Lakeland Sealed Solicitation

Title: Bids for FY23 Street Paving

Deadline: 2/7/2023 2:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Description: This project consists of mill and overlay in the Evergreen Hills Subdivision, Bentbrooke Hills Subdivision and Salem Road as depicted on the enclosed maps. Curb and gutter along with ADA Ramp replacement will be conducted in the Evergreen Hills Subdivision. In addition, two concrete ADA Ramps will be replaced at the raised crosswalk located on Maple Walk Dr. in The Grove Subdivision. A 5-foot wide concrete sidewalk and two concrete ADA ramps will be installed from the intersection of Maple Walk Dr. and Gillespie Oak Dr. to the intersection of Mt Gillespie Dr and Gillespie Oak Dr. in the Oakwood Subdivision.


Documents:

Documents as of 1/27/2023
FY2023 Street Paving Bid Documents.pdf