Lakeland Sealed Solicitation

Title: Bids for FY23 Street Paving

Deadline: 1/26/2023 2:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Description: This project consists of mill and overlay in the Evergreen Hills Subdivision, Bentbrooke Hills Subdivision and Salem Road as depicted on the enclosed maps. Curb and gutter along with ADA Ramp replacement will be conducted in the Evergreen Hills Subdivision. In addition, two concrete ADA Ramps will be replaced at the raised crosswalk located on Maple Walk Dr. in The Grove Subdivision. A 5-foot wide concrete sidewalk and two concrete ADA ramps will be installed from the intersection of Maple Walk Dr. and Gillespie Oak Dr. to the intersection of Mt Gillespie Dr and Gillespie Oak Dr. in the Oakwood Subdivision.


Pre-Bid Meeting Date: 1/18/2023 2:00 PM

Pre-Bid Meeting Details: Pre-Bid Meeting will be held at ​2:00 p.m.​, Local Time, ​January 18, 2023​, at Lakeland City Hall


Documents:

Documents as of 1/6/2023
FY2023 Street Paving.pdf
Addition 1

Posted: 1/24/2023

Type of Addition: Addendum 1

Overview: Addendum 1 includes clarification on curb and gutter and ADA Ramp

Documents:

Posted: 1/24/2023

Type of Addition: Addendum 1

Overview: Addendum 1 includes clarification on curb and gutter and ADA Ramp

Documents: