Central Florida Expressway Authority Sealed Solicitation
Title: CR 532 WIDENING FROM LAKE WILSON ROAD TO US 17/92 [PROJECT NO. 538-235A]
Deadline: 10/16/2025 1:30 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Deadline Expired
Solicitation Number: ITB-250801
Description: The work consists of providing all labor, materials, equipment, and incidentals necessary to widen and reconstruct CR 532 from Lake Wilson Road to US 17/92. Specifically, the project consists of widening and reconstruction of the existing two-lane roadway to a four-lane divided highway. Additional elements include milling and resurfacing, stormwater management & ponds, signing & pavement markings, lighting, traffic signals, Utility Work By Highway Contractor, and maintenance of traffic in Osceola County, Florida. Coordination with CSX R/R will be required at Crossing CSX MP A-817.63/DOT #622956D, All work is located in Osceola and Polk Counties.
Pre-Bid Meeting Date: 9/4/2025 10:30 AM
Pre-Bid Meeting Details: A pre-bid meeting will be held on September 04, 2025, beginning at 10:30am, in the CFX Headquarters Building located at 4974 ORL Tower Road, Orlando, Florida, 32807. Interested parties may attend either in person or virtually by utilizing the link or phone number and conference id located in the Bid Documents. The purpose of the meeting will be to discuss requirements of the project in an open forum. Although the pre-bid meeting is not mandatory, attendance is highly recommended.
Documents:
PLANHOLDERS:
| Date | Company Name |
|---|---|
| 8/18/2025 10:41:18 AM | Roadway Construction Products |
| 8/18/2025 10:42:29 AM | DRMP Inc. |
| 8/18/2025 10:48:37 AM | SAK Construction, LLC |
| 8/18/2025 10:48:57 AM | L&S DIversified |
| 8/18/2025 11:28:06 AM | SACYR CONSTRUCTION USA |
| 8/18/2025 11:50:44 AM | Cathcart Construction Company - Florida, LLC |
| 8/18/2025 11:55:28 AM | SICE INC |
| 8/18/2025 12:00:26 PM | ATLANTIC CIVIL CONSTRUCTORS CORP |
| 8/18/2025 1:08:23 PM | The Lane Construction Corporation |
| 8/18/2025 1:20:54 PM | World Electric Supply |
| 8/18/2025 3:08:07 PM | DB CIVIL CONSTRUCTION |
| 8/18/2025 3:33:18 PM | Ranger Construction |
| 8/18/2025 3:52:06 PM | Southern Development & Construction |
| 8/18/2025 8:08:33 PM | Avant Engineering Group |
| 8/18/2025 9:03:07 PM | A & P International, Inc. |
| 8/21/2025 2:56:21 PM | Intertek/PSI (Professional Service Industries,Inc.) |
| 8/26/2025 9:57:57 AM | CFX |
| 8/27/2025 9:26:41 AM | Osceola County |
| 8/28/2025 10:31:47 AM | Dixie Lime And Stone Company |
| 8/29/2025 12:08:17 PM | Southeastern Surveying and Mapping Corporation |
| 9/1/2025 10:51:19 AM | SICE Inc |
| 9/2/2025 10:39:38 AM | EXP |
| 9/4/2025 1:28:28 PM | BTS Engineering Consultants Corp |
| 9/4/2025 2:11:33 PM | Seminole Masonry |
| 9/8/2025 10:22:40 AM | ACIPCO |
| 9/11/2025 2:50:28 AM | School Wholesale Supplies LLC |
| 9/15/2025 7:46:11 AM | Masci General Contractor, Inc. |
| 9/15/2025 12:48:53 PM | Top Star Construction, LLC |
| 9/16/2025 12:45:46 PM | Intelligent Transportation Services, Inc. |
| 9/17/2025 9:07:33 AM | Custom Rock Formliner |
| 9/17/2025 2:09:23 PM | The Balmoral Group |
| 9/17/2025 2:37:05 PM | John B. Webb & Associates |
| 9/17/2025 5:29:07 PM | AUM Construction, Inc. |
| 9/17/2025 5:31:45 PM | AUM Construction, INC |
| 9/22/2025 12:09:17 PM | Transportation Control Systems |
| 9/22/2025 12:10:55 PM | Southeast Highway |
| 9/22/2025 12:11:14 PM | Ennov8 Design Group, LLC |
| 9/22/2025 1:30:09 PM | Arazoza Brothers Corp. |
| 9/22/2025 2:07:38 PM | HNTB |
| 9/22/2025 2:35:37 PM | The Reinforced Earth Company |
| 9/22/2025 2:38:16 PM | The Balmoral Group |
| 9/22/2025 2:56:32 PM | NicNevol Engineering Services |
| 9/23/2025 6:47:08 AM | MRM Construction LLC |
| 9/23/2025 8:58:05 AM | Daktronics, Inc. |
| 9/23/2025 9:04:32 AM | R. J. Watson, Inc. |
| 9/23/2025 10:00:53 AM | 3M Company |
| 9/23/2025 12:03:04 PM | Sun Trucking & Materials |
| 9/23/2025 2:32:34 PM | Central Florida Transport, LLC |
| 9/25/2025 8:56:56 AM | Ion Electric, LLC |
| 9/29/2025 12:32:49 PM | Turtle Infrastructure Partners, LLC |
| 9/29/2025 3:34:24 PM | Arrive Alive Traffic Control |
| 9/29/2025 3:39:35 PM | Echezabal & Associates, Inc. |
| 10/3/2025 10:02:59 AM | Veritas Steel LLC |
| 10/3/2025 5:07:32 PM | Southeastern Surveying & Mapping |
| 10/6/2025 9:27:51 AM | SICE INC |
| 10/7/2025 7:28:32 PM | Mapei USA |
| 10/7/2025 11:30:07 PM | Florasod |
| 10/8/2025 7:45:01 AM | Southern Striping Solutions, LLC. |
| 10/8/2025 12:31:23 PM | InfraTech Group |
| 10/8/2025 3:10:43 PM | Pre-Cast Specialties, LLC |
| 10/8/2025 3:51:53 PM | Watson Bowman Acme Corp |
| 10/10/2025 10:13:49 AM | Dewberry |
| 10/10/2025 10:27:02 AM | The Middlesex Corporation |
| 10/10/2025 10:41:57 AM | Adaptive Consulting Engineers, LLC |
| 10/10/2025 10:59:28 AM | Concrete Services, LLC |
| 10/10/2025 12:40:07 PM | Elite Industrial Painting, Inc. |
| 10/11/2025 3:09:04 PM | Qualis Concrete LLC |
| 10/11/2025 11:39:30 PM | AG Ltd |
| 10/13/2025 8:11:10 AM | Southern Manufacturing/ Earnest Products |
| 10/13/2025 8:18:47 AM | Florida Roadway Guardrail & Signs |
| 10/13/2025 9:05:04 AM | Brevard Concrete Paving, Inc. |
| 10/13/2025 9:15:32 AM | Gulf Coast Contracting, LLC |
| 10/13/2025 10:07:31 AM | SiteScope Inc. |
| 10/13/2025 12:58:52 PM | Cone & Graham |
| 10/13/2025 1:32:46 PM | TRP Construction group |
| 10/13/2025 6:13:39 PM | Deltek |
| 10/14/2025 9:32:54 AM | Central Florida Underground |
| 10/14/2025 2:41:42 PM | Construction Art |
| 10/14/2025 2:52:43 PM | Moffatt & Nichol |
| 10/14/2025 4:23:31 PM | Sacyr Construction USA |
| 10/14/2025 8:24:00 PM | Synergy Utility Group, Inc. |
| 10/15/2025 9:51:52 AM | Right Traffic |
| 10/15/2025 2:18:18 PM | RFE Construction & Fence Services, Inc |
| 10/15/2025 5:59:26 PM | AECOM |
| 10/15/2025 6:32:41 PM | Big League Construction Supply |
| 10/15/2025 7:11:16 PM | MZB Engineering Inc |
| 10/16/2025 12:58:31 PM | Precision Powercutts |
| 10/16/2025 1:01:53 PM | Preferred Materials, Inc. |
| 10/16/2025 1:24:51 PM | Cone & Graham, Inc. |
| 10/16/2025 2:39:28 PM | Traffic Engineering and Management, LLC |
| 10/16/2025 2:51:51 PM | M.P.G. & Company Inc. |
| 10/17/2025 9:54:46 AM | SEMA Construction |
| 10/17/2025 10:01:06 AM | Transportation Systems Inc. |
| 10/17/2025 10:52:31 AM | Ram Tool And Supply |
| 10/17/2025 10:52:44 AM | The Lane Construction Corporation |
| 10/17/2025 10:52:53 AM | Safety Step TD, Inc |
| 10/17/2025 10:53:13 AM | The Lane Construction Corporation |
| 10/17/2025 10:54:20 AM | C. Slagter Construction, Inc. |
| 10/17/2025 10:54:20 AM | Kiewit Infrastructure South Co. |
| 10/17/2025 10:54:56 AM | Greenfield Diversified, LLC |
| 10/17/2025 10:55:04 AM | Gibbs & Register, Inc. |
| 10/17/2025 10:55:29 AM | Comprehensive Engineering Services, Inc. |
| 10/17/2025 10:55:44 AM | Mastec-Civil LLC. |
| 10/17/2025 10:56:06 AM | AC Signs LLC |
| 10/17/2025 10:57:15 AM | Florida Industrial Electric |
| 10/17/2025 10:58:03 AM | VMAX USA, LLC |
| 10/17/2025 10:58:50 AM | PI Consulting Services LLC |
| 10/17/2025 11:02:54 AM | AtkinsRealis |
| 10/17/2025 11:03:41 AM | de Moya Highway Infrastructure LLC |
| 10/17/2025 11:06:14 AM | Nadic Engineering Services |
| 10/17/2025 11:09:11 AM | Gascot Construction, LLC |
| 10/17/2025 11:13:06 AM | Bentley Group, Inc. |
| 10/17/2025 11:15:16 AM | Penhall Company |
| 10/17/2025 11:23:56 AM | Tierra, Inc. |
| 10/17/2025 11:25:03 AM | Webber LLC |
| 10/17/2025 11:26:11 AM | Hubbard Asphalt Estimating |
| 10/17/2025 11:37:51 AM | Danton Hydroblasting |
| 10/17/2025 11:41:55 AM | CEMEX |
| 10/17/2025 11:45:02 AM | Middlesex Paving, LLC. |
| 10/17/2025 11:51:46 AM | paramount industries inc |
| 10/17/2025 12:11:23 PM | Bentley Group, Inc. |
| 10/17/2025 12:19:45 PM | American Civil Construction Inc |
| 10/17/2025 12:31:16 PM | TBD |
| 10/17/2025 1:01:08 PM | Balfour Beatty |
| 10/17/2025 1:07:03 PM | J. Mori Painting, Inc. |
| 10/17/2025 1:20:37 PM | Ranger Construction Industries, Inc. |
| 10/17/2025 3:52:29 PM | Tucker Paving |
| 10/17/2025 4:01:30 PM | MM GRAHAM ENTERPRISES, LLC |
| 10/17/2025 4:12:57 PM | ADS |
| 10/19/2025 4:45:03 PM | DRMP |
