County of Darlington Sealed Solicitation
Title: Sheriff's Evidence Storage Building
Deadline: 3/21/2019 3:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Cancelled
Solicitation Number: 01-03-21-2019
Description:
The intent of this Request For Proposal is to
purchase and install one (1) Pre-engineered metal building for the Darlington County Sheriff’s Office. This building will be used to store evidence
only. The new Evidence Storage Building
will be located off Rogers Road in Darlington, South Carolina. Bids
must include the costs for the pre-engineered metal building, all labor,
equipment, materials, permits, and fees to furnish, deliver, construct and
install a fully functioning building, in a turn-key manner meeting the
specifications herein and all necessary codes and regulations for this standard
build.
Pre-Bid Meeting Date: 3/7/2019 11:00 AM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-solicitation meeting.Meeting details
Documents:
Documents as of 3/19/2019 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Addition 1
Posted: 3/8/2019
Type of Addition: Questions and Answers
Overview:
QUESTIONS
AND ANSWERS:
RFP
Sheriff’s Evidence Storage Building 01-03-21-2019
Darlington County staff has answered the questions
below to the best of our ability. Answers
are in Red
1.
Who
will be responsible for Utility Locates and Tie In’s? Bids must include the costs for the pre-engineered
metal building, all labor, equipment, materials, permits, and fees to furnish,
deliver, construct and install a fully functioning building, in a turn-key
manner meeting the specifications herein and all necessary codes and
regulations for this standard build.
2.
Have
the utilities be identified for the tie in’s? Water Sewer, Phone, and Electric Bids must include the costs for the pre-engineered metal
building, all labor, equipment, materials, permits, and fees to furnish,
deliver, construct and install a fully functioning building, in a turn-key
manner meeting the specifications herein and all necessary codes and
regulations for this standard build.
3.
Who
will be responsible for Engineering on the concrete slab and utility tie in
specification? Bids must include the costs for the
pre-engineered metal building, all labor, equipment, materials, permits, and
fees to furnish, deliver, construct and install a fully functioning building,
in a turn-key manner meeting the specifications herein and all necessary codes
and regulations for this standard build.
4.
Who
will be responsible for utility tie in cost? Bids must
include the costs for the pre-engineered metal building, all labor, equipment,
materials, permits, and fees to furnish, deliver, construct and install a fully
functioning building, in a turn-key manner meeting the specifications herein
and all necessary codes and regulations for this standard build.
- Are there any
requirements for high security storage?
No
- Will the interior of the pre-engineered steel building
need to be finished aside from the bathroom? No, finish
walls, but insulations will need to be finished.
- Where does the water lines come from? Plans for the
Detention building can be obtained from DHEC.
8.
Will
sprinkler be required? The
successful offeror will provide and install one (1) pre-engineered metal
building size 50 X 100 to be used as
an evidence storage building. The building must meet the following
specifications one standard unisex
bathroom, 2 standard doors, 2 electric roll-up doors size 10 x 12, Eyewash station, utility sink, HVAC (heating
and air), water sprinkler systems, water sprout on the front building, standard LED lighting, standard receptacles (8 along the
length and 4 along the width).
- Has a soil
analysis been done? No
- Who will be preforming the grade work? The awarded
bidder.
- Does the fence need to be included? No this will
be a separate solicitation.
- Is there county water on the Rogers Road side or road
behind sheriff’s office? That will need to be
confirmed with Darlington County Water and Sewer 843-393-8131.
- Who will do inspection and permit fees? Vendor are
responsible for all inspections and permits fees; however, the County does
not charge any fees for the County’s building which permitted through the
County and are located within the County jurisdiction.
- Will there be water tap and impact fees? That will
need to be confirmed with Darlington County Water and Sewer 843-393-8131.
- Does it have to be exactly 50x100 or can it be slightly
smaller to reduce cost of engineering? To compare the proposals correctly yes it
needs to be a 50 x 100.
- Time restrictions? Once the award is made, time to
completion is negotiated within a reasonable amount of time.
Please
acknowledge this addendum by signing below and submit with your bid documents.
I have read and acknowledge the
questions and answers for RFP 01-03-21-2019
__________________________ _____________________________________
Authorized Signature Printed Name Date
_________________________________________
Company
Name
Documents:
Posted: 3/8/2019
Type of Addition: Questions and Answers
Overview:
QUESTIONS
AND ANSWERS:
RFP
Sheriff’s Evidence Storage Building 01-03-21-2019
Darlington County staff has answered the questions
below to the best of our ability. Answers
are in Red
1.
Who
will be responsible for Utility Locates and Tie In’s? Bids must include the costs for the pre-engineered
metal building, all labor, equipment, materials, permits, and fees to furnish,
deliver, construct and install a fully functioning building, in a turn-key
manner meeting the specifications herein and all necessary codes and
regulations for this standard build.
2.
Have
the utilities be identified for the tie in’s? Water Sewer, Phone, and Electric Bids must include the costs for the pre-engineered metal
building, all labor, equipment, materials, permits, and fees to furnish,
deliver, construct and install a fully functioning building, in a turn-key
manner meeting the specifications herein and all necessary codes and
regulations for this standard build.
3.
Who
will be responsible for Engineering on the concrete slab and utility tie in
specification? Bids must include the costs for the
pre-engineered metal building, all labor, equipment, materials, permits, and
fees to furnish, deliver, construct and install a fully functioning building,
in a turn-key manner meeting the specifications herein and all necessary codes
and regulations for this standard build.
4.
Who
will be responsible for utility tie in cost? Bids must
include the costs for the pre-engineered metal building, all labor, equipment,
materials, permits, and fees to furnish, deliver, construct and install a fully
functioning building, in a turn-key manner meeting the specifications herein
and all necessary codes and regulations for this standard build.
- Are there any
requirements for high security storage?
No
- Will the interior of the pre-engineered steel building
need to be finished aside from the bathroom? No, finish
walls, but insulations will need to be finished.
- Where does the water lines come from? Plans for the
Detention building can be obtained from DHEC.
8.
Will
sprinkler be required? The
successful offeror will provide and install one (1) pre-engineered metal
building size 50 X 100 to be used as
an evidence storage building. The building must meet the following
specifications one standard unisex
bathroom, 2 standard doors, 2 electric roll-up doors size 10 x 12, Eyewash station, utility sink, HVAC (heating
and air), water sprinkler systems, water sprout on the front building, standard LED lighting, standard receptacles (8 along the
length and 4 along the width).
- Has a soil
analysis been done? No
- Who will be preforming the grade work? The awarded
bidder.
- Does the fence need to be included? No this will
be a separate solicitation.
- Is there county water on the Rogers Road side or road
behind sheriff’s office? That will need to be
confirmed with Darlington County Water and Sewer 843-393-8131.
- Who will do inspection and permit fees? Vendor are
responsible for all inspections and permits fees; however, the County does
not charge any fees for the County’s building which permitted through the
County and are located within the County jurisdiction.
- Will there be water tap and impact fees? That will
need to be confirmed with Darlington County Water and Sewer 843-393-8131.
- Does it have to be exactly 50x100 or can it be slightly
smaller to reduce cost of engineering? To compare the proposals correctly yes it
needs to be a 50 x 100.
- Time restrictions? Once the award is made, time to
completion is negotiated within a reasonable amount of time.
Please
acknowledge this addendum by signing below and submit with your bid documents.
I have read and acknowledge the
questions and answers for RFP 01-03-21-2019
__________________________ _____________________________________
Authorized Signature Printed Name Date
_________________________________________
Company
Name
Documents: