County of Beaufort Sealed Solicitation
Title: Spanish Moss Trail Battery Creek Bridge Repair Phase 2
Deadline: 11/15/2023 3:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: IFB 110123
Description: It is the intent of Beaufort County to solicit competitive sealed proposal from qualified and experienced marine contractors to provide construction services for the repairs to the existing Battery Creek Bridge along Spanish Moss Trail in Beaufort, South Carolina.
Pre-Bid Meeting Date: 10/10/2023 2:00 PM
Pre-Bid Meeting Details: This is a virtual meeting. Email dthomas@bcgov.net to receive your invite
Documents:
Documents as of 9/26/2023 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
PLANHOLDERS:
Date | Company Name |
---|---|
9/27/2023 9:37:16 AM | Clean Masters |
9/27/2023 9:46:43 AM | APAC-Atlantic, Inc. |
9/27/2023 9:54:31 AM | M A J Enterprises Inc |
9/27/2023 10:37:26 AM | First Construction Management |
9/27/2023 5:00:13 PM | Soil Consultants Inc. |
9/27/2023 10:26:06 PM | TShayEnterprise |
9/28/2023 8:02:10 AM | Alpha Construction Company |
9/28/2023 8:44:56 AM | Lewallen Construction |
9/29/2023 7:06:29 AM | Cape Romain Contractors |
9/29/2023 8:25:24 AM | Diamond Concrete Products LLC |
9/29/2023 10:13:48 AM | Eadie's Diva D Enterprises LLC |
9/29/2023 3:35:03 PM | Strickland Waterproofing Co. Inc. |
10/4/2023 3:34:39 PM | onvia |
10/10/2023 3:45:36 PM | SJ Hamill Construction, LLC |
10/10/2023 5:54:04 PM | dodge data and analytics |
10/10/2023 7:37:39 PM | IVS Hydro Demolition Service |
10/11/2023 2:36:02 PM | R. L. Morrison & Sons, Inc. |
10/12/2023 1:50:14 AM | PWXPress |
10/18/2023 12:07:21 PM | Republic Contracting Corporation, Inc. |
10/25/2023 3:59:31 PM | Eastman Marine Construction LLC |
10/26/2023 4:38:02 AM | Dodge Data & Analytics |
10/31/2023 4:19:23 PM | Eastman Marine Construction, LLC |
11/2/2023 2:43:50 AM | Andre Construction Company LLC |
11/3/2023 8:34:55 AM | OQuinn Marine Construction Inc. |
11/8/2023 6:59:55 PM | ConstructConnect |
11/9/2023 3:00:34 AM | Dodge Data |
11/9/2023 3:04:56 AM | AG Ltd |
11/9/2023 4:56:05 AM | envirobidnet |
11/9/2023 7:38:31 AM | O'Quinn Marine Construction,Inc. |
11/9/2023 8:15:40 AM | Flanders Engineering Group, Inc. |
11/9/2023 8:29:50 AM | Dodge Data & Analytics |
11/10/2023 12:56:25 PM | Greenway Bridge LLC |
11/11/2023 1:05:12 PM | Nix Construction Company Inc. |
11/13/2023 10:11:25 AM | Titan Construction Management LLC |
11/15/2023 6:42:36 AM | McSweeney Engineers |
11/27/2023 10:45:25 AM | Rakes Building and Maintenance Contractors, LLC |
12/8/2023 1:17:07 PM | NDS Stormwater |
12/24/2023 11:37:46 AM | Dock Hardware & Marine fabrication |
2/8/2024 4:04:36 AM | Deltek |
Addition 1
Posted: 10/10/2023
Type of Addition: Addendum 1 Spanish Moss Trail Bridge Repair Phase 2
Documents:
Addition 3
Posted: 11/8/2023
Type of Addition: Addendum 3, Spanish Moss Trail Phase 2
Documents:
Addition 4
Posted: 11/15/2023
Type of Addition: In Review
Addition 5
Posted: 1/19/2024
Type of Addition: Award Information
Overview: This was awarded to O'Quinn Marine Construction Inc. for the amount of $550,000.00
Amount: $550,000.00
Question 1
Posted: 10/18/2023
Question: 1) What is the width (transverse, side to side of bridge) of the blockouts? see sh. S3 2) Any criteria for sheeting to be driven other than plumbness tolerances and installed depth? 3) There is a sheet S8 referenced in a note on the plans [where??] but no S8. 4) Dimensions/depth of neoprene expansion joint? see C1 on S4 5) Where is the expansion joint to be installed? Only at interface between approach slabs and 12' bridge and 12' trail (ie, 2 runs at 12' for each approach slab, ie 48 LF?) 6) Locations with measurements indexed to something for control joints? 7) Concrete Washout note 3 states washouts shall be located at least 50' from storm drain, creek bank or perimeter control. This would appear to be a hard setback to maintain. Can this setback be lessened or waived? 8) Where is rock filter french drain installed, along edge of abutment facing water, or entire sheeting perimeter? Or something different? 9) Also, details notes 1 cu ft of rock on detail C2S4. Should this be 1 sq ft, 12" on a side? 10) Can we work with equipment to move riprap, etc. according to the permit? 11) Where can we stage equipment and material? 12) Section 012600 1.3A2 refers to only 5 days to propose change order pricing and schedule. This seems to be a overly quick turnaround time. Would the county consider allowing more time?
Response: See Addendum 3, which provides answers your questions above.
Posted: 10/10/2023
Type of Addition: Addendum 1 Spanish Moss Trail Bridge Repair Phase 2
Documents:
Posted: 11/8/2023
Type of Addition: Addendum 3, Spanish Moss Trail Phase 2
Documents:
Posted: 11/15/2023
Type of Addition: In Review
Posted: 1/19/2024
Type of Addition: Award Information
Overview: This was awarded to O'Quinn Marine Construction Inc. for the amount of $550,000.00
Amount: $550,000.00
Posted: 10/18/2023
Question: 1) What is the width (transverse, side to side of bridge) of the blockouts? see sh. S3 2) Any criteria for sheeting to be driven other than plumbness tolerances and installed depth? 3) There is a sheet S8 referenced in a note on the plans [where??] but no S8. 4) Dimensions/depth of neoprene expansion joint? see C1 on S4 5) Where is the expansion joint to be installed? Only at interface between approach slabs and 12' bridge and 12' trail (ie, 2 runs at 12' for each approach slab, ie 48 LF?) 6) Locations with measurements indexed to something for control joints? 7) Concrete Washout note 3 states washouts shall be located at least 50' from storm drain, creek bank or perimeter control. This would appear to be a hard setback to maintain. Can this setback be lessened or waived? 8) Where is rock filter french drain installed, along edge of abutment facing water, or entire sheeting perimeter? Or something different? 9) Also, details notes 1 cu ft of rock on detail C2S4. Should this be 1 sq ft, 12" on a side? 10) Can we work with equipment to move riprap, etc. according to the permit? 11) Where can we stage equipment and material? 12) Section 012600 1.3A2 refers to only 5 days to propose change order pricing and schedule. This seems to be a overly quick turnaround time. Would the county consider allowing more time?
Response: See Addendum 3, which provides answers your questions above.