Buffalo Grove Sealed Solicitation

Title: 2022 Cambridge on the Lake Lift Station Reconstruction

Deadline: 11/18/2021 9:00 AM   (UTC-06:00) Central Time (US & Canada)

Status: Awarded

Solicitation Number: VoBG-2021-03

Description:

Sealed proposals will be received by the Village of Buffalo Grove, 50 Raupp Blvd, Buffalo Grove, Illinois, via electronic submittal only online at www.vbg.org/bids. Hard copies of the proposal will not be accepted. The proposals will be publicly opened at 9:00 AM local time on Thursday, November 18, 2021 via a virtual bid opening. Each bidder must submit the required forms and follow the provisions. The electronic submission shall be in pdf format and a single file that encompasses all the requirements. The file shall be marked or endorsed:

This project includes, but is not limited to, the following major work items: lift station demolition and construction; force main construction; sanitary sewer replacement; water main replacement; detention pond and volume control construction; access road construction; pavement and landscape restoration; and other appurtenant work for a total distance of 2,165 feet (0.41 miles).

All work under this contract shall comply with the Prevailing Wage Act of the State of Illinois, 820 ILCS 130/0.01 et seq. & the Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01 et. seq).


Pre-Bid Meeting Date: 11/10/2021 1:00 PM

Pre-Bid Meeting Details: This meeting will be held at the PW Service Center. 51 Raupp Blvd. Buffalo Grove, IL 60089. Lower Level Meeting Room Covid-19 Protocol: Face Masks Required Inside The Building.


Line
Item
Item # Description Purchase
Quantity
Unit Of
Measurement
Units
Per UOM
Total Units Allow Alt Item Purchase Quantity? Allow
Alt. item?
Allow
Alt. UOM?
Attachments
1 Cost Base Bid-Total 1 Each 1
1
2 Cost Alternate A-Total 1 Each 1
1
3 Cost Alternate B-Total 1 Each 1
1

Documents:

Documents as of 10/29/2021
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
11/1/2021 9:27:34 AM Performance Construction & Engineering, LLC
11/1/2021 9:58:49 AM envirobidnet
11/1/2021 12:53:47 PM Manusos General Contracting, Inc.
11/1/2021 1:08:55 PM chicagoland
11/1/2021 5:19:50 PM Stuckey Construction Company
11/2/2021 4:11:54 AM IMS
11/2/2021 2:46:35 PM John Burns Construction
11/3/2021 7:30:04 AM IHC Construction Companies LLC
11/4/2021 10:01:12 AM Concept Plumbing Inc
11/4/2021 11:01:55 AM JWC Infrastructure
11/4/2021 2:34:00 PM North America Procurement Council Inc., PBC
11/4/2021 3:05:30 PM Campanella & Sons, Inc.
11/5/2021 10:46:11 AM Schroeder Asphalt Services, Inc.
11/8/2021 11:49:22 AM H. Linden & Sons Sewer and Water
11/12/2021 10:26:43 AM Martam Construction
11/12/2021 11:19:44 AM J CONGDON SEWER SERVICE, INC
11/13/2021 6:26:40 AM Dodge Data
11/16/2021 7:44:09 AM RFx Analyst, Inc.
11/16/2021 10:02:34 AM DiMeo Bros Inc
11/18/2021 8:31:56 AM TRINE CONSTRUCTION CORP
11/18/2021 10:01:28 AM Bolder Contractors, Inc
11/18/2021 10:04:58 AM Copenhaver Construction, Inc.
11/18/2021 10:05:22 AM A Lamp Concrete Contractors, Inc.
11/18/2021 10:40:40 AM DeVinci Construction Inc.
11/18/2021 10:41:11 AM Misfits Construction Company
11/18/2021 10:41:22 AM Berger Excavating
11/18/2021 10:53:34 AM Rausch Infrastructure, LLC
11/18/2021 11:12:28 AM Martam Construction, Inc.
11/18/2021 11:33:21 AM Reliable Contracting & Equipment Company
11/18/2021 12:34:13 PM Swallow Construction
11/18/2021 1:25:47 PM DataBid
11/18/2021 1:44:03 PM Gerardi Sewer & Water Co.
11/18/2021 3:29:05 PM City Lights, Ltd.
11/18/2021 6:03:11 PM LMCC
11/19/2021 8:42:47 AM Beverly Materials
11/19/2021 9:33:51 AM ConstructConnect
11/19/2021 10:05:44 AM Indiana, Illinois, Iowa Foundation for Fair Contracting
11/19/2021 11:36:48 AM MixOnSite USA Inc.
11/21/2021 12:57:24 AM Dodge Data & Analytics
11/22/2021 12:24:05 AM North America Procurement Council, Inc. PBC
11/22/2021 3:35:04 PM Lifco construction
11/23/2021 2:35:42 PM Builders Paving, LLC
11/29/2021 9:17:15 AM Peter Baker & Son Co
11/29/2021 9:54:32 PM chicagolandconstruction.com
12/2/2021 12:38:16 PM Landscapes by Gary Weiss
12/7/2021 10:03:16 AM Joel Kennedy Constructing Corp.
12/10/2021 11:32:47 AM Construction Journal
2/23/2024 12:32:08 AM PWXPress
Addition 1

Posted: 11/12/2021

Type of Addition: Addendum 1

Solicitation #: VoBG-2021-03

Documents:

Addition 2

Posted: 11/18/2021

Type of Addition: In Review

Addition 3

Posted: 11/18/2021

Type of Addition: As Read Bids

Overview: *These numbers are only as read and do not represent a full bid tab. A full bid tab, which will be used for determining award of the project, will be posted in 2-3 business days.

Documents:

Addition 4

Posted: 11/23/2021

Type of Addition: Final Bid Tabulation

Overview:

Documents:

Addition 5

Posted: 1/18/2022

Type of Addition: Award Information

Posted: 11/12/2021

Type of Addition: Addendum 1

Solicitation #: VoBG-2021-03

Documents:

Posted: 11/18/2021

Type of Addition: In Review

Posted: 11/18/2021

Type of Addition: As Read Bids

Overview: *These numbers are only as read and do not represent a full bid tab. A full bid tab, which will be used for determining award of the project, will be posted in 2-3 business days.

Documents:

Posted: 11/23/2021

Type of Addition: Final Bid Tabulation

Overview:

Documents:

Posted: 1/18/2022

Type of Addition: Award Information