County of Escambia Quote

Title: 1209 West Bobe Street Interior and Exterior

Deadline: 3/24/2023 5:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Quote Number: CRA_3.8.23_ep4

Description: WINDOWS:
Replace the existing (12) windows with new single-hung vinyl windows. These units are to be complete with trims, impact ratings, screens and low-e glass.

EXTERIOR DOORS:
Replace front and side entry door units with hurricane rated metal clad insulated 6 panel door units with thresholds, weather stripping, trim, caulk and painted. Entry doors are to have a peep holes. Install new dead bolts and lock sets that are keyed alike on all new exterior door units.
FLOORING:
Remove all of the existing flooring and install a LVP on a floating membrane. Install wood base and shoe molding or 1/4 round.
CABINETRY:
We will be keeping the cabinets in kitchen and bathroom. Please clean and paint the interior and exterior of these cabinets, leaving the drawers boxes unfinished. Install approximately 18 linear feet of new standard grade post formed countertop with an incorporated back splash and cap all ends in the kitchen and bathroom. CRA is to be selecting the color. Install new knobs and pulls on new cabinets with CRA selecting the style.
 INTERIOR DOORS:
Remove existing damaged door unit with matching 6 panel doors. Reinstall the closet doors and replace any that are found to be damaged. Finish new doors to match existing doors as close as possible. Raise the header to the laundry room and reframe, adding a new door. Install new door hardware matching the new exterior doors.
  INTERIOR WALLS and CEILINGS:
Repair all drywall surfaces that are damaged and due to code up-grades and existing surfaces that are damaged or incomplete. Repaired areas are to match as close as possible to existing with; drywall, tape, mud, texture and paint. Paint the exterior and interior of the home per CRA’s color selection. 

*Pre bid onsite visit will be March 17 11:00 am*
Contact Everett Parker at ecparker@myecsambia.com for further information            





Question 1

Posted: 3/9/2023

Question: The way this project is posted is confusing. No prebid meeting and trades bid individual. Please clarified

Response: *Pre bid onsite visit will be March 17 11:00 am*

Question 2

Posted: 3/13/2023

Question: Do you have a pre bid date yet?

Response: *Pre bid onsite visit will be March 17 11:00 am*

Question 3

Posted: 3/13/2023

Question: will there a pre-bid

Response: *Pre bid onsite visit will be March 17 11:00 am*

Posted: 3/9/2023

Question: The way this project is posted is confusing. No prebid meeting and trades bid individual. Please clarified

Response: *Pre bid onsite visit will be March 17 11:00 am*

Posted: 3/13/2023

Question: Do you have a pre bid date yet?

Response: *Pre bid onsite visit will be March 17 11:00 am*

Posted: 3/13/2023

Question: will there a pre-bid

Response: *Pre bid onsite visit will be March 17 11:00 am*