link to the parts list is below. This gives a total number of switches and Access points as well as other items specific to Cisco to accomplish stacking. Please note, that if you are responding with a different product and you feel that you can cover the location with fewer access points, you may adjust that number but please provide a heat map showing how you would lay the network out. This school has 1 MDF and 4 IDF's in the school and 1 IDF in a planned concessions stand for a total of 5 IDF's. The concession stand will only contain a single switch. https://docs.google.com/spreadsheets/d/1GrKjnBKLiKszvsyBulXxU2zzIuRKqHDIW6RQr7AgQw8/edit#gid=1321643855
Posted: 2/6/2019
Question: Will architectural drawings (floorplans) or line drawings be provided previous to the bid due date?
Response: I had posted a link on the 29th to this folder. Let me know if it does not work. https://drive.google.com/drive/folders/12Hrp7uK_ksBbUZvzVMaITOOqfG-xSbpT
Posted: 2/6/2019
Question: Are manufacturer equipment substitutions accepted?
Response: Per section 6.1.2 - You may offer up equivalent product or solutions to what is listed below. The intent of this statement is to allow you to respond with other manufacturers.