Peralta Community College District Sealed Solicitation

Title: Electrical Lighting and Blue Phone Installations at Laney College, Department of General Services, and College of Alameda Aviation - Rebid

Deadline: 4/16/2024 2:00 PM   (UTC-08:00) Pacific Time (US & Canada)

Status: In Review

Solicitation Number: iBid 23 24 12

Description: Provide new exterior building light fixtures, Provide electrical power conduits and breakers to support lighting installations and provide power to security camera locations. Repair existing emergency help points and provide and install new emergency help points as indicated in documents. This is a rebid of iBid 23-24/09.


Pre-Bid Meeting Date: 4/4/2024 10:00 AM

Pre-Bid Meeting Details: A non-mandatory bid walk will take place on April 4, 2024 at 10am, meeting at 900 Fallon Street, Laney College, at the flag pole, and proceed to the two other campuses from there.


Documents:

Documents as of 4/12/2024
iBid_23_24_12_Notice_to_Bidders.pdf
iBid_23_24_12_Electrical_Blue_Phone_Installation_at_LC_DGS_COA.pdf
iBid_23_24_12_Contract_Template.pdf
SLBE_Program_and_Affidavit.pdf
A_PowerForm_flood_PFF_Gen2.pdf
A_PowerForm_LED_high_output_floodlight_PFF_installation_instructions_Yoke.pdf
BCS_WS_CS_FSP_3x1B.pdf
COA_REV_0_PERMIT_SET.pdf
MCAP_PCS_Duo_Power_Control_Signal_Type_MC_All_Purpose.spec.pdf
TORK_ASTRO_TIMER.pdf
A_OPF_M_OptiForm_Medium.pdf
B_LBX_LED_linear_suspended.pdf
C_GWM_GeoForm_Wedge_Medium.pdf
C_GWM_GeoForm_Wedge_Medium_Install_Instructions.pdf
D_PowerForm_flood_PFF_Gen2.pdf
DGS_REV_0_PERMIT_SET.pdf
F_OPF_S_Spec_Sheet.pdf
ae_103_cb1w_AE_Specifications.pdf
ae_186_LS1000_AE_Specifications.pdf
AVPL_RTA_20_40_188.pdf
cad_107_CB1_w_2D_Drawing.pdf
cad_172_LS1000_2D_Drawing.pdf
cps_181_LS1000.pdf
cps_186_CB1w.pdf
datasheet_gxp2170_english.pdf
gu_157_CB1_Series_Admin_Guide.pdf
gu_164_LS1000_Admin_Guide.pdf
GXP21xx_Administration_Guide_1.pdf
GXP21xx_User_Guide_.pdf
GXP2170_QIG.pdf
Integrated_Power_Center_2_Handout_2021_.pdf
Integrated_Power_Center_2_IPC_754225MB2225MB.pdf
LCC_REV_0_PERMIT_SET.pdf
PB_001_Christy_N30.pdf
PB_002_Christy_1234_Traffic_Rated.pdf
RapidSource_INEQ_75KVA480V225MB208225MB_Dan_Cross_List_Pricing_76143422_1_1_.pdf
sln_107_Cloud_Product_Sheet.pdf
sln_121_4G_LTE_Cellular_Product_Sheet.pdf
sln_139_5G_Cellular_Product_Sheet.pdf
iBid_23_24_12_Pre_bid_walk_sign_in_sheet.pdf
iBid_23_24_12_Addendum_One.pdf
iBid_23_24_12_Addendum_Two.pdf
Addition 1

Posted: 4/10/2024

Type of Addition: Addendum

Overview: Addendum One contains the responses to questions 3 - 6 asked here for clarifications of the project details. 

Documents:

Addition 2

Posted: 4/12/2024

Type of Addition: Addendum

Overview: Addendum Two only contains the bid opening meeting details. 

Documents:

Addition 3

Posted: 4/16/2024

Type of Addition: In Review

Documents:

Addition 4

Posted: 4/16/2024

Type of Addition: In Review

Addition 5

Posted: 4/16/2024

Type of Addition: In Review

Question 1

Posted: 3/29/2024

Question: Where is the scope of work or project manual?

Response: The scope of work is on the cover sheet. As for "project manual"; there isn't one, however there are cutsheets to the lighting fixtures.

Question 2

Posted: 3/29/2024

Question: what is the engineering price?

Response: The engineer's estimate is $130,000.

Question 3

Posted: 4/8/2024

Question: Provide details for electric trenches where required for light fixture installation.

Response: For LCC, see Detail #2 on Sheet E6.1 for conduit trench.

Question 4

Posted: 4/8/2024

Question: Are the footings for the light fixtures to be reused or are new footings required? If new are required please provide details and quantity.

Response: For LCC, base scope assumes all existing footings shall be reused. The installation of new replacement pole and existing poles shall be assessed by Contractor, and all necessary repairs shall be provided per typical Detail 4 on Sheet E6.1, and Key Note #6 on E1.3 for new pole. When providing the new replacement pole furnish with structural analysis and calcs. from A/V Poles, this should be an option when ordering from this manufacturer, Contractor shall provide all required field investigation and information to manufacturer as required by them. If any footings are damaged beyond reuse or do not match the requirements of the structural analysis and calcs., then report these findings and assessment via RFI.

Question 5

Posted: 4/8/2024

Question: Who is to provide programming for blue phones?

Response: For LCC, provide equipment with commissioning and start-up services from Code Blue. See EQP/001 on Sheet E0.5.

Question 6

Posted: 4/8/2024

Question: Provide approximate length of trenches needed for light fixture installation.

Response: For LCC, approximately 228’-0” with branch circuit offshoots to each pole that requires interconnection, based on the drawing scale (1” = 20’-0”). See sheet E1.3.

Posted: 4/10/2024

Type of Addition: Addendum

Overview: Addendum One contains the responses to questions 3 - 6 asked here for clarifications of the project details. 

Documents:

Posted: 4/12/2024

Type of Addition: Addendum

Overview: Addendum Two only contains the bid opening meeting details. 

Documents:

Posted: 4/16/2024

Type of Addition: In Review

Documents:

Posted: 4/16/2024

Type of Addition: In Review

Posted: 4/16/2024

Type of Addition: In Review

Posted: 3/29/2024

Question: Where is the scope of work or project manual?

Response: The scope of work is on the cover sheet. As for "project manual"; there isn't one, however there are cutsheets to the lighting fixtures.

Posted: 3/29/2024

Question: what is the engineering price?

Response: The engineer's estimate is $130,000.

Posted: 4/8/2024

Question: Provide details for electric trenches where required for light fixture installation.

Response: For LCC, see Detail #2 on Sheet E6.1 for conduit trench.

Posted: 4/8/2024

Question: Are the footings for the light fixtures to be reused or are new footings required? If new are required please provide details and quantity.

Response: For LCC, base scope assumes all existing footings shall be reused. The installation of new replacement pole and existing poles shall be assessed by Contractor, and all necessary repairs shall be provided per typical Detail 4 on Sheet E6.1, and Key Note #6 on E1.3 for new pole. When providing the new replacement pole furnish with structural analysis and calcs. from A/V Poles, this should be an option when ordering from this manufacturer, Contractor shall provide all required field investigation and information to manufacturer as required by them. If any footings are damaged beyond reuse or do not match the requirements of the structural analysis and calcs., then report these findings and assessment via RFI.

Posted: 4/8/2024

Question: Who is to provide programming for blue phones?

Response: For LCC, provide equipment with commissioning and start-up services from Code Blue. See EQP/001 on Sheet E0.5.

Posted: 4/8/2024

Question: Provide approximate length of trenches needed for light fixture installation.

Response: For LCC, approximately 228’-0” with branch circuit offshoots to each pole that requires interconnection, based on the drawing scale (1” = 20’-0”). See sheet E1.3.