County of Escambia Sealed Solicitation

Title: PD 22-23.008 Maple Oaks Stormwater Rehabilitation (FEMA)

Deadline: 12/6/2022 3:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Awarded

Solicitation Number: PD 22-23.008

Description: This project consists of replacing the 48” Corrugated Plastic Pipe (CPP) and one (1) open-throated inlet doghouse structure that was damaged as a result of Hurricane Sally. The project area is within the Maple Oaks subdivision, which is located approximately 1,900-ft. east of the intersection of US Hwy. 29 and Ten Mile Road. The 48” CPP replacement is located within a 55-ft. wide drainage easement that runs west of, and parallel to Tara Dawn Lane. The project length is approximately 1,533-LF, and crosses Chippewa Way.  


Pre-Bid Meeting Date: 11/8/2022 10:00 AM

Pre-Bid Meeting Details: Non-mandatory TEAMS Meeting


Documents:

Documents as of 10/24/2022
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Addition 1

Posted: 11/21/2022

Type of Addition: Addendum 1

Overview: 1. Performance and Payment Bonds are required
2. Warranty is two years after final project completion
3. Retainage is 5% of gross billed amount
4. Supplemental Provisions for Construction are provided.

5. Use of 48" ADS HP Grey Pipe NOT allowed

Documents:

Addition 2

Posted: 12/6/2022

Type of Addition: In Review

Documents:

Addition 3

Posted: 1/5/2023

Type of Addition: Corrected Bid Tab Under Review

Overview:

Documents:

Addition 4

Posted: 2/16/2023

Type of Addition: Award Information

Question 1

Posted: 11/15/2022

Question: Are performance and payment bonds required for this project? What is the retainage for this project? What is the warranty length for this project? These are not shown in the solicitation.

Response: Yes, Performance and Payment Bonds are required. An addendum will be published to include the missing information.

Posted: 11/21/2022

Type of Addition: Addendum 1

Overview: 1. Performance and Payment Bonds are required
2. Warranty is two years after final project completion
3. Retainage is 5% of gross billed amount
4. Supplemental Provisions for Construction are provided.

5. Use of 48" ADS HP Grey Pipe NOT allowed

Documents:

Posted: 12/6/2022

Type of Addition: In Review

Documents:

Posted: 1/5/2023

Type of Addition: Corrected Bid Tab Under Review

Overview:

Documents:

Posted: 2/16/2023

Type of Addition: Award Information

Posted: 11/15/2022

Question: Are performance and payment bonds required for this project? What is the retainage for this project? What is the warranty length for this project? These are not shown in the solicitation.

Response: Yes, Performance and Payment Bonds are required. An addendum will be published to include the missing information.