Okaloosa County Sealed Solicitation
Title: County Pond 314 Improvements-CV
Deadline: 5/14/2025 3:00 PM (UTC-06:00) Central Time (US & Canada)
Status: In Review
Solicitation Number: ITB PW 15-25
Description: PART 1 - GENERAL
1.01 Work Covered by the Contract Documents
A. The project intent is to expand Pond 314 with the construction and piped connection of two new ponds and replace fencing around Ponds 312 and 313.
B. The WORK covered by the CONTRACT Documents includes removing dilapidated wooden fence and install galvanized chain-link fencing around Ponds 312 and 313. Includes excavation, grading, sodding, piping and fencing the two expansion ponds east of County Pond 314 and other WORK as shown on the construction drawings and described in the specifications.
1.02 Work Sequence
A. The work sequence will be determined by the CONTRACTOR.
1.03 Contractor’s Use of Premises
A. The CONTRACTOR may use the Permanent Drainage Easements within the construction limits and the area within the temporary construction easement.
B. CONTRACTOR shall assume full responsibility for safety at the work site for all workers and visitors.
C. The CONTRACTOR shall send proper notices, make all necessary arrangements, and perform all services required in the care and maintenance of all OWNER and public utilities within the construction limits.
Pre-Bid Meeting Date: 4/29/2025 9:00 AM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.A mandatory pre-bid conference will be held at 09:00 AM (CST) on April 29, 2025 at the Okaloosa County Public Works Office, 1759 S. Ferdon Blvd., Crestview, FL.
Documents:
Documents as of 4/11/2025 |
---|
Login to view documents |
Login to view documents |
Addition 1
Posted: 4/25/2025
Type of Addition: Addendum 1
Overview: Updated Bid Sheet
Deadline: 5/14/2025 3:00 PM
Solicitation #: ITB PW 15-25
Documents:
Addition 2
Posted: 5/1/2025
Type of Addition: Addendum 2
Overview: Addendum 2 the add updated bid sheet/schedule, constructions plans/drawings for the project, the GEO Tech Report, Questions and Answers and the Agenda Minutes.
Documents:
Addition 3
Posted: 5/2/2025
Type of Addition: Addendum 3
Overview: Addendum 3 Sheet 5, General Notes, Sheet Update
Documents:
Addition 4
Posted: 5/22/2025
Type of Addition: In Review
Question 1
Posted: 4/29/2025
Question: Is there an available GeoTech report available to reference?
Response: see addendum 2
Question 2
Posted: 4/29/2025
Question: With the exception of Sunshine 811, what other permits will be required for this project?
Response: see addendum 2
Question 3
Posted: 4/29/2025
Question: 1. On dewatering actives is there going to be a specific location on dewatering, or will we be able to dewater down the FDOT bar ditch. 2.A copy of the Geotechnical report? 3.REGULAR EXCAVATION materials are to be disposal of at a location of our choosing? or will they be stocked piled at the laydown location for tracking of CY moved? 4.Where is the laydown location ? 5.Is all aspect of survey being covered by site contractor if so what line item should it be placed under?
Response: see addendum 2
Posted: 4/25/2025
Type of Addition: Addendum 1
Overview: Updated Bid Sheet
Deadline: 5/14/2025 3:00 PM
Solicitation #: ITB PW 15-25
Documents:
Posted: 5/1/2025
Type of Addition: Addendum 2
Overview: Addendum 2 the add updated bid sheet/schedule, constructions plans/drawings for the project, the GEO Tech Report, Questions and Answers and the Agenda Minutes.
Documents:
Posted: 5/2/2025
Type of Addition: Addendum 3
Overview: Addendum 3 Sheet 5, General Notes, Sheet Update
Documents:
Posted: 5/22/2025
Type of Addition: In Review
Posted: 4/29/2025
Question: Is there an available GeoTech report available to reference?
Response: see addendum 2
Posted: 4/29/2025
Question: With the exception of Sunshine 811, what other permits will be required for this project?
Response: see addendum 2
Posted: 4/29/2025
Question: 1. On dewatering actives is there going to be a specific location on dewatering, or will we be able to dewater down the FDOT bar ditch. 2.A copy of the Geotechnical report? 3.REGULAR EXCAVATION materials are to be disposal of at a location of our choosing? or will they be stocked piled at the laydown location for tracking of CY moved? 4.Where is the laydown location ? 5.Is all aspect of survey being covered by site contractor if so what line item should it be placed under?
Response: see addendum 2