Central Florida Expressway Authority Sealed Solicitation
Title: INDEPENDENCE MAINLINE PHOTOVOLTAIC DESIGN/BUILD SERVICES; PROJECT 429-427
Deadline: 3/15/2022 1:30 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Deadline Expired
Solicitation Number: LOI-001899
Description: The services to be provided consist of, but are not necessarily limited to, design and construction of one Floating Photovoltaic Array in a net metering configuration for the meter serving the Independence Mainline Toll Plaza building on SR 429 as shown in the conceptual drawings included. The Design/Builder shall perform all investigations, coordination and design to produce final approved construction plans for the photovoltaic array, floating structures, electrical distribution system, utility interconnection, necessary permitting and traffic control. The Design/Builder shall also be responsible for furnishing and installing the photovoltaic array, floating structures, inverters, wiring, transformers, grounding and other electrical and structural components needed to ensure a complete and proper connection to meter number 9920468 for a net metering configuration. The Design/Build firm shall make available the necessary personnel, facilities, supplies, materials and resources to perform the required services
Documents:
Documents as of 2/18/2022 |
---|
Login to view documents |
Login to view documents |
PLANHOLDERS:
Date | Company Name |
---|---|
2/21/2022 9:41:09 AM | VALENCIA CONSTRUCTION GROUP, INC. |
2/21/2022 10:04:09 AM | Traffic Control Devices, LLC |
2/21/2022 10:12:39 AM | envirobidnet |
2/21/2022 1:24:23 PM | PWXPress |
2/21/2022 6:32:02 PM | Link Systems, LLC |
2/22/2022 12:53:11 AM | AG Ltd |
2/22/2022 3:16:14 AM | Dodge Data & Analytics |
2/22/2022 3:57:59 AM | Construction Bid Source |
2/22/2022 10:54:45 AM | fl research inc. |
2/22/2022 2:08:06 PM | DRMP |
2/22/2022 7:11:08 PM | IMS |
2/24/2022 12:09:49 PM | EAC Consulting |
2/25/2022 9:34:10 AM | Ameresco, Inc. |
2/25/2022 9:36:26 AM | Matcon construction services |
2/25/2022 11:53:15 AM | North America Procurement Council Inc., PBC |
3/2/2022 8:24:21 AM | Nova Engineering and Environmental |
3/2/2022 10:34:50 AM | EnergyLink LLC |
3/3/2022 12:24:01 PM | Conti LLC |
3/10/2022 12:25:09 PM | ConstructConnect |
3/15/2022 4:14:26 PM | rush facilities |
3/16/2022 1:09:30 AM | Amerescp |
3/16/2022 12:09:22 PM | EXP US Services, Inc |
3/17/2022 11:21:04 PM | Dodge Data & Analytics |
3/21/2022 6:58:51 PM | Metric Engineering |
3/22/2022 4:22:31 PM | Michael Baker International |
3/22/2022 4:26:36 PM | Tierra, Inc |
3/22/2022 8:09:58 PM | Castillo Engineering Services, LLC |
3/23/2022 9:30:15 AM | Construction Journal |
4/4/2022 2:21:48 PM | Chinchor Electric, Inc. |
4/5/2022 8:44:49 AM | AECOM |
4/6/2022 8:19:23 PM | BASE Consultants |
4/7/2022 2:33:36 PM | Florida Industrial Electric |
4/21/2022 12:38:12 PM | Advanced Roofing, Inc. |
4/22/2022 6:45:17 PM | D3Energy |
5/10/2022 10:45:27 AM | Wood Environment & Infrastructure Solutions |
6/13/2022 3:27:55 PM | KCG Transportation Services |
8/16/2022 1:27:21 AM | IMS |
3/14/2023 1:35:30 PM | Nadic Engineering Services |
Addition 1
Posted: 2/21/2022
Type of Addition: Public Notices
Overview: 001899 Proj. Scope Notice 2-24-2022
Documents:
Addition 2
Posted: 3/15/2022
Type of Addition: LOI's Received 001899
Overview:
Documents:
Addition 3
Posted: 3/22/2022
Type of Addition: Shortlisting Minutes 001899
Overview: Evaluation Committee for Independence Mainline Photovoltaic Design/Build Services, Project 429-427, Contract No. 001899 held a duly noticed meeting on Tuesday, March 22, 2022, commencing at 10:00 a.m. in the Pelican Conference Room at CFX Administration Bldg., Orlando, FL 32807
Documents:
Posted: 2/21/2022
Type of Addition: Public Notices
Overview: 001899 Proj. Scope Notice 2-24-2022
Documents:
Posted: 3/15/2022
Type of Addition: LOI's Received 001899
Overview:
Documents:
Posted: 3/22/2022
Type of Addition: Shortlisting Minutes 001899
Overview: Evaluation Committee for Independence Mainline Photovoltaic Design/Build Services, Project 429-427, Contract No. 001899 held a duly noticed meeting on Tuesday, March 22, 2022, commencing at 10:00 a.m. in the Pelican Conference Room at CFX Administration Bldg., Orlando, FL 32807
Documents: