Lebanon Sealed Solicitation
Title: "EAST APRON PAVEMENT REHABILITATION” TAD No. 95-555-0174-22 ATKINS No. 100078678
Deadline: 12/1/2022 1:00 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Description: This project consists of mill and overlay of approximately 18,700 square yards of paved aircraft parking and maneuvering area on the east side of the airport (East Apron), including connector taxiway A1 joining the East Apron to the airport’s main Runway 1-19, along with parts of two connector taxiways (Taxiway A2 and Taxiway A3 from the airport’s main runway to its parallel taxiway totaling another approximately 2,000 square yards. Other elements include replacement of 98 square yards of asphalt pavement with concrete at a gate entrance, removal of existing tie-downs and installation of new tie-downs with new configuration, and minor grading to the south of the Apron.
Pre-Bid Meeting Date: 11/8/2022 1:00 PM
Pre-Bid Meeting Details: A Pre-Bidding Conference will be held at 1:00 PM, Local Central Time on November 8th, 2022 at the Lebanon Municipal Airport for the purposes of answering questions, discussing the project, and reviewing the project site.
Documents:
Documents as of 11/3/2022 |
---|
A3-ADDVERT-M54 East Apron Pvmt Rehab (2).pdf |