County of Beaufort Sealed Solicitation

Title: Hilton Head Island Airport Terminal Improvements

Deadline: 6/23/2022 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Cancelled

Solicitation Number: IFB 060922

Description: Hilton Head Island Airport Terminal Improvements


Pre-Bid Meeting Date: 5/17/2022 2:00 PM

Pre-Bid Meeting Details: The physical location is: Hilton Head Island Library 11 Beach City Road Hilton Head Island, SC 29926 Or Virtually Join Zoom Meeting https://us02web.zoom.us/j/84798972151?pwd=b0tkNzdDTnVyNkVyVjhXQnFOOEVWZz09 Meeting ID: 847 9897 2151 Passcode: 396721 One tap mobile +16468769923,,84798972151# US (New York) +13017158592,,84798972151# US (Washington DC) Dial by your location +1 646 876 9923 US (New York) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 346 248 7799 US (Houston) +1 408 638 0968 US (San Jose) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) Meeting ID: 847 9897 2151 Find your local number: https://us02web.zoom.us/u/kEMbmIB21


Documents:

Documents as of 5/6/2022
Login to view documents
Login to view documents
Login to view documents
Addition 1

Posted: 5/16/2022

Type of Addition: Pre-Bid Meeting Site Change

Overview: Due to unforeseen circumstances the location of the the Pre-Bid Meeting has moved to the Hilton Head Island Library Branch 11 Beach City Road Hilton Head Island, SC 29926

Pre-Bid Meeting Details: Hilton Head Branch 11 Beach City Road Hilton Head Island, SC 29926

Addition 2

Posted: 5/20/2022

Type of Addition: Addendum 1

Overview: Please see the attached Addendum.

Documents:

Addition 3

Posted: 6/2/2022

Type of Addition: Addendum 2

Overview: Please find Addendum #2 attached.

Documents:

Addition 4

Posted: 6/2/2022

Type of Addition: Addendum 3

Overview: Please find Addendum 3 along with the Electronic Bid Form attached.

Deadline: 6/23/2022 3:00 PM

Documents:

Addition 5

Posted: 6/10/2022

Type of Addition: Addendum 4

Overview: Please find Addendum 4 and the updated Schedule of Values attached. 

Documents:

Addition 6

Posted: 6/15/2022

Type of Addition: Addendum 5

Overview: Please see attached revised schedule of values to replace the one distributed with Addendum 4.

Documents:

Addition 7

Posted: 6/23/2022

Type of Addition: In Review

Addition 8

Posted: 6/24/2022

Type of Addition: Bid Tab

Overview: See attached

Documents:

Addition 9

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We received two bids for this project that were both way over our current budget. We will rebid the project and break down the construction in phases. If you have any question, please call the Procurement Services Director at 843-255-2304. We should have the new bid documents published within the next few weeks.

Addition 10

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We received two bids for this project that were both way over our current budget. We will rebid the project and break down the construction in phases. If you have any question, please call the Procurement Services Director at 843-255-2304. We should have the new bid documents published within the next few weeks.

Addition 11

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We will rebid the project to include phases within the next few weeks. Thank you to the two firms who submitted bids. Unfortunately, both bids were way over our current budget.

Question 1

Posted: 5/10/2022

Question: Will a list of plan holders be made available for this project?

Response: We will use the Mandatory Pre-Bid attendees as the plan holders.

Question 2

Posted: 5/10/2022

Question: At the informational pre-bid meeting held, it was mentioned that General Contractors bidding this project must be SCDOT pre-qualified. There is no mention of this in the Documents issued for bidding. Please confirm this is not a requirement of the General Contractor (unless self-performing road work)

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 3

Posted: 5/11/2022

Question: I would like to respectfully request your consideration of G410 60mil adhered Thermoplastic Polyvinyl-Chloride (PVC) Roofing System with a 20 year warranty, as a Substitution Hilton Head Island Airport (HXD) Terminal Improvements Sika Sarnafil manufactures thermoplastic PVC membranes that are energy-efficient and meet Energy Star and LEED criteria for low slope and steep slope applications. Below is the G410 Guide Spec, a G410 Product Data Sheet and other pertinent data, as it pertains to the project specifications. Our G410 60mil adhered membrane is Energy Star Rated and meets ASTM requirements. Video: Roofing Membrane Fire Test Sarnafil® G 410 60 Mil Energysmart Roof® Membrane: Product Data Sheet https://usa.sika.com/content/dam/dms/us01/5/sarnafil-g-410-60energysmart.pdf If you have any questions, would like samples, additional information, etc., please feel free to call me.

Response: There will be an addendum issued on Friday May 20, 2022. Your substitution request will be addressed in that Addendum.

Question 4

Posted: 5/12/2022

Question: Is the IFB form required to be submitted with the Bid form?

Response: Yes, the IFB form is also to be submitted along with the other documents listed in the package.

Question 5

Posted: 5/12/2022

Question: Can a copy of the Geotechnical report be provided? S-001 Earthquake Foundation Drains note 4 references this but only thing provided are the boring logs.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 6

Posted: 5/12/2022

Question: Appendix D Davis Bacon Wage Rates only lists the rates for Highway Construction trades. Will the rates for Building Construction be issued?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 7

Posted: 5/12/2022

Question: Can a copy of the Civil CAD file be provided?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 8

Posted: 5/13/2022

Question: Can the civil CAD files be made available for the bid process?

Response: We are waiting for a response from the consultant

Question 9

Posted: 5/16/2022

Question: What is the process to request a product to be added as an approved equal to those listed in specific specification section(s)? Example we request to add as an approved product to specification 096623 Terrazzco Brand Product by Concord Terrazzo Company. We can furnish a substitution request form with product data.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 10

Posted: 5/16/2022

Question: What location will be available for the general contractor's field office trailer and parking? What location will be available for on site worker parking?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 11

Posted: 5/16/2022

Question: The Project Special Provisions note that the GC is to provide a field office for owners engineer and representative. Specification 015000, 2.1, B notes a Common Use office for owner/GC is required. Please confirm which is required.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 12

Posted: 5/16/2022

Question: Drawings AC-102 and AC-103 shows 2 contractor security checkpoints on plan. Is it required to have full time gate guard at each of these locations during the work of these phases?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 13

Posted: 5/16/2022

Question: AC-700 shows details for Temporary Security/SIDA fence. What height is this fence required to be?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 14

Posted: 5/16/2022

Question: Drawing PH-101 and others notes to reference A-801 for Temporary Plans and details. A-801 was not issued with bid documents?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 15

Posted: 5/16/2022

Question: If Alternate 1 is accepted by the owner, will additional time be added to the contract duration?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 16

Posted: 5/16/2022

Question: Bid Schedule item 97 (Allowance 13) has been pre-populated in the amount of $200,000. Allowance specification 012100 lists the amount as $150,000. Which is correct?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 17

Posted: 5/16/2022

Question: Will you an accept an alternate for Allowance No.16–Digital Display:Lump-SumAllowance: Include the sum of $225,000.00for an ENGAGE Series flat-panel display as manufactured by Nanolumens.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 18

Posted: 5/17/2022

Question: Temporary Barriers: 1) Drawing PH-101E notes to erect construction barrier between existing building and new terminal addition. Can a detail be provided for the required barrier? 2) Drawing PH-401B notes to construct temporary barrier inside existing building. Can a detail be provided for the required barrier?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 19

Posted: 5/17/2022

Question: A4-11 shows TRB-1 in restrooms. A-751 does not list this material. Please confirm base material and the height of base.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 20

Posted: 5/17/2022

Question: S-001 Deep soil Modification note 1 references this is to be done at existing footings at locations shown on plans. Demolition drawings do not show slab removal required to perform this work? Can this be added to demolition and structural plans?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 21

Posted: 5/17/2022

Question: Specification 108213 Roof Equipment Screen is included in project manual, however the roof plans do not call out where these are required. Confirm if these are limited to EX-RTU-1 thru 6 or provide all locations to be included.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 22

Posted: 5/17/2022

Question: Specification 075400, section 2.1 lists both KEE sheet and PVC sheet roofing. Confirm we have the option to uses either.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 23

Posted: 5/17/2022

Question: S-101 and S-101 Keynote 7 regarding locations of Deep Soil Modifications to be done at existing footings, can you provide the size of these existing footing and depth below finish slab?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 24

Posted: 5/17/2022

Question: Bid schedule line items 132 and 133 both are noted as Year 2 Maintenance. 1) is this to be same scope as item 131? 2) should item 133 description be changed?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 25

Posted: 5/17/2022

Question: A-701 and A-702 call for recessed floor matts at entrance vestibules. Can either a specification or Basis of Design be provided for this.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 26

Posted: 5/17/2022

Question: A-571 shows various expansion joint details but the floor and roof plans do not call out location of the expansion joints. Please confirm required locations.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 27

Posted: 5/17/2022

Question: A-011 and A-012 shows several 6' benches and states to reference spec. We do not find these listed in specification. Please provide spec or Basis of Design.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 28

Posted: 5/17/2022

Question: A-013 shows several dual bollard bicycle racks as specified. We do not find these listed in specification. Please provide spec or Basis of Design.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 29

Posted: 5/17/2022

Question: Referencing the below regarding the QC requirements on the project.-If we engage a consultant, how much time is required? Only while paving operations are ongoing? If someone carries a full time employee for the entirely of the project and someone else takes the consultant route without any parameters, that’s quite a disparity in dollars carried. Part 2 – General Construction Items - Item C-100 Contractor Quality Control Program (CQCP) a. Program Administrator. The Contractor Quality Control Program Administrator (CQCPA) must be a full-time employee of the Contractor, or a consultant engaged by the Contractor. The CQCPA must have a minimum of five (5) years of experience in QC pavement construction with prior QC experience on a project of comparable size and scope as the contract. Included in the five (5) years of paving/QC experience, the CQCPA must meet at least one of the following requirements: Item C-100 Contractor Quality Control Program (CQCP) 3 (1) Professional Engineer with one (1) year of airport paving experience. (2) Engineer-in-training with two (2) years of airport paving experience. (3) National Institute for Certification in Engineering Technologies (NICET) Civil Engineering Technology Level IV with three (3) years of airport paving experience. (4) An individual with four (4) years of airport paving experience, with a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology or Construction.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 30

Posted: 5/17/2022

Question:

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 31

Posted: 5/18/2022

Question: Couple of Questions: 1) Will "Plan-Holders from the Mandatory Pre-Bid attendees list" receive Automatic Notifications from Vendor Registry? 2) If we are NOT a plan holder, do we receive automatic notifications for this project or would it be necessary to check the site ? 3) Will you be posting the List of Mandatory Attendees?

Response: If you are a vendor that is on the notification list you will receive notifications whenever there is a change or Addendum. If you see a solicitation posted that you have not received any notifications of you will need to contact Beaufort County Purchasing Department to be manually added to the vendor list. The list of attendees will be included in Addendum #1

Question 32

Posted: 5/18/2022

Question: See below from a prospective landscape subcontractor IN GENERAL Where should items called out for on the plans that are not identified in the Bid Form nor are their written specifications on this. • Site Furnishings (Benches and Bike Racks) are referenced on the plan documents. Is this covered under and allowance or where shall these unit cost items be placed on the bid form and where would one find the specifications thereof? • Tree Arborist and Treatments noted on Sheet L1.03. This requires clarification IF only the trees noted as “Significant Trees” on Sheet L1.1/2 are the trees required for this treatment. 1. ALL SIGNIFICANT ANP SPECIMEN TREES WITHIN LIMIT QF WORK SHALL RECEIVE PRE ANP POST CONSTRUCTION FERTILIZATION ANP MYCOR TREATMENT BY A MASTER ARBORIST. 2. ALL SIGNIFICANT ANP SPECIMEN TREES SHALL BE TREATEP IN ACCORPANCE WITH THE LEVEL 2, BASIC TREE ASSESSMENT PROVlPEP BY TREE PRESERVATION, PATEP 10/15/2020, SEE PROJECT MANUAL APPENPIX E. 3. TREE ROOTS SHALL BE CUT CLEANLY AROUNP EXISTING TREES TO REMAIN LOCATEP APJACENT TO CONSTRUCTION ACTIVITIES. LANDSCAPE • There is significant Landscape Site Work and Clearing called out on the Landscape Set L1.1/2. Where should this work be placed on the Bid Form? • Planters Item 130 appear to be only the fill of the planters NOT construction. We intend to provide soils gravel irrigation and other green goods for this planter FILL. We are EXCLUDING this Vertical Construction. IRRIGATION • Please confirm Sleeving is to be provided in the LS Irrigation Pricing MAINTENANCE • Please clarify the maintenance durations per phase. The Bid form calls for Year 1 , 2 and 3. Is it correct to assume that Phase 1 as completed will have a 3 year duration, Phase 2 as completed will have a 2 year duration and Phase 3 as completed will have a 1 year duration? • Please correct the Bid Form to reflect the correct maintenance typo Line Item 133 and can the Bid Form be provided in Excel? • Please clarify if the maintenance requested to cover only the work per the contract documents and EXCLUDES existing landscape areas and surfaces.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 33

Posted: 5/18/2022

Question: I would like to propose an SBS modified bitumen alternate roof assembly that performs well against fire, jet fuel (chemicals) and the high uplifts required at a coastal area. Proposed assembly, letter of intent to warrant and specification has been sent to Mr. Travis Pence with The Wilson Group Architects for review and consideration in addendum.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Question 34

Posted: 5/19/2022

Question: : See below from a prospective landscape subcontractor IN GENERAL Where should items called out for on the plans that are not identified in the Bid Form nor are their written specifications on this. • Site Furnishings (Benches and Bike Racks) are referenced on the plan documents. Is this covered under and allowance or where shall these unit cost items be placed on the bid form and where would one find the specifications thereof? • Tree Arborist and Treatments noted on Sheet L1.03. This requires clarification IF only the trees noted as “Significant Trees” on Sheet L1.1/2 are the trees required for this treatment. 1. ALL SIGNIFICANT ANP SPECIMEN TREES WITHIN LIMIT QF WORK SHALL RECEIVE PRE ANP POST CONSTRUCTION FERTILIZATION ANP MYCOR TREATMENT BY A MASTER ARBORIST. 2. ALL SIGNIFICANT ANP SPECIMEN TREES SHALL BE TREATEP IN ACCORPANCE WITH THE LEVEL 2, BASIC TREE ASSESSMENT PROVlPEP BY TREE PRESERVATION, PATEP 10/15/2020, SEE PROJECT MANUAL APPENPIX E. 3. TREE ROOTS SHALL BE CUT CLEANLY AROUNP EXISTING TREES TO REMAIN LOCATEP APJACENT TO CONSTRUCTION ACTIVITIES. LANDSCAPE • There is significant Landscape Site Work and Clearing called out on the Landscape Set L1.1/2. Where should this work be placed on the Bid Form? • Planters Item 130 appear to be only the fill of the planters NOT construction. We intend to provide soils gravel irrigation and other green goods for this planter FILL. We are EXCLUDING this Vertical Construction. IRRIGATION • Please confirm Sleeving is to be provided in the LS Irrigation Pricing MAINTENANCE • Please clarify the maintenance durations per phase. The Bid form calls for Year 1 , 2 and 3. Is it correct to assume that Phase 1 as completed will have a 3 year duration, Phase 2 as completed will have a 2 year duration and Phase 3 as completed will have a 1 year duration? • Please correct the Bid Form to reflect the correct maintenance typo Line Item 133 and can the Bid Form be provided in Excel? • Please clarify if the maintenance requested to cover only the work per the contract documents and EXCLUDES existing landscape areas and surfaces

Response: This is a duplicate question. This will be addressed in the addendum scheduled to be issued May 20th

Question 35

Posted: 5/20/2022

Question: Three questions: 1) Where is the paving for item # 60 – P-403 “Bituminous Base Course”? All I’ve found is the Paving Plan (C901) that shows all of the asphalt paving shaded as Normal Duty Asphalt, and the only paving detail I see is on sheet C903 that shows a Prime Coat on top of the 8”GAB and 2” Type C Surface Mix. 2) A prime coat is shown on the paving detail on sheet C903, but I do not see a bid item for it. Will a prime coat be required, and if so, can an item be added for it? 3) Would the County consider applying the SCDOT asphalt liquid index to this project from the time of bid to the time of asphalt placement? With the massive upswing that we are seeing in the cost of liquid asphalt, either we or the GC will have to include a rather large contingency in the bid to cover this amount, and it would almost certainly be less costly to the County to base the asphalt liquid price changes on the SCDOT index rather than having to pay a lump sum contingency amount in the bid.

Response: This will be addressed in Addendum #2. That addendum is expected to be released on June 1.

Question 36

Posted: 5/23/2022

Question: Specification 107516 is part of project manual but no Flagpole locations are found in plans. Please advise quantities and locations.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 37

Posted: 5/23/2022

Question: Questions regarding OH Coiling Doors: 1) A-602 shows door type H10. Can you confirm what type of door this is? 2) A-601 calls out some doors to be an Aluminum Grill Curtain but no specification is provided for that type?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 38

Posted: 5/23/2022

Question: Bid Schedule item 106 lists the unit as "Allow". The allowance specification does not provide any value for this item, Soil testing. Please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 39

Posted: 5/23/2022

Question: At the pre-bid walk thru, access to the airside of the existing building was not provided. Can the owner provide photos of the existing building exterior along various angles of the airside?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 40

Posted: 5/23/2022

Question: Specification 26 05 90 Electrical Testing, section 1.5 B references that an Allowance should be included for this scope. Allowance specification 012100 does not include an amount for this, please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 41

Posted: 5/23/2022

Question: Mechanical Platform areas 201, 202, 203 - What finishes are required for floor, walls and ceilings in these rooms?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 42

Posted: 5/23/2022

Question: Is the overhead structure in baggage 112 and 110 required to be painted? We do not find a room finish schedule that would clarify this and other areas.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 43

Posted: 5/23/2022

Question: A-451, 452, and 453 show exterior steel handrails. Can you confirm if these are to be galvinized and shop finished per spec. 055213, 2.7 or if they will be field painted?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 44

Posted: 5/23/2022

Question: A-462 regarding the louvered equipment screen shown; 1) can you provide the top elevation of The screen? 2) can you provide detail for attachment of screen support posts to structure?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 45

Posted: 5/23/2022

Question: A-703 calls out "Turf" at exterior SARA area 179. Can you provide basis of design for this product.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 46

Posted: 5/23/2022

Question: A-751 and A-752 both list FRP-1 products. Which should be used?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 47

Posted: 5/23/2022

Question: Specification 34 77 15 On page 14 under “D. Accessories” option 8 “Alarm beacon light,” do you know if that beacon light is meant to be triggered by the doors being opened or the temperature inside the cabinet?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 48

Posted: 5/23/2022

Question: RCP plans (A-123, etc.) legend calls out a ACP-5 product, however this product is not listed on A-751 finish schedule, please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 49

Posted: 5/23/2022

Question: Regarding the DBE participation requirements 1) The bid documents appear to note DOT certified companies apply, not just SCDOT? 2) There are limited subs that handle Building Construction work that are SCDOT certified, would you consider allowing use of other state and federal small disadvantaged businesses toward the goal?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 50

Posted: 5/23/2022

Question: Will GC be required to pay for Utility usage costs for construction? It is assumed this would apply to GC field office trailer that would be metered separetly. What about actual building addition construction if electrical/water is tapped off existing service? If we need to meter seperatly would this apply only to the main addition, not the renovation area work?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 51

Posted: 5/23/2022

Question: S-002, Structural Steel note 29 states All steel exposed to view shall be classified as Architecturally Exposed Structural Steel. Would this apply only to steel exposed to the public view or would it also include exposed steel at in-bound and out-bound areas?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 52

Posted: 5/23/2022

Question: NOA1, drawing A-801 details for temporary walkway canopies notes "pre-engineered metal canopy" Is it up to the GC to engineer this? Is there any required framing type that is wanted? Can we use exposed metal stud framing?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Question 53

Posted: 5/24/2022

Question: Architectural Wall Panels Question-Please see below for our RFIs on the HHI project. We asked similar questions on Coastal Carolina, but I imagine we need to formally address some of the same issues for this separate and distinct bid opportunity. 1) Section 064219/2.1/B/5 calls for the FRL paneling to be IMO Certified. To receive IMO certification, Nevamar requires a special order. This certification and the associated adhesive (2.1/B/10) are for marine applications only. Please confirm that these products do not require IMO Certification or the associated marine use adhesive. 2) There are no indications in the Plan or Specs for desired grain direction on WPS-1 & WPS-3 laminate panels. Please confirm that vertical grain direction, if applicable, is required as there are additional costs associated with horizontal grain panel production. 3) Multiple details, like 3/A-566, show the FRL panels receiving a hand applied self-edge. These WPS panel systems are to be fully captured with aluminum extrusion, making it a concealed condition. The labor-intensive edge treatment process is an unnecessary cost driver that adds no performance or safety value to the project. Please confirm that the edges of the fully captured panels are not to receive FRL edge treatment as the fire rated plywood substrate will be concealed by the extrusions. 4) 064219/2.2/B/1 states the “recommended substrate” is ¾” FR OSB or plywood. Confirm ¾” FR material is a requirement for panel substrates. Landscaping Question-The RFI AD_01 came back and they are referring to a tree preservation plan (answering my RFI on the tree clarifications ) but there is no tree preservation plan only trees noted on the landscape plans. Do you have or can you request said plan. This tree work is very subjective on the pruning aspect and hopefully this is clarified on this plan. Need help to get the right numbers. Thank you

Response: We have already responded to this question. Please see the public solicitation.

Question 54

Posted: 5/25/2022

Question: Several different bid questions as follows: 1. A-431 enlarged SARA area shows a decorative fence or barrier. Can you provide details and specification for this fence/barrier? 2. A415 shows steel support framing for restroom counters. Can you provide the size of the steel members for this. 3. 6/A-572 detail for expansion joint in exterior wall does not match the product listed in specification 079513.16. The product in the specification is a compressible foam seal. Please clarify the requirement. 4. S-113 and S-122 do not call out a detail for the expansion joint between C/L 27 and 27.1. Can you provide structural details for these locations. 5. A-601 door schedule notes typically at Overhead Coiling doors that the frame materials is to be "Per Manufacturer". Typically manufacturers do not require a frame as long as they can anchor to wall. Will any frames be required at these locations and if so can head, jamb and sill details be provided. 6. A-101 shows a cast in place curb outside of the inbound baggage room and notes to reference structural. S-101 does not show any curb or pad at this location, please advise. 7. We do not find locations required for Detail 8/A-525 called out on ceilings plans, can you advise on locations?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Question 55

Posted: 5/25/2022

Question: The LED TV monitors and display - are these owner supplied.

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Question 56

Posted: 5/26/2022

Question: Detail 2 of A-271 - shows bag scale as specified. Can you provide specifications for this bag scale.

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Question 57

Posted: 5/26/2022

Question: Several questions raised by subcontractor regarding division 28 Access Control and Surveillance scope: 1) Are redundant servers and network switches required? 2) Is the security vendor responsible for providing the secure equipment rack for the ACS and VMS servers? 3) Is the security vendor responsible for installing the security LAN infrastructure? 4) Specs state owner to provide network switches. Is the airport authority providing network switches for both the ACS and VMS? 5) Does the airport authority have a preferred network switch if vendor supplied? 1) ACS System Specs reference an IDS system. Drawings do not include information on system or location. 2) IDF numbers do not match between T-002 & T-202. Please verify MDF/IDF room numbers. 3) Is the TSA credential a government issued credential that is equivalent to a CAC or TWIC credential? 4) Will the access control database communicate to a government database to verify that a TSA card holder is still active and if they are not, remove their access automatically? 5) Will there be any access control doors that only a TSA credential can be used and that the credential will need to be verified to a government database before the local access control system can allow access?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Question 58

Posted: 5/26/2022

Question: The following are several different questions requesting response. 1) Will Termite Control application be required on this project? If so can a specification be provided. 2) M0.01, Temp GMU-1 note 4 notes to provide a factory roof curb. Since this unit is ground mounted, is this correct? 3) NOA1 page 11 of 11 notes drawing A-750 as being issued in addendum. This was not included in the NOA1 file?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Question 59

Posted: 5/26/2022

Question:

Response: We have already responded to this question. Please see the public solicitation.

Posted: 5/16/2022

Type of Addition: Pre-Bid Meeting Site Change

Overview: Due to unforeseen circumstances the location of the the Pre-Bid Meeting has moved to the Hilton Head Island Library Branch 11 Beach City Road Hilton Head Island, SC 29926

Pre-Bid Meeting Details: Hilton Head Branch 11 Beach City Road Hilton Head Island, SC 29926

Posted: 5/20/2022

Type of Addition: Addendum 1

Overview: Please see the attached Addendum.

Documents:

Posted: 6/2/2022

Type of Addition: Addendum 2

Overview: Please find Addendum #2 attached.

Documents:

Posted: 6/2/2022

Type of Addition: Addendum 3

Overview: Please find Addendum 3 along with the Electronic Bid Form attached.

Deadline: 6/23/2022 3:00 PM

Documents:

Posted: 6/10/2022

Type of Addition: Addendum 4

Overview: Please find Addendum 4 and the updated Schedule of Values attached. 

Documents:

Posted: 6/15/2022

Type of Addition: Addendum 5

Overview: Please see attached revised schedule of values to replace the one distributed with Addendum 4.

Documents:

Posted: 6/23/2022

Type of Addition: In Review

Posted: 6/24/2022

Type of Addition: Bid Tab

Overview: See attached

Documents:

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We received two bids for this project that were both way over our current budget. We will rebid the project and break down the construction in phases. If you have any question, please call the Procurement Services Director at 843-255-2304. We should have the new bid documents published within the next few weeks.

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We received two bids for this project that were both way over our current budget. We will rebid the project and break down the construction in phases. If you have any question, please call the Procurement Services Director at 843-255-2304. We should have the new bid documents published within the next few weeks.

Posted: 8/25/2022

Type of Addition: Cancellation Information-In accordance with the published bid documents the County has decided to reject all bids and rebid the project at a later date.

Overview: We will rebid the project to include phases within the next few weeks. Thank you to the two firms who submitted bids. Unfortunately, both bids were way over our current budget.

Posted: 5/10/2022

Question: Will a list of plan holders be made available for this project?

Response: We will use the Mandatory Pre-Bid attendees as the plan holders.

Posted: 5/10/2022

Question: At the informational pre-bid meeting held, it was mentioned that General Contractors bidding this project must be SCDOT pre-qualified. There is no mention of this in the Documents issued for bidding. Please confirm this is not a requirement of the General Contractor (unless self-performing road work)

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/11/2022

Question: I would like to respectfully request your consideration of G410 60mil adhered Thermoplastic Polyvinyl-Chloride (PVC) Roofing System with a 20 year warranty, as a Substitution Hilton Head Island Airport (HXD) Terminal Improvements Sika Sarnafil manufactures thermoplastic PVC membranes that are energy-efficient and meet Energy Star and LEED criteria for low slope and steep slope applications. Below is the G410 Guide Spec, a G410 Product Data Sheet and other pertinent data, as it pertains to the project specifications. Our G410 60mil adhered membrane is Energy Star Rated and meets ASTM requirements. Video: Roofing Membrane Fire Test Sarnafil® G 410 60 Mil Energysmart Roof® Membrane: Product Data Sheet https://usa.sika.com/content/dam/dms/us01/5/sarnafil-g-410-60energysmart.pdf If you have any questions, would like samples, additional information, etc., please feel free to call me.

Response: There will be an addendum issued on Friday May 20, 2022. Your substitution request will be addressed in that Addendum.

Posted: 5/12/2022

Question: Is the IFB form required to be submitted with the Bid form?

Response: Yes, the IFB form is also to be submitted along with the other documents listed in the package.

Posted: 5/12/2022

Question: Can a copy of the Geotechnical report be provided? S-001 Earthquake Foundation Drains note 4 references this but only thing provided are the boring logs.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/12/2022

Question: Appendix D Davis Bacon Wage Rates only lists the rates for Highway Construction trades. Will the rates for Building Construction be issued?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/12/2022

Question: Can a copy of the Civil CAD file be provided?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/13/2022

Question: Can the civil CAD files be made available for the bid process?

Response: We are waiting for a response from the consultant

Posted: 5/16/2022

Question: What is the process to request a product to be added as an approved equal to those listed in specific specification section(s)? Example we request to add as an approved product to specification 096623 Terrazzco Brand Product by Concord Terrazzo Company. We can furnish a substitution request form with product data.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: What location will be available for the general contractor's field office trailer and parking? What location will be available for on site worker parking?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: The Project Special Provisions note that the GC is to provide a field office for owners engineer and representative. Specification 015000, 2.1, B notes a Common Use office for owner/GC is required. Please confirm which is required.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: Drawings AC-102 and AC-103 shows 2 contractor security checkpoints on plan. Is it required to have full time gate guard at each of these locations during the work of these phases?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: AC-700 shows details for Temporary Security/SIDA fence. What height is this fence required to be?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: Drawing PH-101 and others notes to reference A-801 for Temporary Plans and details. A-801 was not issued with bid documents?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: If Alternate 1 is accepted by the owner, will additional time be added to the contract duration?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: Bid Schedule item 97 (Allowance 13) has been pre-populated in the amount of $200,000. Allowance specification 012100 lists the amount as $150,000. Which is correct?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/16/2022

Question: Will you an accept an alternate for Allowance No.16–Digital Display:Lump-SumAllowance: Include the sum of $225,000.00for an ENGAGE Series flat-panel display as manufactured by Nanolumens.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: Temporary Barriers: 1) Drawing PH-101E notes to erect construction barrier between existing building and new terminal addition. Can a detail be provided for the required barrier? 2) Drawing PH-401B notes to construct temporary barrier inside existing building. Can a detail be provided for the required barrier?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: A4-11 shows TRB-1 in restrooms. A-751 does not list this material. Please confirm base material and the height of base.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: S-001 Deep soil Modification note 1 references this is to be done at existing footings at locations shown on plans. Demolition drawings do not show slab removal required to perform this work? Can this be added to demolition and structural plans?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: Specification 108213 Roof Equipment Screen is included in project manual, however the roof plans do not call out where these are required. Confirm if these are limited to EX-RTU-1 thru 6 or provide all locations to be included.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: Specification 075400, section 2.1 lists both KEE sheet and PVC sheet roofing. Confirm we have the option to uses either.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: S-101 and S-101 Keynote 7 regarding locations of Deep Soil Modifications to be done at existing footings, can you provide the size of these existing footing and depth below finish slab?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: Bid schedule line items 132 and 133 both are noted as Year 2 Maintenance. 1) is this to be same scope as item 131? 2) should item 133 description be changed?

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: A-701 and A-702 call for recessed floor matts at entrance vestibules. Can either a specification or Basis of Design be provided for this.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: A-571 shows various expansion joint details but the floor and roof plans do not call out location of the expansion joints. Please confirm required locations.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: A-011 and A-012 shows several 6' benches and states to reference spec. We do not find these listed in specification. Please provide spec or Basis of Design.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: A-013 shows several dual bollard bicycle racks as specified. We do not find these listed in specification. Please provide spec or Basis of Design.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question: Referencing the below regarding the QC requirements on the project.-If we engage a consultant, how much time is required? Only while paving operations are ongoing? If someone carries a full time employee for the entirely of the project and someone else takes the consultant route without any parameters, that’s quite a disparity in dollars carried. Part 2 – General Construction Items - Item C-100 Contractor Quality Control Program (CQCP) a. Program Administrator. The Contractor Quality Control Program Administrator (CQCPA) must be a full-time employee of the Contractor, or a consultant engaged by the Contractor. The CQCPA must have a minimum of five (5) years of experience in QC pavement construction with prior QC experience on a project of comparable size and scope as the contract. Included in the five (5) years of paving/QC experience, the CQCPA must meet at least one of the following requirements: Item C-100 Contractor Quality Control Program (CQCP) 3 (1) Professional Engineer with one (1) year of airport paving experience. (2) Engineer-in-training with two (2) years of airport paving experience. (3) National Institute for Certification in Engineering Technologies (NICET) Civil Engineering Technology Level IV with three (3) years of airport paving experience. (4) An individual with four (4) years of airport paving experience, with a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology or Construction.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/17/2022

Question:

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/18/2022

Question: Couple of Questions: 1) Will "Plan-Holders from the Mandatory Pre-Bid attendees list" receive Automatic Notifications from Vendor Registry? 2) If we are NOT a plan holder, do we receive automatic notifications for this project or would it be necessary to check the site ? 3) Will you be posting the List of Mandatory Attendees?

Response: If you are a vendor that is on the notification list you will receive notifications whenever there is a change or Addendum. If you see a solicitation posted that you have not received any notifications of you will need to contact Beaufort County Purchasing Department to be manually added to the vendor list. The list of attendees will be included in Addendum #1

Posted: 5/18/2022

Question: See below from a prospective landscape subcontractor IN GENERAL Where should items called out for on the plans that are not identified in the Bid Form nor are their written specifications on this. • Site Furnishings (Benches and Bike Racks) are referenced on the plan documents. Is this covered under and allowance or where shall these unit cost items be placed on the bid form and where would one find the specifications thereof? • Tree Arborist and Treatments noted on Sheet L1.03. This requires clarification IF only the trees noted as “Significant Trees” on Sheet L1.1/2 are the trees required for this treatment. 1. ALL SIGNIFICANT ANP SPECIMEN TREES WITHIN LIMIT QF WORK SHALL RECEIVE PRE ANP POST CONSTRUCTION FERTILIZATION ANP MYCOR TREATMENT BY A MASTER ARBORIST. 2. ALL SIGNIFICANT ANP SPECIMEN TREES SHALL BE TREATEP IN ACCORPANCE WITH THE LEVEL 2, BASIC TREE ASSESSMENT PROVlPEP BY TREE PRESERVATION, PATEP 10/15/2020, SEE PROJECT MANUAL APPENPIX E. 3. TREE ROOTS SHALL BE CUT CLEANLY AROUNP EXISTING TREES TO REMAIN LOCATEP APJACENT TO CONSTRUCTION ACTIVITIES. LANDSCAPE • There is significant Landscape Site Work and Clearing called out on the Landscape Set L1.1/2. Where should this work be placed on the Bid Form? • Planters Item 130 appear to be only the fill of the planters NOT construction. We intend to provide soils gravel irrigation and other green goods for this planter FILL. We are EXCLUDING this Vertical Construction. IRRIGATION • Please confirm Sleeving is to be provided in the LS Irrigation Pricing MAINTENANCE • Please clarify the maintenance durations per phase. The Bid form calls for Year 1 , 2 and 3. Is it correct to assume that Phase 1 as completed will have a 3 year duration, Phase 2 as completed will have a 2 year duration and Phase 3 as completed will have a 1 year duration? • Please correct the Bid Form to reflect the correct maintenance typo Line Item 133 and can the Bid Form be provided in Excel? • Please clarify if the maintenance requested to cover only the work per the contract documents and EXCLUDES existing landscape areas and surfaces.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/18/2022

Question: I would like to propose an SBS modified bitumen alternate roof assembly that performs well against fire, jet fuel (chemicals) and the high uplifts required at a coastal area. Proposed assembly, letter of intent to warrant and specification has been sent to Mr. Travis Pence with The Wilson Group Architects for review and consideration in addendum.

Response: This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/19/2022

Question: : See below from a prospective landscape subcontractor IN GENERAL Where should items called out for on the plans that are not identified in the Bid Form nor are their written specifications on this. • Site Furnishings (Benches and Bike Racks) are referenced on the plan documents. Is this covered under and allowance or where shall these unit cost items be placed on the bid form and where would one find the specifications thereof? • Tree Arborist and Treatments noted on Sheet L1.03. This requires clarification IF only the trees noted as “Significant Trees” on Sheet L1.1/2 are the trees required for this treatment. 1. ALL SIGNIFICANT ANP SPECIMEN TREES WITHIN LIMIT QF WORK SHALL RECEIVE PRE ANP POST CONSTRUCTION FERTILIZATION ANP MYCOR TREATMENT BY A MASTER ARBORIST. 2. ALL SIGNIFICANT ANP SPECIMEN TREES SHALL BE TREATEP IN ACCORPANCE WITH THE LEVEL 2, BASIC TREE ASSESSMENT PROVlPEP BY TREE PRESERVATION, PATEP 10/15/2020, SEE PROJECT MANUAL APPENPIX E. 3. TREE ROOTS SHALL BE CUT CLEANLY AROUNP EXISTING TREES TO REMAIN LOCATEP APJACENT TO CONSTRUCTION ACTIVITIES. LANDSCAPE • There is significant Landscape Site Work and Clearing called out on the Landscape Set L1.1/2. Where should this work be placed on the Bid Form? • Planters Item 130 appear to be only the fill of the planters NOT construction. We intend to provide soils gravel irrigation and other green goods for this planter FILL. We are EXCLUDING this Vertical Construction. IRRIGATION • Please confirm Sleeving is to be provided in the LS Irrigation Pricing MAINTENANCE • Please clarify the maintenance durations per phase. The Bid form calls for Year 1 , 2 and 3. Is it correct to assume that Phase 1 as completed will have a 3 year duration, Phase 2 as completed will have a 2 year duration and Phase 3 as completed will have a 1 year duration? • Please correct the Bid Form to reflect the correct maintenance typo Line Item 133 and can the Bid Form be provided in Excel? • Please clarify if the maintenance requested to cover only the work per the contract documents and EXCLUDES existing landscape areas and surfaces

Response: This is a duplicate question. This will be addressed in the addendum scheduled to be issued May 20th

Posted: 5/20/2022

Question: Three questions: 1) Where is the paving for item # 60 – P-403 “Bituminous Base Course”? All I’ve found is the Paving Plan (C901) that shows all of the asphalt paving shaded as Normal Duty Asphalt, and the only paving detail I see is on sheet C903 that shows a Prime Coat on top of the 8”GAB and 2” Type C Surface Mix. 2) A prime coat is shown on the paving detail on sheet C903, but I do not see a bid item for it. Will a prime coat be required, and if so, can an item be added for it? 3) Would the County consider applying the SCDOT asphalt liquid index to this project from the time of bid to the time of asphalt placement? With the massive upswing that we are seeing in the cost of liquid asphalt, either we or the GC will have to include a rather large contingency in the bid to cover this amount, and it would almost certainly be less costly to the County to base the asphalt liquid price changes on the SCDOT index rather than having to pay a lump sum contingency amount in the bid.

Response: This will be addressed in Addendum #2. That addendum is expected to be released on June 1.

Posted: 5/23/2022

Question: Specification 107516 is part of project manual but no Flagpole locations are found in plans. Please advise quantities and locations.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Questions regarding OH Coiling Doors: 1) A-602 shows door type H10. Can you confirm what type of door this is? 2) A-601 calls out some doors to be an Aluminum Grill Curtain but no specification is provided for that type?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Bid Schedule item 106 lists the unit as "Allow". The allowance specification does not provide any value for this item, Soil testing. Please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: At the pre-bid walk thru, access to the airside of the existing building was not provided. Can the owner provide photos of the existing building exterior along various angles of the airside?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Specification 26 05 90 Electrical Testing, section 1.5 B references that an Allowance should be included for this scope. Allowance specification 012100 does not include an amount for this, please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Mechanical Platform areas 201, 202, 203 - What finishes are required for floor, walls and ceilings in these rooms?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Is the overhead structure in baggage 112 and 110 required to be painted? We do not find a room finish schedule that would clarify this and other areas.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: A-451, 452, and 453 show exterior steel handrails. Can you confirm if these are to be galvinized and shop finished per spec. 055213, 2.7 or if they will be field painted?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: A-462 regarding the louvered equipment screen shown; 1) can you provide the top elevation of The screen? 2) can you provide detail for attachment of screen support posts to structure?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: A-703 calls out "Turf" at exterior SARA area 179. Can you provide basis of design for this product.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: A-751 and A-752 both list FRP-1 products. Which should be used?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Specification 34 77 15 On page 14 under “D. Accessories” option 8 “Alarm beacon light,” do you know if that beacon light is meant to be triggered by the doors being opened or the temperature inside the cabinet?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: RCP plans (A-123, etc.) legend calls out a ACP-5 product, however this product is not listed on A-751 finish schedule, please advise.

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Regarding the DBE participation requirements 1) The bid documents appear to note DOT certified companies apply, not just SCDOT? 2) There are limited subs that handle Building Construction work that are SCDOT certified, would you consider allowing use of other state and federal small disadvantaged businesses toward the goal?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: Will GC be required to pay for Utility usage costs for construction? It is assumed this would apply to GC field office trailer that would be metered separetly. What about actual building addition construction if electrical/water is tapped off existing service? If we need to meter seperatly would this apply only to the main addition, not the renovation area work?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: S-002, Structural Steel note 29 states All steel exposed to view shall be classified as Architecturally Exposed Structural Steel. Would this apply only to steel exposed to the public view or would it also include exposed steel at in-bound and out-bound areas?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/23/2022

Question: NOA1, drawing A-801 details for temporary walkway canopies notes "pre-engineered metal canopy" Is it up to the GC to engineer this? Is there any required framing type that is wanted? Can we use exposed metal stud framing?

Response: Please submit questions in 1 post. Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/24/2022

Question: Architectural Wall Panels Question-Please see below for our RFIs on the HHI project. We asked similar questions on Coastal Carolina, but I imagine we need to formally address some of the same issues for this separate and distinct bid opportunity. 1) Section 064219/2.1/B/5 calls for the FRL paneling to be IMO Certified. To receive IMO certification, Nevamar requires a special order. This certification and the associated adhesive (2.1/B/10) are for marine applications only. Please confirm that these products do not require IMO Certification or the associated marine use adhesive. 2) There are no indications in the Plan or Specs for desired grain direction on WPS-1 & WPS-3 laminate panels. Please confirm that vertical grain direction, if applicable, is required as there are additional costs associated with horizontal grain panel production. 3) Multiple details, like 3/A-566, show the FRL panels receiving a hand applied self-edge. These WPS panel systems are to be fully captured with aluminum extrusion, making it a concealed condition. The labor-intensive edge treatment process is an unnecessary cost driver that adds no performance or safety value to the project. Please confirm that the edges of the fully captured panels are not to receive FRL edge treatment as the fire rated plywood substrate will be concealed by the extrusions. 4) 064219/2.2/B/1 states the “recommended substrate” is ¾” FR OSB or plywood. Confirm ¾” FR material is a requirement for panel substrates. Landscaping Question-The RFI AD_01 came back and they are referring to a tree preservation plan (answering my RFI on the tree clarifications ) but there is no tree preservation plan only trees noted on the landscape plans. Do you have or can you request said plan. This tree work is very subjective on the pruning aspect and hopefully this is clarified on this plan. Need help to get the right numbers. Thank you

Response: We have already responded to this question. Please see the public solicitation.

Posted: 5/25/2022

Question: Several different bid questions as follows: 1. A-431 enlarged SARA area shows a decorative fence or barrier. Can you provide details and specification for this fence/barrier? 2. A415 shows steel support framing for restroom counters. Can you provide the size of the steel members for this. 3. 6/A-572 detail for expansion joint in exterior wall does not match the product listed in specification 079513.16. The product in the specification is a compressible foam seal. Please clarify the requirement. 4. S-113 and S-122 do not call out a detail for the expansion joint between C/L 27 and 27.1. Can you provide structural details for these locations. 5. A-601 door schedule notes typically at Overhead Coiling doors that the frame materials is to be "Per Manufacturer". Typically manufacturers do not require a frame as long as they can anchor to wall. Will any frames be required at these locations and if so can head, jamb and sill details be provided. 6. A-101 shows a cast in place curb outside of the inbound baggage room and notes to reference structural. S-101 does not show any curb or pad at this location, please advise. 7. We do not find locations required for Detail 8/A-525 called out on ceilings plans, can you advise on locations?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/25/2022

Question: The LED TV monitors and display - are these owner supplied.

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/26/2022

Question: Detail 2 of A-271 - shows bag scale as specified. Can you provide specifications for this bag scale.

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/26/2022

Question: Several questions raised by subcontractor regarding division 28 Access Control and Surveillance scope: 1) Are redundant servers and network switches required? 2) Is the security vendor responsible for providing the secure equipment rack for the ACS and VMS servers? 3) Is the security vendor responsible for installing the security LAN infrastructure? 4) Specs state owner to provide network switches. Is the airport authority providing network switches for both the ACS and VMS? 5) Does the airport authority have a preferred network switch if vendor supplied? 1) ACS System Specs reference an IDS system. Drawings do not include information on system or location. 2) IDF numbers do not match between T-002 & T-202. Please verify MDF/IDF room numbers. 3) Is the TSA credential a government issued credential that is equivalent to a CAC or TWIC credential? 4) Will the access control database communicate to a government database to verify that a TSA card holder is still active and if they are not, remove their access automatically? 5) Will there be any access control doors that only a TSA credential can be used and that the credential will need to be verified to a government database before the local access control system can allow access?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/26/2022

Question: The following are several different questions requesting response. 1) Will Termite Control application be required on this project? If so can a specification be provided. 2) M0.01, Temp GMU-1 note 4 notes to provide a factory roof curb. Since this unit is ground mounted, is this correct? 3) NOA1 page 11 of 11 notes drawing A-750 as being issued in addendum. This was not included in the NOA1 file?

Response: Your questions will be addressed in the next addendum scheduled to be released June 1

Posted: 5/26/2022

Question:

Response: We have already responded to this question. Please see the public solicitation.