| 10/20/2025 7:21:55 AM | Hubbard Construction Company |
| 10/20/2025 9:22:39 AM | American Cast Iron Pipe Comany |
| 10/20/2025 9:27:37 AM | Team Industrial |
| 10/20/2025 10:42:29 AM | Bob's Barricades, Inc. |
| 10/20/2025 1:09:19 PM | Mill-It Corporation |
| 10/21/2025 10:38:46 AM | United Signs and Signals |
| 10/21/2025 11:46:00 AM | Dewberry |
| 10/21/2025 12:31:18 PM | Rocal, Inc |
| 10/21/2025 4:08:20 PM | PSI |
| 10/22/2025 6:58:34 AM | Vecellio & Grogan, Inc. |
| 10/22/2025 9:27:44 AM | Southland Construction, Inc. |
| 10/22/2025 2:51:46 PM | CTI-Construction Testing & Inspection |
| 10/23/2025 11:37:43 AM | All South Underground |
| 10/23/2025 5:34:46 PM | North America Procurement Council Inc., PBC |
| 10/24/2025 10:10:00 AM | Quest |
| 10/24/2025 1:19:40 PM | Adaptive CE |
| 10/27/2025 3:38:29 PM | Berkshire Hathaway Specialty Insurance |
| 10/29/2025 11:10:10 AM | Traffic Control Products of Fl, Inc |
| 10/30/2025 10:42:57 AM | Universal Engineering Sciences |
| 11/5/2025 10:43:07 AM | Oglesby Construction Inc. |
| 11/10/2025 8:45:59 AM | Atlantic Pipe Services, LLC |
| 11/14/2025 3:08:16 PM | HNTB Corporation |
| 11/14/2025 4:24:59 PM | Southeastern Surveying and Mapping |
| 11/15/2025 8:49:14 AM | Skanska USA |
| 11/15/2025 3:30:36 PM | Hothaggis |
| 11/19/2025 4:08:56 PM | Superior Asphalt Inc |
| 11/21/2025 9:24:49 AM | Dewberry |
| 11/25/2025 12:21:42 AM | Dodge Data |
| 11/25/2025 10:55:31 AM | Prince Contracting, LLC |
| 11/25/2025 10:55:38 AM | Leware Construction Company |
| 11/25/2025 10:55:51 AM | Southland Construction, Inc. |
| 11/25/2025 10:55:51 AM | VALENCIA CONSTRUCTION GROUP, INC. |
| 11/25/2025 10:55:58 AM | Cone & Graham, Inc. |
| 11/25/2025 10:56:09 AM | Carter Electric |
| 11/25/2025 10:56:24 AM | Southland Construction, Inc. |
| 11/25/2025 10:56:29 AM | WSP USA inc. |
| 11/25/2025 10:56:45 AM | Webber LLC |
| 11/25/2025 10:56:47 AM | Core & Main |
| 11/25/2025 10:57:59 AM | Archer Western |
| 11/25/2025 10:58:40 AM | Junior Davis Construction Company, Inc. |
| 11/25/2025 10:58:42 AM | Carter Electric, Inc. |
| 11/25/2025 10:59:00 AM | RK&K |
| 11/25/2025 10:59:42 AM | SEMA Construction, Inc. |
| 11/25/2025 10:59:48 AM | Dane Construction and Company, Inc. |
| 11/25/2025 10:59:49 AM | FOLEY PRODUCTS |
| 11/25/2025 11:00:45 AM | Interstate Signways |
| 11/25/2025 11:01:04 AM | Jr. Davis Construction Company |
| 11/25/2025 11:01:34 AM | Ajax Paving Industries of Florida, LLC |
| 11/25/2025 11:02:44 AM | Kimley-Horn and Associates, Inc. |
| 11/25/2025 11:02:44 AM | Traffic and Parking Control Co., LLC |
| 11/25/2025 11:02:46 AM | Jr. Davis Construction Co., Inc. |
| 11/25/2025 11:02:59 AM | JEA Construction Engineering Services |
| 11/25/2025 11:06:46 AM | TranSystems Corporation |
| 11/25/2025 11:07:01 AM | Mack Industries |
| 11/25/2025 11:08:58 AM | Integrated Synergy Inc. |
| 11/25/2025 11:13:53 AM | Cloverleaf Corporation |
| 11/25/2025 11:17:21 AM | Concrete Impressions of Florida, Inc. |
| 11/25/2025 11:18:28 AM | S&L Materials |
| 11/25/2025 11:26:59 AM | The Arnold Group of Florida, Inc. |
| 11/25/2025 11:31:14 AM | Precision Contracting Services, Inc. |
| 11/25/2025 11:41:29 AM | CW ROBERTS CONTRACTING |
| 11/25/2025 12:08:24 PM | Ledstar, Inc. |
| 11/25/2025 12:13:04 PM | ConstructConnect |
| 11/25/2025 12:19:25 PM | GAI Consultants, Inc. |
| 11/25/2025 12:26:20 PM | Kiewit Infrastructure South Co. |
| 11/25/2025 12:40:41 PM | Watson Civil Construction, Inc. |
| 11/25/2025 1:12:58 PM | RWH Construction Services |
| 11/25/2025 1:19:09 PM | Granite Construction |
| 11/25/2025 1:27:55 PM | DRMP Inc. |
| 11/25/2025 1:49:33 PM | Johnson Bros. Corporation |
| 11/25/2025 2:24:01 PM | Chinchor Electric, Inc. |
| 11/25/2025 2:26:59 PM | Ferguson Water Works |
| 11/25/2025 2:28:00 PM | RAINBOW DISTRIBUTORS USA |
| 11/25/2025 2:29:46 PM | TEG Engineering |
| 11/26/2025 9:37:05 AM | Hayes Pipe |
| 11/26/2025 12:48:14 PM | Safety Systems Barricades, Corp. |
| 11/26/2025 5:28:36 PM | Florida Aerial Services, Inc. |
| 11/29/2025 10:35:02 PM | Dodge Data & Analytics |
| 12/1/2025 8:37:48 AM | RADISE International, LC |
| 12/1/2025 9:19:41 AM | Southland Construction Inc. |
| 12/1/2025 9:28:45 AM | Gibbs & Register, Inc. |
| 12/1/2025 11:32:26 AM | Dewberry |
| 12/1/2025 12:07:41 PM | KEITH |
| 12/1/2025 2:44:38 PM | Superior Construction Company Southeast, LLC |
| 12/1/2025 3:27:20 PM | Ardurra Group, Inc. |
| 12/1/2025 11:10:07 PM | Dodge Data & Analytics |
| 12/2/2025 8:00:30 AM | Hubbard Construction Company |
| 12/2/2025 9:10:41 AM | Civil/Site Engineering, Inc. |
| 12/2/2025 2:02:50 PM | Blue Iron Foundations & Shoring |
| 12/2/2025 3:33:26 PM | Synergy Earth Systems, LLC |
| 12/2/2025 4:33:31 PM | Sesco Lighting, Inc. |
| 12/3/2025 11:53:29 AM | Traffic Control Devices, LLC |
| 12/4/2025 3:09:34 PM | Protean Design Group, Inc. |
| 12/5/2025 8:15:06 AM | SICE, INC. |
| 12/5/2025 11:14:00 AM | DRMP, Inc. |
Addition 1
Posted: 8/18/2025
Type of Addition: Public Notices 250801
Overview: 250801 Prebid Meeting Notice 9-4-2025
Documents:
Addition 2
Posted: 9/22/2025
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 9 pages and the following attachments: updated SP-202 Offsite Structure Demolition Exhibit; signed Utility Work Schedules (UWS). Reference Documents: (1 KMZ and 10 CAD files, 3 reports ( 1 Geotech Report and 2 Soil Survey Reports) via embedded link. Revised Plan Sheets are being issued concurrently as separate documents.
