City of Goldsboro Sealed Solicitation

Title: Big Ditch Stream Restoration

Deadline: 6/3/2024 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: RFQ 2024-002

Description:

Project Manager
Jonathan Perry, Engineering Services Manager
phone: 919-580-4317
email: jperry@goldsboronc.gov

The City of Goldsboro (the “City”) is seeking statements of qualifications (“SOQ”) from any interested party (the “Design/Engineering Consultant”) for design, engineering, and permitting services (“Services”) related to the Big Ditch Stream Restoration and Infrastructure Improvements Project (the “Project”). 

The watershed that drains into Big Ditch is 93% developed, and 35% of the area constitutes impervious land cover (Doll and Kurki-Fox, 2020). In its existing condition, Big Ditch is a heavily modified stream channel that has been straightened and armored, with many sections confined to rectangular or trapezoidal concrete channels. Aside from a small section between South John Street and Elm Street (adjoining Willow Dale Cemetery), where previous restoration activities have been completed over the past few decades, a functioning floodplain no longer exists. Local officials have reported severe flooding along the stream, evidenced by resultant property damages and road closures that are becoming more commonplace during even more frequent, less severe rainfall events.

Summary of Services
Building off recently completed efforts connected to the development and adoption of the Floodprint report, the City is seeking SOQ packages from qualified teams to provide the following services:
● Environmental Investigation + Survey
● Hydrologic and Hydraulic Modeling / Analysis
● Site Engineering / Design
● Permitting
● Cost Estimating
The selected Design/Engineering Consultant will be responsible for, in general: (i) gathering all field and geospatial data necessary to complete requisite environmental survey activities; (ii) effectively incorporating preliminary hydraulic modeling, schematic design, and cost estimate data provided by the CDDL into initial technical reports, drawing sets, and project manual(s); (iii) providing City and CDDL staff with requested documentation needs throughout the project period (e.g., written project updates, interim technical reports, etc.); and (iv) leading and completing all requisite permitting activities to ready the project for construction. 


Pre-Bid Meeting Date: 5/13/2024 10:00 AM

Pre-Bid Meeting Details: Goldsboro City Hall (200 North Center Street, Goldsboro, NC 28358). This meeting will include: (i) a brief overview of the information presented in this RFQ package; and (ii) a site walk with local officials and other members of the project team. If planning to attend the pre-submittal meeting, please RSVP via email to Jonathan Perry jperry@goldsboronc.gov) and Leslie Bartlebaugh (leslie_bartlebaugh@ncsu.edu) by 6:00pm EST on May 10, 2024.


Documents:

Documents as of 4/30/2024
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
4/30/2024 7:45:25 AM Wetherill Engineering
4/30/2024 8:00:15 AM Caldwell Design and Emgineering
4/30/2024 9:39:38 AM McGill Associates, P.A.
4/30/2024 10:10:52 AM Timmons Group
4/30/2024 10:28:07 AM Rummel, Klepper & Kahl, LLP
4/30/2024 11:14:52 AM A. Morton Thomas and Associates, Inc.
4/30/2024 2:54:49 PM RES
4/30/2024 3:16:26 PM Wildlands Engineering
4/30/2024 3:57:52 PM NC State University
4/30/2024 4:35:43 PM BIOHABITATS, INC.
4/30/2024 6:51:58 PM PWXPress
5/1/2024 8:11:17 AM IMS
5/2/2024 8:29:40 AM Stewart
5/2/2024 8:38:25 AM Geosyntec Consultants
5/2/2024 9:32:57 AM Summit Design and Engineering Services, PLLC
5/2/2024 10:40:15 AM KCI
5/3/2024 3:03:56 PM SWCA, Incorporated
5/6/2024 12:15:14 AM Blackridge Research & consulting
5/6/2024 8:37:59 AM McAdams
5/6/2024 10:19:55 AM Freese and Nichols
5/6/2024 12:17:27 PM TerraXplorations, Inc.
5/7/2024 12:49:03 PM McAdams
5/9/2024 1:54:33 PM NACCO Natural Resources Corporation
5/16/2024 10:51:14 AM ConstructConnect
5/17/2024 6:19:53 AM BALCA INC
5/17/2024 8:58:43 AM Wayne Realty & Insurance Co.
5/20/2024 9:16:50 AM Gresham Smith
5/20/2024 9:55:20 AM McCormick Taylor, Inc.
5/20/2024 10:56:33 AM WithersRavenel
5/20/2024 11:01:31 AM Andropogon Associates
5/20/2024 1:56:10 PM The Wooten Company
5/22/2024 5:17:10 AM Dodge Data & Analytics
5/23/2024 8:29:12 AM Kimley-Horn
5/23/2024 8:31:12 AM Bolton & Menk
5/23/2024 9:11:41 AM envirobidnet
5/23/2024 9:03:43 PM dodge data and analytics
5/24/2024 12:15:01 AM AG Ltd
5/24/2024 4:09:32 PM Deltek
5/29/2024 10:55:43 AM GEI Consultants
Addition 1

Posted: 5/20/2024

Type of Addition: Addendum 1

Documents:

Addition 2

Posted: 5/23/2024

Type of Addition: Addendum 2

Documents:

Posted: 5/20/2024

Type of Addition: Addendum 1

Documents:

Posted: 5/23/2024

Type of Addition: Addendum 2

Documents: