St. Johns River Water Management District Sealed Solicitation

Title: IFB 37679 Hubler Mitigation Area Fencing

Deadline: 3/22/2022 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: 37679

Description: removal of two sets of double gates and old board fence removal and replacement of one 16-foot gate, approximately 80 feet of four board wooden entrance fence and 700 feet of five wired barbed wire in locations indicated on the schematic drawing (Figure 2). All lengths shall be field verified by the contractor prior to commencing the work. All removed materials will need to be removed from the property and disposed of properly by Contractor.


Documents:

Documents as of 3/10/2022
IFB 37679_Replacement and removal of fence Hubler Mitgation Area.pdf