St. Johns River Water Management District Sealed Solicitation

Title: IFB 36037 - FCX SAV Excavation

Deadline: 10/8/2020 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 36037

Description:

The Shands Bridge submerged aquatic vegetation (SAV) restoration is proposed to provide a portion of the mitigation required to offset unavoidable adverse impacts associated with the First Coast Expressway (FCX) project. The overall goal of this project is the creation of a SAV habitat adjacent to the existing bridge causeway.

The estimated budget for the project is $1,000,000.00, with the project occurring in two phases and crossing two District fiscal years.


Pre-Bid Meeting Date: 9/15/2020 11:00 AM

Pre-Bid Meeting Details: A Non-Mandatory Pre-Bid Conference is scheduled for September 15, 2020, at 11:00 a.m. The pre-bid conference will be held via teleconference with the call-in information presented in the bid packet. The project site is located at North East Side of Shands Bridge in St. Johns County, and the location is open to the public. The purpose of the pre-bid conference is to clarify requirements of this solicitation.


Documents:

Documents as of 10/2/2020
IFB_36037_FCX SAV Excavation - FINAL.pdf
Addendum 1 - 36037.pdf
Addendum 2 - 36037.pdf
Addendum 3 - 36037.pdf
Addition 1

Posted: 10/2/2020

Type of Addition: Addendum 2

Overview: BID OPENING DATE HAS BEEN EXTENDED. PLEASE SEE DETAILS IN ADDENDUM #2 FOR ADDITIONAL INFORMATION.

Documents:

Addition 2

Posted: 10/2/2020

Type of Addition: Addendum 1

Overview: Final Construction Drawings

Deadline: 10/8/2020 2:00 PM

Solicitation #: 36037

Documents:

Addition 3

Posted: 10/2/2020

Type of Addition: Addendum 3

Overview: Revised Cost Schedule - aligns with Final Construction Drawings provided in Addendum #1.  Please ensure that you submit your bid based on the Revised Cost Schedule from Addendum #3.

Deadline: 10/8/2020 2:00 PM

Solicitation #: 36037

Documents:

Addition 4

Posted: 10/9/2020

Type of Addition: In Review

Documents:

Addition 5

Posted: 10/19/2020

Type of Addition: Turnbull Environmental, Inc.

Amount: $1,372,500.00

Posted: 10/2/2020

Type of Addition: Addendum 2

Overview: BID OPENING DATE HAS BEEN EXTENDED. PLEASE SEE DETAILS IN ADDENDUM #2 FOR ADDITIONAL INFORMATION.

Documents:

Posted: 10/2/2020

Type of Addition: Addendum 1

Overview: Final Construction Drawings

Deadline: 10/8/2020 2:00 PM

Solicitation #: 36037

Documents:

Posted: 10/2/2020

Type of Addition: Addendum 3

Overview: Revised Cost Schedule - aligns with Final Construction Drawings provided in Addendum #1.  Please ensure that you submit your bid based on the Revised Cost Schedule from Addendum #3.

Deadline: 10/8/2020 2:00 PM

Solicitation #: 36037

Documents:

Posted: 10/9/2020

Type of Addition: In Review

Documents:

Posted: 10/19/2020

Type of Addition: Turnbull Environmental, Inc.

Amount: $1,372,500.00