Title: FINAL SOLICITATION: Champ Tyrone Music Building Electrical

Deadline: 1/29/2021 3:00 PM   (UTC-07:00) Mountain Time (US & Canada)

Status: Deadline Expired

Quote Number: 21002

Description: Upgrade of Electrical System for Champ Tyrone Building, NMHU Main Campus


Line
Item
Item # Description Purchase
Quantity
Unit Of
Measurement
Units
Per UOM
Total Units Allow Alt Item Purchase Quantity? Allow
Alt. item?
Allow
Alt. UOM?
Attachments
1 0001 Furnish and Install all Labor and Materials for Champ Tyrone Building Electrical Upgrade IAW Statement of Work 1 LTL 1
1

Documents:

Documents as of 12/20/2020
Model Contract, Champ Tyrone 121120DRAFT.pdf
RFP 21002 Champ Tyrone Electrical 121820FINAL-RFP.pdf
Addition 1

Posted: 12/18/2020

Type of Addition: Addendum 0001, FINAL RFP

Overview:

Dates have not changed.  Site Visit remains on 4 January 2021, 10:00 AM
Statement of Objectives/Scope of Work provided in RFP.
Evaluation Factors finalized; page limitations stated.

Documents:

Addition 2

Posted: 12/19/2020

Type of Addition: Information

Overview:

Champ Tyrone Building size = 13,959 sf

Schedule – 1/25/2021 – 3/30/2021

Addition 3

Posted: 1/19/2021

Type of Addition: Addendum 0002 - Extension of RFP Period to 29 January 2021

Overview:

RFP Period for Champ Tyrone Music Electrical Upgrade is extended to 29 January 2021, 3:00 PM Las Vegas, NM Hours.
This is because drawings required to cover all the work are not available as of today.
When available, the drawings will be made available via this website.

Deadline: 1/29/2021 3:00 PM

Documents:

Addition 4

Posted: 1/20/2021

Type of Addition: Information - Attendees to Preproposal Conference

Overview: Attendees to Preproposal Conference Posted

Documents:

Addition 5

Posted: 1/21/2021

Type of Addition: Amendment 0003, Revised Drawings

Overview: Revised Drawings are Provided for the added work in scope.

Deadline: 1/29/2021 3:00 PM

Documents:

Question 1

Posted: 12/18/2020

Question: Please verify that the contractor is not required to submit a hard copy of proposal or quote if they submit digitally through the vendor registry site?

Response: Contractor is not required to submit a hard copy of proposal or quote if submitted digitally through the Vendor Registry site.

Question 2

Posted: 12/31/2020

Question: What is the address for the site visit

Response: Address is 1152 11th Street, Las Vegas, NM. See Cover page solicitation, "Services" block description.

Question 3

Posted: 1/5/2021

Question: Will the required proposal documents be provided or given access to?

Response: The proposal documents may be accessed by clicking the Link: FINAL SOLICITATION: Champ Tyrone Music Building Electrical , then scroll down to "Documents" and select RFP 21002 Champ Tyrone Electrical 121820FINAL-RFP.pdf document for the proposal document to download.

Question 4

Posted: 1/6/2021

Question: Will this project require an actual proposal as stated in the final RFP, or will a lump sum estimate based on the drawings and scope of work be acceptable?

Response: This RFP does required for a Technical Proposal, Cost Proposal, with detail, and, Past Performance be submitted. A lump sum estimate will be considered nonresponsive.

Question 5

Posted: 1/6/2021

Question: Is it possible to get an electronic copy of the drawings for this project? This would be helpful for distribution to suppliers and for digital takeoff.

Response: NMHU anticipates having an electronic copy of the drawings shortly. They will be distributed electronically via amendment through VendorRegistry.

Posted: 12/18/2020

Type of Addition: Addendum 0001, FINAL RFP

Overview:

Dates have not changed.  Site Visit remains on 4 January 2021, 10:00 AM
Statement of Objectives/Scope of Work provided in RFP.
Evaluation Factors finalized; page limitations stated.

Documents:

Posted: 12/19/2020

Type of Addition: Information

Overview:

Champ Tyrone Building size = 13,959 sf

Schedule – 1/25/2021 – 3/30/2021

Posted: 1/19/2021

Type of Addition: Addendum 0002 - Extension of RFP Period to 29 January 2021

Overview:

RFP Period for Champ Tyrone Music Electrical Upgrade is extended to 29 January 2021, 3:00 PM Las Vegas, NM Hours.
This is because drawings required to cover all the work are not available as of today.
When available, the drawings will be made available via this website.

Deadline: 1/29/2021 3:00 PM

Documents:

Posted: 1/20/2021

Type of Addition: Information - Attendees to Preproposal Conference

Overview: Attendees to Preproposal Conference Posted

Documents:

Posted: 1/21/2021

Type of Addition: Amendment 0003, Revised Drawings

Overview: Revised Drawings are Provided for the added work in scope.

Deadline: 1/29/2021 3:00 PM

Documents:

Posted: 12/18/2020

Question: Please verify that the contractor is not required to submit a hard copy of proposal or quote if they submit digitally through the vendor registry site?

Response: Contractor is not required to submit a hard copy of proposal or quote if submitted digitally through the Vendor Registry site.

Posted: 12/31/2020

Question: What is the address for the site visit

Response: Address is 1152 11th Street, Las Vegas, NM. See Cover page solicitation, "Services" block description.

Posted: 1/5/2021

Question: Will the required proposal documents be provided or given access to?

Response: The proposal documents may be accessed by clicking the Link: FINAL SOLICITATION: Champ Tyrone Music Building Electrical , then scroll down to "Documents" and select RFP 21002 Champ Tyrone Electrical 121820FINAL-RFP.pdf document for the proposal document to download.

Posted: 1/6/2021

Question: Will this project require an actual proposal as stated in the final RFP, or will a lump sum estimate based on the drawings and scope of work be acceptable?

Response: This RFP does required for a Technical Proposal, Cost Proposal, with detail, and, Past Performance be submitted. A lump sum estimate will be considered nonresponsive.

Posted: 1/6/2021

Question: Is it possible to get an electronic copy of the drawings for this project? This would be helpful for distribution to suppliers and for digital takeoff.

Response: NMHU anticipates having an electronic copy of the drawings shortly. They will be distributed electronically via amendment through VendorRegistry.