Central Florida Expressway Authority Sealed Solicitation
Title: SR 516 FROM LAKE-ORANGE COUNTY LINE TO SR 429, Project No. 516-238
Deadline: 11/21/2023 1:30 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Deadline Expired
Solicitation Number: ITB-002060
Description: The work consists of providing all labor, materials, equipment, and incidentals necessary to construct the proposed SR 516 from Lake County/Orange County Line to SR 429 (Segment 3). Specifically, the project consists of construction of a new limited access toll highway consisting of four lanes (two in each direction) between Lake County/Orange County Line and SR 429, a systems interchange with SR 429, a local interchange with proposed Valencia Parkway and new local road construction of Valencia Parkway, a four-lane divided roadway. This project will include construction of new bridge structures over Valencia Parkway, interchange ramps, Schofield Road, and SR 429. The work also includes, but is not limited to drainage improvements, retaining and noise walls, interchange and sign lighting, signing and pavement markings, Intelligent Transportation Systems (ITS) infrastructure, toll gantries, and maintenance of traffic in Lake County and Orange County.
Pre-Bid Meeting Date: 10/2/2023 3:00 PM
Documents:
PLANHOLDERS:
Date | Company Name |
---|---|
9/26/2023 7:59:14 AM | Danus Utilities |
9/27/2023 7:25:08 AM | Rocal, Inc |
9/27/2023 1:38:32 PM | Structural Technologies LLC |
10/2/2023 5:30:02 PM | SACYR CONSTRUCTION USA |
10/3/2023 9:38:51 AM | Johnson & Company |
10/4/2023 1:28:02 PM | ZEP CONSTRUCTION INC |
10/4/2023 2:14:27 PM | On Point Surveying, Inc. |
10/5/2023 1:00:04 PM | Sacyr Construction USA |
10/6/2023 10:30:57 AM | Orion Marine Construction, Inc. |
10/10/2023 3:41:19 PM | K.V.K. Contracting, Inc. |
10/10/2023 4:31:04 PM | ATLANTIC CIVIL CONSTRUCTORS CORP |
10/11/2023 9:15:58 AM | CDM Smith Inc. |
10/11/2023 4:00:26 PM | Interstate Signways |
10/11/2023 4:25:31 PM | VHB |
10/13/2023 12:33:11 PM | Intertek/PSI (Professional Service Industries,Inc.) |
10/16/2023 8:02:20 AM | Southland Construction, Inc. |
10/17/2023 9:39:50 AM | AECOM |
10/18/2023 8:23:02 AM | Metric Engineering Inc. |
10/18/2023 3:34:59 PM | ADS |
10/19/2023 1:40:57 PM | CFX |
10/23/2023 10:02:14 AM | KSM Engineering & Testing |
10/23/2023 10:32:28 AM | TBD |
10/23/2023 3:48:12 PM | HDR |
10/25/2023 9:22:06 AM | GM2 Associates, Inc. |
10/27/2023 2:07:33 PM | Arcosa Traffic Structures |
10/30/2023 5:39:15 PM | Roadway Construction Products |
10/31/2023 1:18:14 PM | Archer Western |
11/1/2023 2:38:21 PM | Sacyr Construction USA |
11/3/2023 8:46:39 AM | HNTB |
11/3/2023 1:07:12 PM | Cloverleaf Corporation |
11/7/2023 5:14:35 PM | Condotte America, Inc. |
11/8/2023 9:42:45 AM | Surface preparation technologies llc |
11/8/2023 12:57:13 PM | RFE Construction & Fence Services, Inc |
11/9/2023 8:47:40 AM | North America Procurement Council Inc., PBC |
11/9/2023 3:15:27 PM | sema construction |
11/9/2023 3:32:59 PM | M and N landscaping S.E. Inc. |
11/9/2023 4:32:12 PM | Traffic Engineering and Management |
11/10/2023 1:10:07 AM | Construct Connect |
11/10/2023 8:43:53 AM | Watson Bowman Acme Corp |
11/13/2023 7:03:25 AM | Atlantic Pipe Services, LLC |
11/14/2023 10:13:11 AM | Universal Engineering Sciences |
11/14/2023 11:35:27 AM | Contech Engineered Solutions |
11/15/2023 7:53:04 AM | Junior Davis Construction Company, Inc. |
11/16/2023 8:25:48 AM | Dewberry Engineers Inc |
11/16/2023 1:38:58 PM | The Lane Construction Corporation |
11/16/2023 1:39:12 PM | Cosmec, Inc. |
11/16/2023 1:50:52 PM | P & S Paving Inc. |
11/16/2023 2:05:22 PM | McShea contracting |
11/16/2023 2:05:54 PM | Intelligent Transportation Services, Inc. |
11/16/2023 2:20:57 PM | Watson Civil Construction, Inc. |
11/16/2023 2:27:23 PM | AIS Infrastructure LLC |
11/16/2023 2:32:38 PM | The Arnold Group of Florida, Inc. |
11/16/2023 2:39:56 PM | Nadic Engineering Services |
11/16/2023 2:44:59 PM | Quest Corporation of America |
11/16/2023 2:52:20 PM | Brevard Concrete Paving, Inc. |
11/16/2023 3:04:54 PM | Highway Safety Devices, Inc. |
11/16/2023 3:31:51 PM | mageba |
11/16/2023 3:37:22 PM | Wavetronix, LLC |
11/16/2023 3:38:47 PM | Tampa Steel Erecting Company |
11/16/2023 3:40:03 PM | Ferguson Water Works |
11/16/2023 5:17:32 PM | Link Systems, LLC |
11/16/2023 11:51:16 PM | AG Ltd |
11/17/2023 8:52:18 AM | Finishing Systems of Florida |
11/17/2023 9:49:38 AM | Roadway Construction Products |
11/17/2023 11:56:50 AM | RK&K |
11/17/2023 3:31:59 PM | UES |
11/17/2023 11:10:09 PM | Deltek |
11/20/2023 8:57:20 AM | CFX |
11/20/2023 8:57:31 AM | Hanes Geo Components |
11/20/2023 11:55:26 AM | Veransa Group, Inc. |
11/20/2023 12:27:16 PM | Structural Technologies |
11/20/2023 12:52:06 PM | Jacobs |
11/20/2023 1:21:43 PM | Arrive Alive Traffic Control |
11/20/2023 2:49:26 PM | dodge data and analytics |
11/20/2023 3:58:03 PM | Bob's Barricades |
11/21/2023 8:38:45 AM | LB Foster CO |
11/21/2023 9:18:15 AM | Omega Coatings & Construction, LLC |
11/21/2023 9:36:01 AM | CFX |
11/21/2023 10:19:58 AM | Ranger Construction |
11/21/2023 10:50:38 AM | Universal Signs and Accessories |
11/21/2023 1:18:19 PM | Top Star Construction, LLC |
11/21/2023 2:27:38 PM | Ranger Construction |
11/21/2023 2:40:16 PM | Veritas Steel LLC |
11/21/2023 2:40:27 PM | Southeast Highway |
11/21/2023 2:41:39 PM | SEMA Construction, Inc. |
11/21/2023 2:41:46 PM | Gosalia Concrete Constructors |
11/21/2023 2:41:55 PM | Gosalia Concrete Constructors, Inc. |
11/21/2023 2:42:10 PM | Dane Construction and Company, Inc. |
11/21/2023 2:42:11 PM | The Lane Construction Corporation |
11/21/2023 2:42:31 PM | RS&H, Inc. |
11/21/2023 2:42:42 PM | Concrete Impressions of Florida, Inc. |
11/21/2023 2:42:43 PM | SICE, Inc. |
11/21/2023 2:42:47 PM | DRMP Inc. |
11/21/2023 2:42:57 PM | Hubbard Construction Company |
11/21/2023 2:43:01 PM | DRMP |
11/21/2023 2:43:10 PM | Superior Construction Company Southeast, LLC |
11/21/2023 2:43:10 PM | Transportation Systems Inc. |
11/21/2023 2:43:26 PM | The Reinforced Earth Company |
11/21/2023 2:44:06 PM | Advanced Lighting & signals LLC |
11/21/2023 2:44:08 PM | United Signs & Signals |
11/21/2023 2:44:09 PM | SEMA Construction |
11/21/2023 2:44:15 PM | RAINBOW DISTRIBUTORS USA |
11/21/2023 2:44:48 PM | Kiewit Infrastructure South Co. |
11/21/2023 2:45:00 PM | R. J. Watson, Inc. |
11/21/2023 2:45:19 PM | EFCO Corp |
11/21/2023 2:45:21 PM | Precision Contracting Services, Inc. |
11/21/2023 2:45:34 PM | ASAP Installations |
11/21/2023 2:45:56 PM | Kisinger Campo and Associates, Inc. |
11/21/2023 2:46:15 PM | Florida Industrial Electric |
11/21/2023 2:47:22 PM | Earth Tech, LLC |
11/21/2023 2:48:24 PM | Hubbard Construction Company |
11/21/2023 2:50:14 PM | ASAP Specialty Foundations, LLC |
11/21/2023 2:51:23 PM | Chubb Surety |
11/21/2023 2:52:05 PM | Jr. Davis Construction Co., Inc. |
11/21/2023 2:56:39 PM | Concrete Services, LLC |
11/21/2023 3:00:46 PM | ASAP Installations |
11/21/2023 3:01:57 PM | Traffic Control Devices, LLC |
11/21/2023 3:02:12 PM | Southern Development & Construction |
11/21/2023 3:02:20 PM | Southland Construction Inc. |
11/21/2023 3:03:24 PM | Leware Construction Company |
11/21/2023 3:06:11 PM | C. Slagter Construction, Inc. |
11/21/2023 3:06:47 PM | Reliable Constructors, Inc. |
11/21/2023 3:07:03 PM | Southland Construction, Inc. |
11/21/2023 3:09:15 PM | Vecellio & Grogan, Inc. |
11/21/2023 3:14:48 PM | Atlas Engineering Group Inc |
11/21/2023 3:15:47 PM | Ion Electric, LLC |
11/21/2023 3:18:22 PM | Granite Construction |
11/21/2023 3:27:31 PM | Sacyr |
11/21/2023 3:33:09 PM | Gibbs & Register, Inc. |
11/21/2023 3:35:10 PM | Sesco Lighting, Inc. |
11/21/2023 3:36:36 PM | Lane Construction |
11/21/2023 3:44:55 PM | Parsons |
11/21/2023 3:56:00 PM | Garcia Civil Contractors, LLC |
11/21/2023 3:56:14 PM | Daktronics, Inc. |
11/21/2023 4:03:42 PM | Oglesby Construction Inc. |
11/21/2023 4:05:59 PM | C.W. Roberts Contracting, Inc. |
11/21/2023 4:14:02 PM | Temple, Inc. |
11/21/2023 4:31:39 PM | Traffic Control Products of Fl, Inc |
11/21/2023 4:39:10 PM | Qualis Concrete LLC |
11/21/2023 5:12:13 PM | Bob's Barricades, Inc. |
11/21/2023 5:23:26 PM | BCC Engineering |
11/21/2023 5:23:41 PM | Marvel Bridge Engineers |
11/21/2023 5:34:53 PM | Archer Western |
11/21/2023 5:50:27 PM | Shelby Erectors, Inc. |
11/21/2023 9:46:29 PM | UES |
11/21/2023 11:15:32 PM | FCS Industries Corp |
11/22/2023 4:48:29 AM | Consor |
11/22/2023 4:52:22 AM | Mill-It Corporation |
11/22/2023 5:53:15 AM | MRM Construction LLC |
11/22/2023 7:15:55 AM | Pre-Cast Specialties, LLC |
11/22/2023 7:35:11 AM | VALENCIA CONSTRUCTION GROUP, INC. |
11/22/2023 8:27:19 AM | DRMP |
11/22/2023 9:03:24 AM | Spring Precast LLC |
11/22/2023 10:10:44 AM | Chinchor Electric, Inc. |
11/22/2023 10:33:22 AM | Tricon Precas LTD |
11/22/2023 10:40:15 AM | Synergy Earth Systems, LLC |
11/22/2023 12:51:51 PM | Skanska USA Civil Southeast Inc. |
11/22/2023 12:55:31 PM | Jedi Corridors |
11/22/2023 2:50:37 PM | Dewberry |
11/24/2023 5:42:45 PM | Prince Contracting, LLC |
11/26/2023 2:30:21 PM | BASE Consultants |
11/27/2023 2:04:46 AM | ConstructConnect |
11/27/2023 6:46:59 AM | Dodge Data & Analytics |
11/27/2023 7:08:27 AM | Dodge Data |
11/27/2023 7:27:06 AM | Central Florida Expressway Authority |
11/27/2023 8:21:29 AM | D.S. Brown Company |
11/27/2023 8:49:42 AM | Concrete Cutting & Breaking Co. |
11/27/2023 8:59:04 AM | Preferred Materials, Inc. |
11/27/2023 9:13:09 AM | CDM Smith |
11/27/2023 9:16:37 AM | FOLEY PRODUCTS |
11/27/2023 10:18:18 AM | EAGLE GRINDING AND GROOVING LLC |
11/27/2023 10:32:56 AM | Dixie Lime And Stone Company |
11/27/2023 12:03:02 PM | Florida Structural Steel |
11/27/2023 1:36:08 PM | Blount-Sanford Contracting Company, Inc. |
11/27/2023 2:54:47 PM | PSI |
11/27/2023 3:38:35 PM | EMSI |
11/27/2023 3:41:45 PM | Civil/Site Engineering, Inc. |
11/28/2023 8:01:26 AM | Balfour Beatty |
11/28/2023 8:51:19 AM | Surface Preparation Technologies, LLC |
11/28/2023 9:10:14 AM | Ledstar, Inc. |
11/28/2023 1:01:59 PM | Highway Safety Devices, Inc. |
11/28/2023 2:21:55 PM | The Middlesex Corporation |
11/28/2023 2:44:16 PM | RK&K |
11/29/2023 7:12:05 AM | WBQ |
11/29/2023 8:12:27 AM | Ranger Construction Industries, Inc. |
11/29/2023 9:44:39 AM | Quest |
11/29/2023 9:59:58 AM | SACYR |
11/29/2023 2:35:58 PM | Tierra, Inc. |
11/29/2023 3:48:10 PM | Harris Rebar |
11/29/2023 5:17:04 PM | SESCO Lighting |
11/30/2023 6:44:17 AM | D-MAC Industries Inc. |
11/30/2023 10:49:29 AM | Universal Engineering Sciences |
11/30/2023 11:51:31 AM | Dewberry |
11/30/2023 3:12:56 PM | geotechnical foundations |
12/1/2023 9:42:41 AM | Americut Coring & Sawing Inc |
12/1/2023 10:34:07 AM | AECOM |
12/1/2023 10:34:52 AM | Integrated Synergy Inc. |
12/1/2023 12:50:52 PM | Archer Western Construction, LLC |
12/4/2023 8:34:22 AM | Dodge Data & Analytics |
12/4/2023 2:44:08 PM | Greenfield Diversified, LLC |
12/5/2023 3:50:53 PM | J. Mori Painting, Inc. |
Addition 1
Posted: 9/25/2023
Type of Addition: Public Notice 002060
Overview: Prebid Meeting 10-2-2023
Documents:
Addition 2
Posted: 9/26/2023
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated September 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 2 pages and the following attachments: Soils Reports/Existing Core Data document; Reissuance of uncorrupted Technical Special Provisions.
Deadline: 11/7/2023 1:30 PM
Solicitation #: 002060
Documents:
Addition 3
Posted: 10/5/2023
Type of Addition: Public Notice
Overview: 002060_Pre-Bid Meeting Sign-In Sheet
Documents:
Addition 4
Posted: 10/10/2023
Type of Addition: Addendum No. 2
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 8 pages. Reference documents – Roll Plot (2) pdfs; Geotechnical reports (12 pdfs) via link and KMZ (6) files via link as separate documents.
Deadline: 11/21/2023 1:30 PM
Solicitation #: 002060
Documents:
Addition 5
Posted: 10/13/2023
Type of Addition: Addendum No. 2A
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page.
Solicitation #: 002060
Documents:
Addition 6
Posted: 10/27/2023
Type of Addition: Addendum No. 3
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: FDEP 404; ERP permits; Revised Plan Sheets; and New Plan Sheet.
Solicitation #: 002060
Documents:
Addition 7
Posted: 11/1/2023
Type of Addition: Addendum No. 3A
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 5 pages and the following attachments: Attachment to Special Provision SP-52.
Solicitation #: 002060
Documents:
Addition 8
Posted: 11/9/2023
Type of Addition: Addendum No. 4
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 16 pages and the following attachments: Revised Plan Sheets; Revised SP Exhibits.
Solicitation #: 002060
Documents:
Addition 9
Posted: 11/16/2023
Type of Addition: Addendum No. 5
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 5 pages and the following attachments: Fuel Adjustment Form; Revised Bid Form; Revised Roadway Plan Sheets; and Revised Structure Plan Sheets.
Solicitation #: 002060
Documents:
Addition 10
Posted: 11/21/2023
Type of Addition: Bid Opening Minutes
Overview: 002060 516-238 - Bid Opening Minutes
Documents:
Posted: 9/25/2023
Type of Addition: Public Notice 002060
Overview: Prebid Meeting 10-2-2023
Documents:
Posted: 9/26/2023
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated September 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 2 pages and the following attachments: Soils Reports/Existing Core Data document; Reissuance of uncorrupted Technical Special Provisions.
Deadline: 11/7/2023 1:30 PM
Solicitation #: 002060
Documents:
Posted: 10/5/2023
Type of Addition: Public Notice
Overview: 002060_Pre-Bid Meeting Sign-In Sheet
Documents:
Posted: 10/10/2023
Type of Addition: Addendum No. 2
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 8 pages. Reference documents – Roll Plot (2) pdfs; Geotechnical reports (12 pdfs) via link and KMZ (6) files via link as separate documents.
Deadline: 11/21/2023 1:30 PM
Solicitation #: 002060
Documents:
Posted: 10/13/2023
Type of Addition: Addendum No. 2A
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page.
Solicitation #: 002060
Documents:
Posted: 10/27/2023
Type of Addition: Addendum No. 3
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: FDEP 404; ERP permits; Revised Plan Sheets; and New Plan Sheet.
Solicitation #: 002060
Documents:
Posted: 11/1/2023
Type of Addition: Addendum No. 3A
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 5 pages and the following attachments: Attachment to Special Provision SP-52.
Solicitation #: 002060
Documents:
Posted: 11/9/2023
Type of Addition: Addendum No. 4
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 16 pages and the following attachments: Revised Plan Sheets; Revised SP Exhibits.
Solicitation #: 002060
Documents:
Posted: 11/16/2023
Type of Addition: Addendum No. 5
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated August 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 5 pages and the following attachments: Fuel Adjustment Form; Revised Bid Form; Revised Roadway Plan Sheets; and Revised Structure Plan Sheets.
Solicitation #: 002060
Documents:
Posted: 11/21/2023
Type of Addition: Bid Opening Minutes
Overview: 002060 516-238 - Bid Opening Minutes
Documents: