Arlington County Government Sealed Solicitation

Title: 22-DPR-ITB-479 Alcova Heights Park Renovation Phase 1

Deadline: 12/30/2021 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 22-DPR-ITB-479

Description:

For the provision of demolition, site work, utilities (stormwater, electrical), multi-use court, lighting, picnic areas, picnic shelter, fire pit, bathroom renovation, stormwater management, walkways, fencing, signage, site furnishings, reforestation area, conserved open space and landscaping.

PLEASE NOTE: There are no additional phases of this Work after Phase 1.


Pre-Bid Meeting Date: 12/7/2021 10:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.A virtual prebid conference will be held at 10:00 a.m., December 7, 2021 on Microsoft Teams to allow potential Bidders an opportunity to obtain clarification of the specifications and requirements of the solicitation. To join the meeting, please click the link on the cover page of the solicitation or join by dialing +1 347-973-6905 and enter Conference ID 654 401 66#. ATTENDANCE AT THE PREBID CONFERENCE IS OPTIONAL. Minutes of the prebid conference will be recorded by the County and may be incorporated into the solicitation documents through an Addendum. Interested Bidders are, however, urged to attend.


Documents:

Documents as of 11/23/2021
22-DPR-ITB-479 Alcova Heights Park Renovation Phase 1.pdf
Attachment A - Pricing Sheet.xlsx
Addition 1

Posted: 12/16/2021

Type of Addition: Addendum 1

Overview: The purpose of this Addendum 1 is to respond to questions received by the solicitation deadline and amend items in the solicitation.

Solicitation #: 22-DPR-ITB-479

Documents:

Addition 2

Posted: 12/20/2021

Type of Addition: Addendum 2

Overview: The purpose of this Addendum 2 is to update the Certificate of Insurance requirements.

Documents:

Addition 3

Posted: 12/30/2021

Type of Addition: In Review

Documents:

Addition 4

Posted: 3/16/2022

Type of Addition: Award Information

Documents:

Question 1

Posted: 12/2/2021

Question: We have started working on pricing this project. However, we have found out It is very challenging to find Subs and trades are going to be able to provide the pricing during the Holiday Season. I would like to request if we can have an extension for this project bid date that would be great , so we can provide you with the best service and the best pricing possible.

Response: Please see Addendum 1

Question 2

Posted: 12/8/2021

Question: It’s a little difficult because there are a couple of symbols that may be mixed up. I’ve got: 8 Benches 15 picnic tables 4 or 6 trash receptacles 4 grills The grills appear to be round dots, but there are two that are right next to each other by the pavilion that look like they’d be trash cans. But then it looks like the symbol for the trash cans might be squares because there are (2) bump outs along the path that look like trash locations. A little help?

Response: Please see Addendum 1

Question 3

Posted: 12/8/2021

Question: The Stairs treads do not have a manufacturer listed or basis of design, please clarify

Response: Please see Addendum 1

Question 4

Posted: 12/8/2021

Question: On demolition Plan C5.00 for the Gazebo, the note is Ex. Concrete Pad to Remain and Gazebo to be demolished. Also in Drawing # C5 . However, in the drawings # C6.00 and C6.10 It says Existing Picnic shelter and concrete Pad to remain. Would you please Clarify? Thank you

Response: Please see Addendum 1

Question 5

Posted: 12/9/2021

Question: Is there a Geotechnical Report available for this project? If so, please provide us a copy.

Response: Please see Addendum 1

Question 6

Posted: 12/9/2021

Question: Are there any hazardous materials on this project? If so, please provide the hazmat report.

Response: Please see Addendum 1

Question 7

Posted: 12/9/2021

Question: Section 2.1.4 of ITB requests for the pollution liability policy. Please confirm that’s correct.

Response: Please see Addendum 1

Question 8

Posted: 12/9/2021

Question: Please provide the following missing specification sections: a. Earthwork b. Erosion/sediment controls c. Site utilities d. Site concrete e. Asphalt pavement f. Marking/striping g. Landscape h. Color court surfaces and equipment i. Metal handrails j. Picnic shelter k. Site furnishing

Response: Please see Addendum 1

Question 9

Posted: 12/9/2021

Question: Drawing LJ1.01 has a legend which indicates areas requiring temporary root protection matting, root aeration matting, and handwork. There are details for the root protection / aeration matting shown on drawing LJ5.02 along the tree protection fences. Please confirm those areas requires both root protection matting and aeration matting.

Response: Please see Addendum 1

Question 10

Posted: 12/9/2021

Question: Storm sewer profile on drawing C14.00 shows a new 24” RCP pipe from the existing structure 15857 to the new structure 15857A. Drawing C7.20 and C16.20 show other new pipe layouts but not the new 24” RCP pipe. Please provide the new 24” RCP pipe on the plans so we can determine its length.

Response: Please see Addendum 1

Question 11

Posted: 12/9/2021

Question: Drawing M000, note 5 of the restroom renovation states to ensure continued system operation during construction. Please confirm.

Response: Please see Addendum 1

Question 12

Posted: 12/9/2021

Question: Drawing LJ1 and LJ2 show the tree replacement calculations. Please advise if we’re replacing trees for the sitewide totals of 136 trees and 93 trees removed or RPA total of 68 trees and 54 trees removed.

Response: Please see Addendum 1

Question 13

Posted: 12/9/2021

Question: What’s the requirements and period of maintenance for the new landscape work?

Response: Please see Addendum 1

Question 14

Posted: 12/9/2021

Question: Specification section 014000 – Quality Requirements, part 1.7B states to have a full-time QC Manager with no other duties. Please confirm.

Response: Please see Addendum 1

Question 15

Posted: 12/9/2021

Question: The tile being used on walls is a 12x24. Detail 3/A601 states to be a bullnose finish. 12x24 tile do not come with bullnose finish. Please confirm if we can use a Schluter instead. If so, please specify the finish (i.e., anodized aluminum, stainless steel, brushed chrome).

Response: Please see Addendum 1

Question 16

Posted: 12/9/2021

Question: Doors 01, 02 & 03 are 6’8” opening height. A 4” frame face head will not course out with the CMU. Can the frames be supplied with a standard 2” frame face? Please advise.

Response: Please see Addendum 1

Question 17

Posted: 12/9/2021

Question: Based on details 8 & 9/A801, the material for Window “W1” is aluminum. Please confirm.

Response: Please see Addendum 1

Question 18

Posted: 12/9/2021

Question: Most of the subcontractors/vendors are closed during the week of Christmas and New Year. Can the bid date be extended to the first week of January?

Response: Please see Addendum 1

Question 19

Posted: 12/9/2021

Question: All, I send in this request for clarification for the Alcova Heights Park renovation project. The electrical plan sheet E1.00 note 1 calls out for a push button/strobe on each of the (2) basketball poles. In the design process it was determined that a push button would be factory welded onto pole BA2 at approximately 3.5 feet above grade level. It appears redundant to have a push button strobe on each pole BA1 and BA2. It is possible to do both poles according to the Musco Controls team, but wanted to clarify the desire of 1 or 2 push button strobes. Please advise.

Response: Please see Addendum 1

Question 20

Posted: 12/10/2021

Question: Detail 2 on sheet E001 in the architectural drawings refers to a note 7. However, there is no keynote 7 on this detail. Additionally keynote 6 doesn't appear to be used. Please clarify.

Response: Please see Addendum 1

Question 21

Posted: 12/10/2021

Question: Please clarify if any shoring at the restroom building is required during construction? Please clarify who will be responsible for providing shoring details as none have been included.

Response: Please see Addendum 1

Question 22

Posted: 12/10/2021

Question: Detail H1 on sheet A701 shows a bond beam as the header for each new door. However, detail 3 on sheet S201 shows two courses of CMU above the door with the top course of CMU to be a bond beam. Please confirm that there should be two courses of CMU above the door and the lower of the two course shall be a bond beam.

Response: Please see Addendum 1

Question 23

Posted: 12/10/2021

Question: Many of the sheets in the civil drawing set either do not print or only partially print. Sheets C11.10 does not have any information on it when printed, and sheets 56-68 do not print at all. Sheets C12.00, C13.10, C17.10, and E1.00 all only partially print. We are concerned that this could result in missed scopes. Can you please reissue these sheets?

Response: Please see Addendum 1

Question 24

Posted: 12/10/2021

Question: Who is responsible for acquiring the right of way permits?

Response: Please see Addendum 1

Question 25

Posted: 12/10/2021

Question: C8.00 and C8.10 have grade specified up to 5% in areas without handrails. Per note 4, only up to 4.8% can be specified without adding handrails. Please clarify.

Response: Please see Addendum 1

Question 26

Posted: 12/10/2021

Question: 2/L1.01 appears to show a new retaining wall structure. This is supposed to be a salvaged retaining wall where the stone is carefully removed and reinstalled after the stairs are added. Please advise if the retaining wall should be new instead.

Response: Please see Addendum 1

Question 27

Posted: 12/10/2021

Question: The site drawings refer to use by hand for demo? That is a very unclear statement, The small asphalt trail to be removed has the ability for a small bobcat to remove this, Please clarify this item

Response: Please see Addendum 1

Question 28

Posted: 12/10/2021

Question: Will the park be closed during the renovation.

Response: Please see Addendum 1

Question 29

Posted: 12/10/2021

Question: Can True bounce be a alternate equivalent to the bison?

Response: Please see Addendum 1

Question 30

Posted: 12/10/2021

Question: Detail 1 on Sheet A501 appears to shows roofing assembly to include one layer of "POLYISOCYANURATE FOAM-PLASTIC BOARD INSULATION" per note 7.37 and another layer of "3.0 INCHES THICK, R-15" per note 7.38. Please clarify the specification for the insulation referred to in 7.38.

Response: Please see Addendum 1

Question 31

Posted: 12/10/2021

Question: The materials plan in the civil set calls for a "granite cobble tree ring" and refers to detail 7/L1.00. This detail is for a handrail @ ramp. Please clarify.

Response: Please see Addendum 1

Posted: 12/16/2021

Type of Addition: Addendum 1

Overview: The purpose of this Addendum 1 is to respond to questions received by the solicitation deadline and amend items in the solicitation.

Solicitation #: 22-DPR-ITB-479

Documents:

Posted: 12/20/2021

Type of Addition: Addendum 2

Overview: The purpose of this Addendum 2 is to update the Certificate of Insurance requirements.

Documents:

Posted: 12/30/2021

Type of Addition: In Review

Documents:

Posted: 3/16/2022

Type of Addition: Award Information

Documents:

Posted: 12/2/2021

Question: We have started working on pricing this project. However, we have found out It is very challenging to find Subs and trades are going to be able to provide the pricing during the Holiday Season. I would like to request if we can have an extension for this project bid date that would be great , so we can provide you with the best service and the best pricing possible.

Response: Please see Addendum 1

Posted: 12/8/2021

Question: It’s a little difficult because there are a couple of symbols that may be mixed up. I’ve got: 8 Benches 15 picnic tables 4 or 6 trash receptacles 4 grills The grills appear to be round dots, but there are two that are right next to each other by the pavilion that look like they’d be trash cans. But then it looks like the symbol for the trash cans might be squares because there are (2) bump outs along the path that look like trash locations. A little help?

Response: Please see Addendum 1

Posted: 12/8/2021

Question: The Stairs treads do not have a manufacturer listed or basis of design, please clarify

Response: Please see Addendum 1

Posted: 12/8/2021

Question: On demolition Plan C5.00 for the Gazebo, the note is Ex. Concrete Pad to Remain and Gazebo to be demolished. Also in Drawing # C5 . However, in the drawings # C6.00 and C6.10 It says Existing Picnic shelter and concrete Pad to remain. Would you please Clarify? Thank you

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Is there a Geotechnical Report available for this project? If so, please provide us a copy.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Are there any hazardous materials on this project? If so, please provide the hazmat report.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Section 2.1.4 of ITB requests for the pollution liability policy. Please confirm that’s correct.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Please provide the following missing specification sections: a. Earthwork b. Erosion/sediment controls c. Site utilities d. Site concrete e. Asphalt pavement f. Marking/striping g. Landscape h. Color court surfaces and equipment i. Metal handrails j. Picnic shelter k. Site furnishing

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Drawing LJ1.01 has a legend which indicates areas requiring temporary root protection matting, root aeration matting, and handwork. There are details for the root protection / aeration matting shown on drawing LJ5.02 along the tree protection fences. Please confirm those areas requires both root protection matting and aeration matting.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Storm sewer profile on drawing C14.00 shows a new 24” RCP pipe from the existing structure 15857 to the new structure 15857A. Drawing C7.20 and C16.20 show other new pipe layouts but not the new 24” RCP pipe. Please provide the new 24” RCP pipe on the plans so we can determine its length.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Drawing M000, note 5 of the restroom renovation states to ensure continued system operation during construction. Please confirm.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Drawing LJ1 and LJ2 show the tree replacement calculations. Please advise if we’re replacing trees for the sitewide totals of 136 trees and 93 trees removed or RPA total of 68 trees and 54 trees removed.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: What’s the requirements and period of maintenance for the new landscape work?

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Specification section 014000 – Quality Requirements, part 1.7B states to have a full-time QC Manager with no other duties. Please confirm.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: The tile being used on walls is a 12x24. Detail 3/A601 states to be a bullnose finish. 12x24 tile do not come with bullnose finish. Please confirm if we can use a Schluter instead. If so, please specify the finish (i.e., anodized aluminum, stainless steel, brushed chrome).

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Doors 01, 02 & 03 are 6’8” opening height. A 4” frame face head will not course out with the CMU. Can the frames be supplied with a standard 2” frame face? Please advise.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Based on details 8 & 9/A801, the material for Window “W1” is aluminum. Please confirm.

Response: Please see Addendum 1

Posted: 12/9/2021

Question: Most of the subcontractors/vendors are closed during the week of Christmas and New Year. Can the bid date be extended to the first week of January?

Response: Please see Addendum 1

Posted: 12/9/2021

Question: All, I send in this request for clarification for the Alcova Heights Park renovation project. The electrical plan sheet E1.00 note 1 calls out for a push button/strobe on each of the (2) basketball poles. In the design process it was determined that a push button would be factory welded onto pole BA2 at approximately 3.5 feet above grade level. It appears redundant to have a push button strobe on each pole BA1 and BA2. It is possible to do both poles according to the Musco Controls team, but wanted to clarify the desire of 1 or 2 push button strobes. Please advise.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Detail 2 on sheet E001 in the architectural drawings refers to a note 7. However, there is no keynote 7 on this detail. Additionally keynote 6 doesn't appear to be used. Please clarify.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Please clarify if any shoring at the restroom building is required during construction? Please clarify who will be responsible for providing shoring details as none have been included.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Detail H1 on sheet A701 shows a bond beam as the header for each new door. However, detail 3 on sheet S201 shows two courses of CMU above the door with the top course of CMU to be a bond beam. Please confirm that there should be two courses of CMU above the door and the lower of the two course shall be a bond beam.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Many of the sheets in the civil drawing set either do not print or only partially print. Sheets C11.10 does not have any information on it when printed, and sheets 56-68 do not print at all. Sheets C12.00, C13.10, C17.10, and E1.00 all only partially print. We are concerned that this could result in missed scopes. Can you please reissue these sheets?

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Who is responsible for acquiring the right of way permits?

Response: Please see Addendum 1

Posted: 12/10/2021

Question: C8.00 and C8.10 have grade specified up to 5% in areas without handrails. Per note 4, only up to 4.8% can be specified without adding handrails. Please clarify.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: 2/L1.01 appears to show a new retaining wall structure. This is supposed to be a salvaged retaining wall where the stone is carefully removed and reinstalled after the stairs are added. Please advise if the retaining wall should be new instead.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: The site drawings refer to use by hand for demo? That is a very unclear statement, The small asphalt trail to be removed has the ability for a small bobcat to remove this, Please clarify this item

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Will the park be closed during the renovation.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Can True bounce be a alternate equivalent to the bison?

Response: Please see Addendum 1

Posted: 12/10/2021

Question: Detail 1 on Sheet A501 appears to shows roofing assembly to include one layer of "POLYISOCYANURATE FOAM-PLASTIC BOARD INSULATION" per note 7.37 and another layer of "3.0 INCHES THICK, R-15" per note 7.38. Please clarify the specification for the insulation referred to in 7.38.

Response: Please see Addendum 1

Posted: 12/10/2021

Question: The materials plan in the civil set calls for a "granite cobble tree ring" and refers to detail 7/L1.00. This detail is for a handrail @ ramp. Please clarify.

Response: Please see Addendum 1