St. Johns River Water Management District Sealed Solicitation

Title: Moss Bluff Drum and Cable Lift System Fabrication and Installation

Deadline: 9/16/2021 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: In Review

Solicitation Number: 37109

Description:

Contractor shall provide all materials, labor, and equipment necessary for the replacement of the two (2) hydraulic hoist systems as described in this statement of work and as shown in the Contract Drawing and Specifications. Generally, the scope shall include fabrication of a new drum and cable hoist system, removal of existing hydraulic lift system, installation of new drum and cable system including all electrical and mechanical components to complete a fully operational lift system.

 


Documents:

Documents as of 8/18/2021
IFB_37109_Moss Bluff Drum and Cable Lift System Fabrication and Installation.pdf
Spec 09900 Protective Coatings.pdf
Spec Moss Bluff Cable Drum Hoist.pdf
Drawing Moss Bluff (S-251) Drum and Cable.pdf
Drawings Moss Bluff Dam Rehabilitation - Record Drawings - SJRWMD - 2017-11-30.pdf
Drawings Moss Bluff Lock And Spillway - AS-BUILT Sheets 121-126 - USACE 1972-08-09.pdf
Addition 1

Posted: 9/20/2021

Type of Addition: In Review

Overview: Notice of Intended Decision

Documents:

Posted: 9/20/2021

Type of Addition: In Review

Overview: Notice of Intended Decision

Documents: