County of Escambia Sealed Solicitation
Title: PD 22-23.051 Front Street Drainage Repairs
Deadline: 3/16/2023 11:00 AM (UTC-06:00) Central Time (US & Canada)
Status: In Review
Solicitation Number: PD 22-23.051
Description: The Front Street Drainage Repairs project includes replacing a failing stormwater drainage outfall system that is currently located on private property. The replacement piping and inlet system will be routed around the private property and located within Town of Century right-of-way. A portion of the new stormwater system will be located within the paved roadway; therefore, the project also includes a significant amount of pavement repair and overlay. Additionally, some minor relocation of existing water lines, sewer services, and gas mains will need to be adjusted to accommodate the proposed stormwater system.
Pre-Bid Meeting Date: 2/21/2023 1:00 PM
Pre-Bid Meeting Details: Non-mandatory TEAMS meeting.
Documents:
Documents as of 2/9/2023 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Addition 1
Posted: 3/3/2023
Type of Addition: Addendum 1
Overview: Revise quantity of Item 22 on the Bid Schedule from 1 to 2.
Documents:
Addition 3
Posted: 3/31/2023
Type of Addition: Bid Tab Recommendation
Overview:
Documents:
Addition 4
Posted: 3/31/2023
Type of Addition: Intent to Award
Overview:
Documents:
Question 1
Posted: 3/2/2023
Question: On the plan set, inlets A6 and A7 are both listed as type "V" gutter inlets. The bid schedule shows 1 EA. Can this be verified and a new bid schedule be issued if there is 2 EA?
Response: Addendum 1 will be published today 3/3/23 to correct the quantity to 2.
Posted: 3/3/2023
Type of Addition: Addendum 1
Overview: Revise quantity of Item 22 on the Bid Schedule from 1 to 2.
Documents:
Posted: 3/31/2023
Type of Addition: Bid Tab Recommendation
Overview:
Documents:
Posted: 3/2/2023
Question: On the plan set, inlets A6 and A7 are both listed as type "V" gutter inlets. The bid schedule shows 1 EA. Can this be verified and a new bid schedule be issued if there is 2 EA?
Response: Addendum 1 will be published today 3/3/23 to correct the quantity to 2.