City of Daytona Beach Solicitation

Solicitation Request: SUNNYLAND PARK IMPROVEMENTS

Deadline: 6/3/2019 2:00 PM (Eastern Standard Time)

Status: Awarded

Solicitation Number: 19433

Description:

The work generally consists of Construct  two 22’ x 22’ steel pavilions with sidewalk connections as shown on the construction documents.  Remodel existing park building to accommodate two ADA accessible single occupant restrooms as shown on the construction documents. Project Magnitude is $180,000 - $200,000.


Pre-Solicitation Meeting Date: 5/7/2019 9:00 AM (Eastern Standard Time)

Pre-Solicitation Meeting Details: A NON-MANDATORY PRE-PROPOSAL CONFERENCE will be held at the Daytona Beach Public Works, 950 Bellevue Avenue, #500, Daytona Beach, Florida 32114, on May 7, 2019 at 9:00 AM. Interested contractors are urged to attend.


Documents:

Addition 1

Posted: 5/10/2019

Type of Addition: Addendum 1

Overview: remove local preference requirement, revised plans (3 sheets).

Documents:

Addition 2

Posted: 5/16/2019

Type of Addition: Addendum 2

Overview: plan changes and due date change.

Deadline: 5/23/2019 2:00:00 PM (Eastern Standard Time)

Documents:

Addition 3

Posted: 5/21/2019

Type of Addition: Addendum 3

Overview: Questions & Answers; revised A6.4.

Deadline: 5/28/2019 2:00:00 PM (Eastern Standard Time)

Solicitation #: 19433

Documents:

Addition 4

Posted: 5/24/2019

Type of Addition: Addendum 4

Overview: Revised drawing and due date change

Deadline: 6/3/2019 2:00:00 PM (Eastern Standard Time)

Solicitation #: 19433

Documents:

Addition 5

Posted: 6/3/2019

Type of Addition: In Review

Addition 6

Posted: 6/6/2019

Type of Addition: BAFO Addendum 5

Overview: Best and Final Offer was requested by lowest bidder and lowest local bidder because they were within 10% of each other.

Documents:

Addition 7

Posted: 6/6/2019

Type of Addition: BAFO Rescinded

Overview: Best and Final Offer has been rescinded because Addendum 1, item 1 removed the local preference requirement.

Addition 8

Posted: 8/8/2019

Type of Addition: Award Information

Amount: $204,564.00

Documents:

Posted: 5/10/2019

Type of Addition: Addendum 1

Overview: remove local preference requirement, revised plans (3 sheets).

Documents:

Posted: 5/16/2019

Type of Addition: Addendum 2

Overview: plan changes and due date change.

Deadline: 5/23/2019 2:00:00 PM (Eastern Standard Time)

Documents:

Posted: 5/21/2019

Type of Addition: Addendum 3

Overview: Questions & Answers; revised A6.4.

Deadline: 5/28/2019 2:00:00 PM (Eastern Standard Time)

Solicitation #: 19433

Documents:

Posted: 5/24/2019

Type of Addition: Addendum 4

Overview: Revised drawing and due date change

Deadline: 6/3/2019 2:00:00 PM (Eastern Standard Time)

Solicitation #: 19433

Documents:

Posted: 6/3/2019

Type of Addition: In Review

Posted: 6/6/2019

Type of Addition: BAFO Addendum 5

Overview: Best and Final Offer was requested by lowest bidder and lowest local bidder because they were within 10% of each other.

Documents:

Posted: 6/6/2019

Type of Addition: BAFO Rescinded

Overview: Best and Final Offer has been rescinded because Addendum 1, item 1 removed the local preference requirement.

Posted: 8/8/2019

Type of Addition: Award Information

Amount: $204,564.00

Documents: