Whitfield County Schools Sealed Solicitation

Title: Technology - VPM Technology 2019

Deadline: 2/13/2019 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: WCS-IT-2019-003

Description: Provide technology, security cameras and security system for Valley Point Middle school - New Construction


Pre-Bid Meeting Details: N/A


Documents:

Documents as of 1/23/2019
RFP VPM - Technology 2019.pdf
Addition 1

Posted: 1/25/2019

Type of Addition: Additional Information

Overview:

This link will contain any files that are requested.  We have a school layout PDF and Camera Location layout already in the folder.  Anything else that you need must be requested and will be published in this folder.

VPM Files

Question 1

Posted: 2/1/2019

Question: How many switches are needed for each IDF and MDF?

Response: A link to the parts list is below. This gives a total number of switches and Access points as well as other items specific to Cisco to accomplish stacking. Please note, that if you are responding with a different product and you feel that you can cover the location with fewer access points, you may adjust that number but please provide a heat map showing how you would lay the network out. This school has 1 MDF and 4 IDF's in the school and 1 IDF in a planned concessions stand for a total of 5 IDF's. The concession stand will only contain a single switch. https://docs.google.com/spreadsheets/d/1GrKjnBKLiKszvsyBulXxU2zzIuRKqHDIW6RQr7AgQw8/edit#gid=1321643855

Question 2

Posted: 2/6/2019

Question: Will architectural drawings (floorplans) or line drawings be provided previous to the bid due date?

Response: I had posted a link on the 29th to this folder. Let me know if it does not work. https://drive.google.com/drive/folders/12Hrp7uK_ksBbUZvzVMaITOOqfG-xSbpT

Question 3

Posted: 2/6/2019

Question: Are manufacturer equipment substitutions accepted?

Response: Per section 6.1.2 - You may offer up equivalent product or solutions to what is listed below. The intent of this statement is to allow you to respond with other manufacturers.

Posted: 1/25/2019

Type of Addition: Additional Information

Overview:

This link will contain any files that are requested.  We have a school layout PDF and Camera Location layout already in the folder.  Anything else that you need must be requested and will be published in this folder.

VPM Files

Posted: 2/1/2019

Question: How many switches are needed for each IDF and MDF?

Response: A link to the parts list is below. This gives a total number of switches and Access points as well as other items specific to Cisco to accomplish stacking. Please note, that if you are responding with a different product and you feel that you can cover the location with fewer access points, you may adjust that number but please provide a heat map showing how you would lay the network out. This school has 1 MDF and 4 IDF's in the school and 1 IDF in a planned concessions stand for a total of 5 IDF's. The concession stand will only contain a single switch. https://docs.google.com/spreadsheets/d/1GrKjnBKLiKszvsyBulXxU2zzIuRKqHDIW6RQr7AgQw8/edit#gid=1321643855

Posted: 2/6/2019

Question: Will architectural drawings (floorplans) or line drawings be provided previous to the bid due date?

Response: I had posted a link on the 29th to this folder. Let me know if it does not work. https://drive.google.com/drive/folders/12Hrp7uK_ksBbUZvzVMaITOOqfG-xSbpT

Posted: 2/6/2019

Question: Are manufacturer equipment substitutions accepted?

Response: Per section 6.1.2 - You may offer up equivalent product or solutions to what is listed below. The intent of this statement is to allow you to respond with other manufacturers.