Whitfield County Schools Sealed Solicitation

Title: Technology - Valley Point Middle Multimedia Equipment

Deadline: 4/17/2019 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: WCS-IT-2019-007

Description: Provide and install multimedia equipment in new Valley Point Middle school.  Installation must be coordinated with construction schedule.


Pre-Bid Meeting Date: 3/20/2019 6:00 AM

Pre-Bid Meeting Details: Meeting will be online Google Meeting. Must click link in RFP to sign up for attendance. Actual time of meeting will be given on registration.


Documents:

Documents as of 3/12/2019
Technology - VPM Multi Media 2019.pdf
Addition 1

Posted: 3/20/2019

Type of Addition: Questions from Pre-Bid Meeting

Overview:


Hunter Smith10:39 AM

Will you guys add in an addendum to the bid for wireless control?  The hardware listed in the spec contains wireless components.  If you are bidding solutions to match the hardware, then it should meet that requirement.


Frank Wallace 10:40 AM

So we are home running the entire system back to rack room? Yes, the speakers and core systems will be housed in a rack provided in the storage area.  The desire is for the controls to be wireless.


Scott Kutheis10:40 AM

Can you discuss allowing alternates or substitutions for the equipment?  As long are the piece of hardware has equivalent specs as the requested piece of hardware, then we are interested in looking at your solution.  For example, If you have a speaker that has the same specs as the one in our big, but a different brand, then you may use it in your quote.


Hunter Smith10:41 AM

Also are we responsible for conduit runs?  No you will not be responsible for conduit runs.




Question 1

Posted: 3/15/2019

Question: Does this project allow substitutions for media equipment on the bid?

Response: Please refer to section 6.1.2

Question 2

Posted: 3/15/2019

Question: Hello! This is Aaron from Sweetwater. We carry Sennheiser, Denon, Soundcraft, JBL, Crown, AKG, Whirlwind and can help with the XLR connectors. Will you take bids by line item, or do you require a complete quote of all requested items? Thanks!

Response: Bid must be complete. Items can be substituted with other brands of equal quality.

Question 3

Posted: 3/19/2019

Question: Hello! Is installation mandatory for the bid or can we provide products only? Also, is the online pre-proposal meeting really at 6AM EST on 3/20? I wasn't able to register on 3/18, is it too late to do so?

Response: Installation is mandatory. If you signed up by the deadline, then you received an invite to the meeting with the appropriate time. Yes the deadline for signing up with yesterday.

Question 4

Posted: 3/20/2019

Question: Will the awarded company have the responsibility of running conduit?

Response: No, that is under a different scope of the building being built.

Question 5

Posted: 3/26/2019

Question: What is the construction schedule for this project?

Response: At this point all we know is that substantial completion is Feb 20, 2020 & final completion is March 19, 2020. These are subject to change. As for this project we won't know exactly when we'll be able to install equipment.

Posted: 3/20/2019

Type of Addition: Questions from Pre-Bid Meeting

Overview:


Hunter Smith10:39 AM

Will you guys add in an addendum to the bid for wireless control?  The hardware listed in the spec contains wireless components.  If you are bidding solutions to match the hardware, then it should meet that requirement.


Frank Wallace 10:40 AM

So we are home running the entire system back to rack room? Yes, the speakers and core systems will be housed in a rack provided in the storage area.  The desire is for the controls to be wireless.


Scott Kutheis10:40 AM

Can you discuss allowing alternates or substitutions for the equipment?  As long are the piece of hardware has equivalent specs as the requested piece of hardware, then we are interested in looking at your solution.  For example, If you have a speaker that has the same specs as the one in our big, but a different brand, then you may use it in your quote.


Hunter Smith10:41 AM

Also are we responsible for conduit runs?  No you will not be responsible for conduit runs.




Posted: 3/15/2019

Question: Does this project allow substitutions for media equipment on the bid?

Response: Please refer to section 6.1.2

Posted: 3/15/2019

Question: Hello! This is Aaron from Sweetwater. We carry Sennheiser, Denon, Soundcraft, JBL, Crown, AKG, Whirlwind and can help with the XLR connectors. Will you take bids by line item, or do you require a complete quote of all requested items? Thanks!

Response: Bid must be complete. Items can be substituted with other brands of equal quality.

Posted: 3/19/2019

Question: Hello! Is installation mandatory for the bid or can we provide products only? Also, is the online pre-proposal meeting really at 6AM EST on 3/20? I wasn't able to register on 3/18, is it too late to do so?

Response: Installation is mandatory. If you signed up by the deadline, then you received an invite to the meeting with the appropriate time. Yes the deadline for signing up with yesterday.

Posted: 3/20/2019

Question: Will the awarded company have the responsibility of running conduit?

Response: No, that is under a different scope of the building being built.

Posted: 3/26/2019

Question: What is the construction schedule for this project?

Response: At this point all we know is that substantial completion is Feb 20, 2020 & final completion is March 19, 2020. These are subject to change. As for this project we won't know exactly when we'll be able to install equipment.