St. Johns River Water Management District Sealed Solicitation

Title: Flood Control Structure Celesco Replacement

Deadline: 12/17/2021 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: 37476

Description:

 

Provide two model units of the same brand; eighteen (18) having full stroke string lengths of 120 inches, and fourteen (14) with string lengths of 240 inches.  The output specifications of the units shall support SDI-12 or 4-20 milliamp sensor connectivity.  Provide all detailed specifications of the units proposed, including;

 

a.       Full stroke range

b.       Unit weight

c.       Enclosure material

d.       Cable tension

e.       Cable dimension

f.        Cable material

g.       Sensing circuit

h.       Electrical connection

 


Documents:

Documents as of 11/19/2021
QR_37476.pdf