Arlington County Government Sealed Solicitation

Title: 21-DPR-ITB-646 Marcey Road Park Improvements

Deadline: 8/12/2021 1:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 21-DPR-ITB-646

Description: Arlington County is seeking a qualified Contractor for renovation of the tennis courts, basketball court, sports lighting, picnic shelter, parking lot, site circulation, site furnishings, storm water management and landscaping located at Marcey Road Park.


Pre-Bid Meeting Date: 7/19/2021 9:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.


Documents:

Documents as of 8/2/2021
21-DPR-ITB-646 Bid Form Submital.pdf
21-DPR-ITB-646 Marcey Road Park Improvements - Final.pdf
Attachment C Geotechnical Engineering Report-Marcey Road Park 5.22.2020.pdf
Revised Attachment A - Project Manual.pdf
Revised Attachment B - Construction Drawings.pdf
Addition 1

Posted: 7/19/2021

Type of Addition: Addendum No. 1

Overview: Addendum No. 1 replaces the Project Manual and revises the Landscape Maintenance Bond. Sign-in sheets for Site Visits and Prebid Conference attached.

Documents:

Addition 2

Posted: 8/2/2021

Type of Addition: Addendum No.2

Overview: Addendum No. 2 revises Attachment B - Construction Drawing, extends Bid due date and answers additional vendor questions

Deadline: 8/12/2021 1:00 PM

Documents:

Addition 3

Posted: 8/9/2021

Type of Addition: Question Clarification

Overview:

Question: Are the Musco light being provided by Arlington.
Answer:  Please reference the Bid Form, Base Bid section, DPR General Terms and conditions, Section B.1.a. INTENT OF THE DRAWINGS AND SPECIFICATIONS and SECTION 265668, PART 1 – GENERAL, 1.1-B.

Addition 4

Posted: 8/12/2021

Type of Addition: In Review

Overview: Bid Tabulation

Documents:

Addition 5

Posted: 9/22/2021

Type of Addition: Award Information

Overview: Notice of Award - Avon Corporation

Documents:

Question 1

Posted: 7/13/2021

Question: The project Manual List Segmental walls in the table of contents, but the actual Specs were not provided. Please clarify

Response: Please reference Addendum No. 1

Question 2

Posted: 7/13/2021

Question: What is the Estimated budget for this project?

Response: The County does not disclose budget information

Question 3

Posted: 7/13/2021

Question: 034500 pre cast manufacturers listed are from California , Chicago-there not interested in providing the products this far for the project, Will we able to provide alternate manufacturers.

Response: Please reference Addendum No. 1

Question 4

Posted: 7/13/2021

Question: The add alternate 1 for the Benches , on sheet L-02 detail 3 - list 4 different manufacturers for the alternate add, in leu of the worlds fair bench, Are they suppose to make up the same length has the worlds fair bench, if so how would this be done, all the benches are different. Who makes the worlds fair bench, i cannot find a manufacturer. Please clarify

Response: Please reference Addendum No. 1

Question 5

Posted: 7/13/2021

Question: The links to Attachments A, B, and C are not working. The other two links worked fine. Is there another way to obtain the bid documents?

Response: The pdf. attachments have been tested again and are downloading fine. If you are still having trouble, please reach out to Vendor Registry's Customer Service. Thank you.

Question 6

Posted: 7/14/2021

Question: A full time arborist is required, please provide the approved Arborist for Arlington County

Response: Please reference Addendum No. 1

Question 7

Posted: 7/19/2021

Question: We were not able to attend the first site visit, can another site visit be scheduled for Friday Afternoon, July 23rd or Monday Morning July 26th?

Response: Please reference Addendum No. 1

Question 8

Posted: 7/26/2021

Question: Plan sheet C-04 Note 25: "Contractor shall coordinate with respective utility companies for shut-off etc.," It has been our recent experience that VA Dominion will not take a shut-off request or any work order requests from us as a contractor and it must come from the actual utility account owner. Can you please amend this note to read that the County will perform the work order requests to utilities?