Deadline: 10/16/2025 1:30 PM
Solicitation #: 250801
Documents:
Addition 3
Posted: 9/23/2025
Type of Addition: Revised Public Notice
Overview: 250801 Bid Opening Meeting Notice 10-16-2025
Documents:
Addition 4
Posted: 10/3/2025
Type of Addition: Addendum No. 2
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 24 pages and the following attachments: SP-901, Exhibit; Revised Section 01010 Summary of Work for TWA Utility Improvement TSP; Reference Documents: (Nelson Poinciana Pwky Asbestos Survey Report - 4919-8994-8267 1) via embedded link. Revised Plan Sheets are being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Addition 5
Posted: 10/10/2025
Type of Addition: Addendum No. 3
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 11 pages and the following attachments: Fuel Adjustment Form; SP-107 Restricted Work Zone Exhibit; Section 10 – Partnering and Disputes Resolution; Attachment A – Disputes Review Board Three Party Agreement. The Revised Bid Form (xlsx) and Revised Plan Sheets are being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Addition 6
Posted: 10/11/2025
Type of Addition: Addendum No. 4
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page and the following attachments: The Revised Bid Form (xlsx) is being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Addition 7
Posted: 10/16/2025
Type of Addition: Bid Opening Minutes 538-235A
Overview: Bid Opening Minutes 538-235A
Documents:
Addition 8
Posted: 10/17/2025
Type of Addition: REVISED_Bid Opening Minutes 538-235A
Overview: REVISED_Bid Opening Minutes 538-235A
Documents:
Addition 9
Posted: 11/24/2025
Type of Addition: Notice of Intent to Award 250801
Overview:
Documents:
Addition 10
Posted: 11/25/2025
Type of Addition: Bid Tabulation 250801
Overview:
Documents:
Posted: 8/18/2025
Type of Addition: Public Notices 250801
Overview: 250801 Prebid Meeting Notice 9-4-2025
Documents:
Posted: 9/22/2025
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 9 pages and the following attachments: updated SP-202 Offsite Structure Demolition Exhibit; signed Utility Work Schedules (UWS). Reference Documents: (1 KMZ and 10 CAD files, 3 reports ( 1 Geotech Report and 2 Soil Survey Reports) via embedded link. Revised Plan Sheets are being issued concurrently as separate documents.
Deadline: 10/16/2025 1:30 PM
Solicitation #: 250801
Documents:
Posted: 9/23/2025
Type of Addition: Revised Public Notice
Overview: 250801 Bid Opening Meeting Notice 10-16-2025
Documents:
Posted: 10/3/2025
Type of Addition: Addendum No. 2
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 24 pages and the following attachments: SP-901, Exhibit; Revised Section 01010 Summary of Work for TWA Utility Improvement TSP; Reference Documents: (Nelson Poinciana Pwky Asbestos Survey Report - 4919-8994-8267 1) via embedded link. Revised Plan Sheets are being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Posted: 10/10/2025
Type of Addition: Addendum No. 3
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 11 pages and the following attachments: Fuel Adjustment Form; SP-107 Restricted Work Zone Exhibit; Section 10 – Partnering and Disputes Resolution; Attachment A – Disputes Review Board Three Party Agreement. The Revised Bid Form (xlsx) and Revised Plan Sheets are being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Posted: 10/11/2025
Type of Addition: Addendum No. 4
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2025, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page and the following attachments: The Revised Bid Form (xlsx) is being issued concurrently as separate documents.
Solicitation #: 250801
Documents:
Posted: 10/16/2025
Type of Addition: Bid Opening Minutes 538-235A
Overview: Bid Opening Minutes 538-235A
Documents:
Posted: 10/17/2025
Type of Addition: REVISED_Bid Opening Minutes 538-235A
Overview: REVISED_Bid Opening Minutes 538-235A
Documents:
Posted: 11/24/2025
Type of Addition: Notice of Intent to Award 250801
Overview:
Documents:
Posted: 11/25/2025
Type of Addition: Bid Tabulation 250801
Overview:
Documents: