County of Escambia Quote
Title: Roof Repair for Road Prison Kitchen Storage Building
Deadline: 5/17/2022 1:00 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Quote Number: FAC_HS_Prison Kitchen Storage_LB
Description: Shingle Roof Repair for Road Prison Kitchen Storage
1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply.
2. Remove 1,900 SF of existing asphaltic 3-tab shingles and underlayment components down to the lumber decking. Remove and properly dispose of 200 LF of edge metal, 60 LF of ridge vent and one (1) box vent.
3. Once the existing roof system has been removed the lumber decking should be removed and replaced with like kind and quality components.
4. New synthetic underlayment (1,900 SF) should then be installed atop the lumber deck per manufacturer recommendations. Ensure the underlayment is positively lapped to prevent water bucking.
5. Install new aluminum edge metal (200 LF) along all rake lines and eaves. The underlayment should transition atop the edge metal at the eave or be stripped in with self-adhered membrane or roofing cement.
6. Install 1,900 SF of new architectural laminate shingles (aesthetics to be approved by owner) per manufacturer recommendations. Ensure fastener attachment patterns are adequate for uplift requirements (6 fasteners recommended).
7. Install 60 LF of new ridge and one (1) box vent per manufacturer recommendations. Ensure ridge shingles are blind nailed as required by the manufacturer.
Documents:
Documents as of 4/11/2022 |
---|
Exhibit E_BID Permit App_Kitchen Storage.pdf |
Exhibit F_FEMA Clauses.pdf |
Exhibit R_Requirements for Non-Contract Insurance.pdf |
Addition 1
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Addition 2
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Addition 3
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents:
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents: