Rio Rancho Public Schools Sealed Solicitation

Title: Synthetic Grass Field Replacement @ V. Sue Cleveland High School - Volume 1 (Pricing)

Deadline: 11/11/2021 2:00 PM   (UTC-07:00) Mountain Time (US & Canada)

Status: Deadline Expired

Solicitation Number: RFP No. 2022-009-FAC

Description: Refer to Specification Section 01 1000 - Summary in the Project Manual


Pre-Bid Meeting Date: 10/14/2021 10:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.Mandatory Pre-Proposal Conference – Followed by a Site Visit RRPS Board Rooms 1&2, 500 Laser Road NW Rio Rancho, NM 87124


Documents:

Documents as of 11/5/2021
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Question 1

Posted: 10/19/2021

Question: If available, will you please upload the pre-bid sign in sheet from the meeting on the 14th? Thanks.

Response: See Addenda No. 1

Question 2

Posted: 10/20/2021

Question: Page 80 is missing the signature on the price proposal page.

Response: See Addenda No. 1

Question 3

Posted: 10/27/2021

Question: Cleveland 1. Is there a wage decision for this project? 2. Section 01 2100 for allowances includes 2 allowances. 1 For converting the as-builts to CAD but there is no bid item for this. Will one be added? The allowance for underdrain does not include an amount. What amount should be included for this? 3. GRT is not on the bid form. Will this be added to the bid form or should the contractor include this on each bid item?

Response: See Addenda No. 1

Question 4

Posted: 11/3/2021

Question: Although the addendum states the $20,000 allowance for conversion of s-built drawings to CAD file was removed, the allowance is still present on sheet 00 119 73. Please clarify.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 5

Posted: 11/3/2021

Question: Page C-102, Demolition Plan, keyed note 1 calls for removal and disposal of turf field. Is aggregate base to be removed with turf field or is aggregate base to remain? If entire existing aggregate base is not removed, please update quantity of Bid Proposal Form, page 00 1119-80 Base Bid item 7.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 6

Posted: 11/3/2021

Question: Keyed note 4 on page C-104 calls for a 40” high CMU wall. Please locate the beginning and end of the wall, exact location, and specify type of CMU (color, etc.)

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 7

Posted: 11/3/2021

Question: Page C-104 Grading & Drainage, keyed note 3 for base bid item 5 - header curb, please indicate the exact location, beginning and end of the header curb. Also, verify the quantity on the Bid Proposal Form.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 8

Posted: 11/3/2021

Question: The Statement of Qualifications for Subcontractors, Section 3a states “Provide copies of Performance Evaluation Reports prepared in connection with projects described in Para. 3.a.above.” Can you please clarify what information you are looking for?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 9

Posted: 11/3/2021

Question: Base bid form, add alt 1, item 5 specifies a 4’ dia MH type C. Please indicate where on the plan this item is to be installed.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 10

Posted: 11/3/2021

Question: Please indicate location of excavation for Bid item number 1 for additive alternate 2 – Unclassified Excavation and confirm quantity.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 11

Posted: 11/3/2021

Question: Where is Add. Alt. 1 - Field Underdrain System shown on the plans? What are quantities shown on Add. Alt. 1 based on?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 12

Posted: 11/3/2021

Question: Demolition note #8 on C-102 – states “remove and dispose of chain link fence”. Are these costs are to be carried under the base bid, or which alternate?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 13

Posted: 11/3/2021

Question: Base Bid Item #4 on bid form “liner, base rock section, leveling course, nailer board” is for 11,791 SY. Please confirm this is only for the area where the high jump is to be demolished and the synthetic turf base section is to be installed (approximately 565 SY).

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Question 14

Posted: 11/3/2021

Question: Base Bid Item #7 on bid form states that the subgrade preparation of 12” at 95% compaction is for 11,791 SY. Please confirm this is only for the area where the high jump is to be demolished and the synthetic turf base section is to be installed (approximately 565 SY).

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 10/19/2021

Question: If available, will you please upload the pre-bid sign in sheet from the meeting on the 14th? Thanks.

Response: See Addenda No. 1

Posted: 10/20/2021

Question: Page 80 is missing the signature on the price proposal page.

Response: See Addenda No. 1

Posted: 10/27/2021

Question: Cleveland 1. Is there a wage decision for this project? 2. Section 01 2100 for allowances includes 2 allowances. 1 For converting the as-builts to CAD but there is no bid item for this. Will one be added? The allowance for underdrain does not include an amount. What amount should be included for this? 3. GRT is not on the bid form. Will this be added to the bid form or should the contractor include this on each bid item?

Response: See Addenda No. 1

Posted: 11/3/2021

Question: Although the addendum states the $20,000 allowance for conversion of s-built drawings to CAD file was removed, the allowance is still present on sheet 00 119 73. Please clarify.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Page C-102, Demolition Plan, keyed note 1 calls for removal and disposal of turf field. Is aggregate base to be removed with turf field or is aggregate base to remain? If entire existing aggregate base is not removed, please update quantity of Bid Proposal Form, page 00 1119-80 Base Bid item 7.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Keyed note 4 on page C-104 calls for a 40” high CMU wall. Please locate the beginning and end of the wall, exact location, and specify type of CMU (color, etc.)

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Page C-104 Grading & Drainage, keyed note 3 for base bid item 5 - header curb, please indicate the exact location, beginning and end of the header curb. Also, verify the quantity on the Bid Proposal Form.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: The Statement of Qualifications for Subcontractors, Section 3a states “Provide copies of Performance Evaluation Reports prepared in connection with projects described in Para. 3.a.above.” Can you please clarify what information you are looking for?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Base bid form, add alt 1, item 5 specifies a 4’ dia MH type C. Please indicate where on the plan this item is to be installed.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Please indicate location of excavation for Bid item number 1 for additive alternate 2 – Unclassified Excavation and confirm quantity.

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Where is Add. Alt. 1 - Field Underdrain System shown on the plans? What are quantities shown on Add. Alt. 1 based on?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Demolition note #8 on C-102 – states “remove and dispose of chain link fence”. Are these costs are to be carried under the base bid, or which alternate?

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Base Bid Item #4 on bid form “liner, base rock section, leveling course, nailer board” is for 11,791 SY. Please confirm this is only for the area where the high jump is to be demolished and the synthetic turf base section is to be installed (approximately 565 SY).

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)

Posted: 11/3/2021

Question: Base Bid Item #7 on bid form states that the subgrade preparation of 12” at 95% compaction is for 11,791 SY. Please confirm this is only for the area where the high jump is to be demolished and the synthetic turf base section is to be installed (approximately 565 SY).

Response: Pending Review and Response (Answer will be provided in Addenda No. 2)