Dorchester County Sealed Solicitation
Title: Pump Station 115 Replacement
Deadline: 3/14/2023 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: IFB 2023-40
Description: The complete replacement of one (1) wastewater pump station (PS 115) in Dorchester County, SC. The replacement consists of, but is not limited to, the installation of 15” PVC SDR 26 Gravity Sewer Pipe, and 8” PVC DR 18 sewer force main, doghouse manholes, standard manholes, and connections to existing sewer lines; pipe abandonment with flowable fill; new 12’-0” diameter wet well construction, new electrical panel, new generator and pad; demolition of existing features; site grading and paving; storm pipe installation; water service installation; and all associated appurtenances as described in the specifications and shown in the drawings.
Pre-Bid Meeting Date: 2/16/2023 2:00 PM
Pre-Bid Meeting Details: The Pre-Bid Meeting will be held at 235 Deming Way, Summerville, SC 29483.
Documents:
Documents as of 3/2/2023 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
PLANHOLDERS:
Date | Company Name |
---|---|
2/10/2023 10:33:22 AM | Kiewit |
2/10/2023 11:18:04 AM | Central Pipe Rehab LLC |
2/11/2023 10:21:08 AM | Azalea Utilities, Inc. |
2/13/2023 8:30:03 AM | Truluck Construction, Inc. |
2/13/2023 9:46:48 AM | Moorhead Construction, Inc. |
2/13/2023 9:51:33 AM | Clark Construction Group, LLC |
2/13/2023 10:32:11 AM | Gatch Electrical Contractors, Inc. |
2/13/2023 10:41:14 AM | R.H. Moore Company, Inc. |
2/13/2023 11:01:44 AM | Chandler Construction Services, Inc. |
2/13/2023 3:07:16 PM | Kiewit Infrastructure South Co. |
2/14/2023 2:15:20 AM | Dodge Data |
2/14/2023 3:46:27 PM | M.B. Kahn Company, Inc. |
2/15/2023 12:10:05 PM | Triad Engineering & Contracting Co. |
2/16/2023 8:29:20 AM | North American Construction Company |
2/21/2023 11:03:49 AM | Michael Baker International |
2/27/2023 1:16:19 PM | Harper Corporation |
2/27/2023 3:50:07 PM | Sherwin Williams |
3/1/2023 10:24:33 AM | Eadie's Construction Company |
3/1/2023 11:33:23 AM | Reeves Young |
3/1/2023 12:00:08 PM | Level Utilities LLC |
3/1/2023 1:06:57 PM | G Robert George & Associates, Inc. |
3/1/2023 4:24:30 PM | Michael Baker International, Inc. |
3/2/2023 7:45:48 AM | Anson Construction |
3/2/2023 11:01:06 AM | Chandler Construction Services, Inc. |
3/3/2023 1:52:52 AM | AG Ltd |
3/3/2023 12:01:49 PM | Xylem |
3/7/2023 9:41:04 AM | Haren Construction Company, Inc. |
3/7/2023 9:51:26 AM | Revere Control Systems, LLC |
3/8/2023 2:46:22 PM | Consolidated Pipe & Supply |
3/10/2023 2:29:53 PM | Level Utilities LLC |
3/10/2023 2:32:15 PM | Pete Duty & Assoc. |
3/13/2023 7:55:07 AM | Bishop and Sons Plumbing and Piping |
3/13/2023 8:39:46 PM | Triad |
3/14/2023 8:16:07 AM | TCO Construction Inc. |
3/15/2023 7:31:26 AM | FORTILINE |
3/15/2023 11:23:38 AM | Triad Engineering and Contracting |
3/21/2023 5:18:32 AM | Dodge Data & Analytics |
3/21/2023 2:20:18 PM | Garney Companies, inc |
3/22/2023 4:31:03 AM | Deltek |
3/22/2023 11:20:54 AM | MJL, Inc. |
3/22/2023 1:43:23 PM | R. H. Moore Company, Inc. |
3/22/2023 2:36:45 PM | Level Utilities LLC |
3/27/2023 5:39:44 PM | ConstructConnect |
3/28/2023 4:42:32 AM | Mersino Dewatering/Global Pumps |
4/4/2023 12:49:00 PM | Ben Cox Company |
4/17/2023 8:32:36 AM | Dodge Data & Analytics |
4/18/2023 9:31:10 AM | Soil Consultants Inc. |
5/10/2023 9:14:09 AM | State Utility Contractors, Inc. |
5/19/2023 1:08:23 PM | Republic Contracting Corporation |
6/1/2023 11:27:03 AM | Seacoast Supply |
9/1/2023 5:21:29 PM | Level Utilities LLC |
10/14/2023 8:24:58 PM | Electric Supply Co Inc |
11/1/2023 11:13:51 PM | DCG Solutions LLC |
8/23/2024 11:10:41 AM | LIN-DEE UTILITIES |
12/12/2024 11:12:06 AM | JW Construction Co |
Addition 2
Posted: 3/1/2023
Type of Addition: Addendum #2
Overview: See attached
Solicitation #: IFB 2023-40
Documents:
Addition 3
Posted: 3/14/2023
Type of Addition: In Review
Addition 4
Posted: 3/15/2023
Type of Addition: Unofficial Bid Tabulation
Overview:
Documents:
Addition 6
Posted: 3/22/2023
Type of Addition: Detailed Bid Tab
Overview:
Documents:
Addition 7
Posted: 3/22/2023
Type of Addition: Additional Award Note
Overview: In the Recommendation of Award letter, the County's consultant erroneously states that the County's local vendor preference program applied to this bid. This is not correct - neither the lowest responsive, responsible bidder, nor the second lowest responsive, responsible bidder (within 5% of the low bidder) are located in Dorchester County.
Question 1
Posted: 2/10/2023
Question: In the bid documents, it says Security Required: Not Applicable. I just want to verify that no bid bond is required.
Response: There has been an update to this section of the IFB document, please re-download the document to see revision.
Posted: 3/1/2023
Type of Addition: Addendum #2
Overview: See attached
Solicitation #: IFB 2023-40
Documents:
Posted: 3/14/2023
Type of Addition: In Review
Posted: 3/15/2023
Type of Addition: Unofficial Bid Tabulation
Overview:
Documents:
Posted: 3/22/2023
Type of Addition: Additional Award Note
Overview: In the Recommendation of Award letter, the County's consultant erroneously states that the County's local vendor preference program applied to this bid. This is not correct - neither the lowest responsive, responsible bidder, nor the second lowest responsive, responsible bidder (within 5% of the low bidder) are located in Dorchester County.
Posted: 2/10/2023
Question: In the bid documents, it says Security Required: Not Applicable. I just want to verify that no bid bond is required.
Response: There has been an update to this section of the IFB document, please re-download the document to see revision.