Arlington County Government Sealed Solicitation

Title: 23-DES-ITBPW-494 Sparrow Pond Restoration

Deadline: 5/8/2023 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 23-DES-ITBPW-494

Description: The restoration of sparrow pond to its original design that will produce constructed wetlands and adding a sediment forebay. within the pond a new riser structure will be installed as well as a connected outfall to the four-mile stream. Along with the pond work, a maintenance path will be installed as well as minor storm sewer improvements upstream of the pond. this project will disturb approximately 1.95 acres and resides within the Arlington Forest branch watershed. The project is located on both Arlington County property and nova parks property. This project serves to remove the significant amount of sediment that has accumulated over the years and to restore the pond to be a wetland habitat for plant and wildlife.


Pre-Bid Meeting Date: 4/21/2023 10:00 AM

Pre-Bid Meeting Details: A virtual prebid conference will be held at 10:00 a.m. on Friday, April 21, 2023 on Microsoft Teams to allow potential Bidders an opportunity to obtain clarification of the specifications and requirements of the solicitation. To join the meeting, please click the link in the solicitation, or join by dialing +1 347-973-6905 and enter Conference ID 609027812#. ATTENDANCE AT THE PREBID CONFERENCE IS OPTIONAL. Interested Bidders are, however, urged to attend.


Documents:

Documents as of 5/1/2023
Attachment A - Pricing Sheet (15).xlsx
Attachment B - Construction Drawings (1).pdf
Attachment C – Virginia Department of Labor and Industry Wage Determination Decision.pdf
Attachment D - County RFI Form Template.pdf
Attachment E - Arlington County Materials Testing Specification Reference.pdf
Attachment F - Dominion Encroachment Package.pdf
Attachment G - Geotech Report 2018-06-12.pdf
Attachment H - Geotechnical Report for Earthwork 2022-05-18.pdf
Attachment I - Northern Virginia Regional Park Authority (NVRPA) Permit.pdf
Attachment J - S Park Dr Test Holes.pdf
Attachment K - Army COE and DEQ Authorization.pdf
23-DES-ITBPW-494 Addendum 1.pdf
23-DES-ITBPW-494 (1).pdf
23-DES-ITBPW-494 Addendum 2.pdf
Addition 1

Posted: 5/8/2023

Type of Addition: In Review

Documents:

Addition 2

Posted: 6/16/2023

Type of Addition: Award Information

Documents:

Posted: 5/8/2023

Type of Addition: In Review

Documents:

Posted: 6/16/2023

Type of Addition: Award Information

Documents: