City of Callaway Sealed Solicitation
Title: Design of Lake Drive Sidewalks LAP Project
Deadline: 11/19/2025 10:00 AM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Solicitation Number: CM2025-10
Description: This project is for the design of Lake Drive from US 98/Tyndall Parkway to S. Berthe Ave.
sidewalk project. The scope includes the survey, design, and permitting for construction of a
6’ buffered concrete ADA compliant sidewalk on the North side of Lake Drive. The scope
will also include associated drainage improvements, detectable warning areas, driveways and
other pedestrian ramps, as needed. The new sidewalk shall add connectivity to the sidewalks
in Cherry St. and Boat Race Road, and S. Berthe Ave. All proposed improvements shall be
located with the existing right of way. The length of this project is .99 miles.
The project is federally funded with assistance from the FDOT and the Federal Highway
Administration (FHWA). By submitting a proposal, the Consultant certifies that they follow
FDOT Procedure No. 375-030-006 (Restriction on Consultants Eligibility to Compete for
Department Contracts) and that no principle is presently suspended, proposed for debarment,
declared ineligible or voluntarily excluded from participation on this transaction by any Federal
Department or Agency. It is imperative that Respondents examine and become familiar with
the Local Agency Program established by the Florida Department of Transportation (FDOT).
Funding for the project may be provided by this grant process and is contingent on strict
conformance to the guidelines set forth by FDOT and the Federal Highway Administration.
Respondents shall comply with the Local Agency/Federal Aid Contract Requirements.
Documents:
| Documents as of 10/24/2025 |
|---|
| RFQ_for_Design_2.0.pdf |