Response: Please see Addendum No. 2

Question 9

Posted: 7/26/2021

Question: Plan sheet LF-02 Phase 2 Note #2- RE: "there shall be no cut or excavation..." In the areas referenced in that note there is also a 4"PVC pipe that is to be installed that goes to a trench drain. Please clarify how the pipe is to be installed There with no cut or excavation.

Response: Please see Addendum No. 2

Question 10

Posted: 7/26/2021

Question: Plan Sheet LF-02 Re: Comment at top right of sheet reads: ...."prior to demolition of basketball court, install reforestation planting..." What is the timeline (approximate date) for this reforestation planting?

Response: Please see Addendum No. 2

Question 11

Posted: 7/26/2021

Question: My email and phone contact info was not included in the sign-up sheet on Addendum #1. Would it be possible for you to put it in Add #2 please? DeBorn Construction Inc., Deborah Munoz, deborah@debornconstruction.com 703-298-7642

Response: Please see Addendum No. 2

Question 12

Posted: 7/26/2021

Question: Please confirm the contractor is only responsible for installation of new lamps provided by others.

Response: Please see Addendum No. 2

Question 13

Posted: 7/26/2021

Question: Please clarify how many boulders are to be relocated

Response: Please see Addendum No. 2

Question 14

Posted: 7/26/2021

Question: L-06 shows a plan of the new basketball court with specified colors for the court surfacing and stripping. However, no plan is shown for the new tennis courts. Please provide a stripping plan of the tennis courts.

Response: Please see Addendum No. 2

Question 15

Posted: 7/26/2021

Question: Please provide an E&S control plan to build the bioretention area out of the standard sequence as it will need to be constructed prior to the construction of the tennis court or all construction access will be cut off.

Response: Please see Addendum No. 2

Question 16

Posted: 7/26/2021

Question: Per detail 6/L07 it appears that the fence footer will be in conflict with the footer for the existing retaining wall. Please advise.

Response: Please see Addendum No. 2

Question 17

Posted: 7/26/2021

Question: For the bench alternate, would it be acceptable to work with a local supplier for a more cost effective solution?

Response: Please see Addendum No. 2

Question 18

Posted: 7/26/2021

Question: Tree Protection Spec 311300-6, 3.01 (I.) refers to a "third party arborist." Other references in the manual are made to the Contractor's Certified Arborist> Is the Contractor's arborist and the third-party arborist one in the same, or are they 2 different individuals? Please clarify.

Response: Please see Addendum No. 2

Question 19

Posted: 7/26/2021

Question: Is a SWPPP required to be maintained by the Contractor as Responsible Land Disturber for this project? If so has the Owner developed the SWPPP and have it already approved? If so can you add the SWPPP document as an Addendum please.

Response: Please see Addendum No. 2

Posted: 7/19/2021

Type of Addition: Addendum No. 1

Overview: Addendum No. 1 replaces the Project Manual and revises the Landscape Maintenance Bond. Sign-in sheets for Site Visits and Prebid Conference attached.

Documents:

Posted: 8/2/2021

Type of Addition: Addendum No.2

Overview: Addendum No. 2 revises Attachment B - Construction Drawing, extends Bid due date and answers additional vendor questions

Deadline: 8/12/2021 1:00 PM

Documents:

Posted: 8/9/2021

Type of Addition: Question Clarification

Overview:

Question: Are the Musco light being provided by Arlington.
Answer:  Please reference the Bid Form, Base Bid section, DPR General Terms and conditions, Section B.1.a. INTENT OF THE DRAWINGS AND SPECIFICATIONS and SECTION 265668, PART 1 – GENERAL, 1.1-B.

Posted: 8/12/2021

Type of Addition: In Review

Overview: Bid Tabulation

Documents:

Posted: 9/22/2021

Type of Addition: Award Information

Overview: Notice of Award - Avon Corporation

Documents:

Posted: 7/13/2021

Question: The project Manual List Segmental walls in the table of contents, but the actual Specs were not provided. Please clarify

Response: Please reference Addendum No. 1

Posted: 7/13/2021

Question: What is the Estimated budget for this project?

Response: The County does not disclose budget information

Posted: 7/13/2021

Question: 034500 pre cast manufacturers listed are from California , Chicago-there not interested in providing the products this far for the project, Will we able to provide alternate manufacturers.

Response: Please reference Addendum No. 1

Posted: 7/13/2021

Question: The add alternate 1 for the Benches , on sheet L-02 detail 3 - list 4 different manufacturers for the alternate add, in leu of the worlds fair bench, Are they suppose to make up the same length has the worlds fair bench, if so how would this be done, all the benches are different. Who makes the worlds fair bench, i cannot find a manufacturer. Please clarify

Response: Please reference Addendum No. 1

Posted: 7/13/2021

Question: The links to Attachments A, B, and C are not working. The other two links worked fine. Is there another way to obtain the bid documents?

Response: The pdf. attachments have been tested again and are downloading fine. If you are still having trouble, please reach out to Vendor Registry's Customer Service. Thank you.

Posted: 7/14/2021

Question: A full time arborist is required, please provide the approved Arborist for Arlington County

Response: Please reference Addendum No. 1

Posted: 7/19/2021

Question: We were not able to attend the first site visit, can another site visit be scheduled for Friday Afternoon, July 23rd or Monday Morning July 26th?

Response: Please reference Addendum No. 1

Posted: 7/26/2021

Question: Plan sheet C-04 Note 25: "Contractor shall coordinate with respective utility companies for shut-off etc.," It has been our recent experience that VA Dominion will not take a shut-off request or any work order requests from us as a contractor and it must come from the actual utility account owner. Can you please amend this note to read that the County will perform the work order requests to utilities?

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Plan sheet LF-02 Phase 2 Note #2- RE: "there shall be no cut or excavation..." In the areas referenced in that note there is also a 4"PVC pipe that is to be installed that goes to a trench drain. Please clarify how the pipe is to be installed There with no cut or excavation.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Plan Sheet LF-02 Re: Comment at top right of sheet reads: ...."prior to demolition of basketball court, install reforestation planting..." What is the timeline (approximate date) for this reforestation planting?

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: My email and phone contact info was not included in the sign-up sheet on Addendum #1. Would it be possible for you to put it in Add #2 please? DeBorn Construction Inc., Deborah Munoz, deborah@debornconstruction.com 703-298-7642

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Please confirm the contractor is only responsible for installation of new lamps provided by others.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Please clarify how many boulders are to be relocated

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: L-06 shows a plan of the new basketball court with specified colors for the court surfacing and stripping. However, no plan is shown for the new tennis courts. Please provide a stripping plan of the tennis courts.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Please provide an E&S control plan to build the bioretention area out of the standard sequence as it will need to be constructed prior to the construction of the tennis court or all construction access will be cut off.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Per detail 6/L07 it appears that the fence footer will be in conflict with the footer for the existing retaining wall. Please advise.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: For the bench alternate, would it be acceptable to work with a local supplier for a more cost effective solution?

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Tree Protection Spec 311300-6, 3.01 (I.) refers to a "third party arborist." Other references in the manual are made to the Contractor's Certified Arborist> Is the Contractor's arborist and the third-party arborist one in the same, or are they 2 different individuals? Please clarify.

Response: Please see Addendum No. 2

Posted: 7/26/2021

Question: Is a SWPPP required to be maintained by the Contractor as Responsible Land Disturber for this project? If so has the Owner developed the SWPPP and have it already approved? If so can you add the SWPPP document as an Addendum please.

Response: Please see Addendum No. 2