City of Sebring Sealed Solicitation
Title: Panther Parkway / Little Red Water Lake Force Main Extension
Deadline: 12/21/2021 3:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 22-005
Description:
This Project is for the
construction of an extension of a force main to service future development
along the Sebring Parkway and terminating at the northerly right-of-way of
Beacon Road, East of the Sebring Parkway intersection, Sebring, Florida,
Highlands County, being further described as follows:
The proposed force main starting
point on the Westerly R/W of the Sebring Parkway Station ±9+77 (±284+50[PH1])
being a 10" wet tap into an existing 10" force main; thence a
10" directional bore Northeasterly across said Sebring Parkway to the
Northeasterly R/W, thence Northwesterly a distance of ±6,230 LF along the
Northeasterly R/W of said Sebring Parkway by both open ditch installation and
directional bores; thence ±625 LF Northerly along a Utility Easement by both
open ditch installation and directional bore across Beacon Road to the
Northerly R/W for a future tie-in of a force main by others, in Highlands
County, Florida. Sections 18 & 19, Township 34S, Range 29E, and Sections 12
& 13, Township 34S, Range 28E.
NOTE: The Sebring Parkway has an
existing drainage system with retention areas and earthen grassed ditch block
overflow structures. All areas in the Parkway will be completely restored and
sodded to the original condition including elevations. The grassed ditch block
must be rebuilt to original size and grade. The contractor will be responsible
for watering restored R/W until the newly planted sod is established.
See plans for additional
information and specifications.
The engineer’s cost estimate for
this project is $660,000.00.
Documents:
Documents as of 11/17/2021 |
---|
22-005 Panther Parkway - Little Red Water Lake Force Main Connection.pdf |
Addition 1
Posted: 12/16/2021
Type of Addition: Addendum 1 - Questions & Answers
Documents:
Addition 2
Posted: 12/16/2021
Type of Addition: Addendum 2 - Amendment to Official Bid Form
Documents:
Addition 3
Posted: 12/28/2021
Type of Addition: In Review
Overview: Notice of Staff Recommendation
Documents:
Addition 4
Posted: 1/21/2022
Type of Addition: Award Information
Overview: Contractor - Go Underground Utilities LLC
Documents:
Posted: 12/16/2021
Type of Addition: Addendum 1 - Questions & Answers
Documents:
Posted: 12/16/2021
Type of Addition: Addendum 2 - Amendment to Official Bid Form
Documents:
Posted: 12/28/2021
Type of Addition: In Review
Overview: Notice of Staff Recommendation
Documents:
Posted: 1/21/2022
Type of Addition: Award Information
Overview: Contractor - Go Underground Utilities LLC
Documents: