County of Escambia Quote

Title: Roof Repair for Road Prison Classroom

Deadline: 5/17/2022 12:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Quote Number: FAC_HS_Prison Classroom_LB

Description: Shingle Roof Repair for Road Prison Portable
1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be
kept in a watertight/temperature safe environment prior to installation as per all manufacturers’
recommendations that apply.
2. Existing shingles (1,000 SF) and underlayment (1,000 SF) should be removed down to the lumber
deck. Remove and dispose of the existing edge metal (125 LF).
3. The lumber deck should then be assessed for any adverse moisture damage and removed and
replaced if damage is observed. Contactor should include a unit price for lumber deck.
4. Synthetic underlayment (1,000 SF) should then be installed per manufacturer’s recommendations.
5. Architectural laminate shingles (1,000 SF) should then be installed per manufacturer’s
recommendations. Ensure proper fastener spacing to adhere to local wind uplift codes.
6. Contractor should remove and replace approximately one-hundred and twenty-five (125) linear
feet of edge metal with like kind and quality material.


Projects less than $25,000 will not require a bond.

This will be one of several buildings posted for roof repair quotes within the Road Department/Road Prison Complex located at 601 Hwy 297-A in Cantonment, Florida. A pre-solicitation meeting will be held Thursday, April 14, 2022 beginning at 10:00 am. Please see attached documents for additional information regarding this project.

The meeting will begin at the location indicated on the map below:


Documents:

Documents as of 4/11/2022
Exhibit E_BID Permit App_Prison Classroom Portable.pdf
Exhibit F_FEMA Clauses.pdf
Exhibit R_Requirements for Non-Contract Insurance.pdf
Addition 1

Posted: 4/25/2022

Type of Addition: Addendum 1_Contact Information

Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450

Addition 2

Posted: 5/3/2022

Type of Addition: Addendum_Pre-Quote Walkthrough

Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.

Addition 3

Posted: 5/3/2022

Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document

Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.

Additionally, replace Exhibit E with Exhibit K.

Documents:

Addition 4

Posted: 5/9/2022

Type of Addition: Addendum_Detailed Bid Tab

Documents:

Posted: 4/25/2022

Type of Addition: Addendum 1_Contact Information

Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450

Posted: 5/3/2022

Type of Addition: Addendum_Pre-Quote Walkthrough

Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.

Posted: 5/3/2022

Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document

Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.

Additionally, replace Exhibit E with Exhibit K.

Documents:

Posted: 5/9/2022

Type of Addition: Addendum_Detailed Bid Tab

Documents: