Telamon Corporation Quote

Title: Restroom Additions

Deadline: 4/8/2022 4:30 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Description: Transition Resources Corporation (TRC) is accepting quotes from qualified companies to add restrooms in
preschool classrooms at three TRC Head Start centers. The project may have to be delivered in phases based on
school schedules. The priority is to add restrooms in nine (9) classrooms at the TRC Muncie Head Center at 3900
E. Wysor Street. Classroom numbers are 8, 10, 12, 13, 14, 15, 16, 17 and 19 and are located on the east and the
westside of the facility.
Requirements include:
• Miscellaneous blocking in the walls for hardware and accessories.
• Wood doors with privacy hardware.
• Metal stud and drywall partition for toilet rooms. Acoustical ceiling in toilet rooms.
• Painting of walls and door frames.
• Resilient tile flooring (Epoxy and Seal) in toilet rooms and patch in corridors at plumbing tie-in.
• Toilet accessories include toilet paper & soap dispensers, grab bars, frameless mirrors, and a paper towel
dispenser.
• New plumbing for toilet and sink in toilet rooms.
Introduction
3
• Electrical includes lay-in light in toilet room on a separate switch, and 2 GFCI receptacles for Sani-Flo with
Hot water tank and exhaust fan switched with light.
• Supply water will come from existing sink removal with existing isolation ball valves in each classroom.
• It may be necessary to complete the restroom install in phases if unable to finish project during times while
school is not in session. If time becomes an issue the work will be completed as follows:
Phase One
o Install nine (9) restrooms at TRC Muncie Head Start at 3900 E. Wysor Street
Phase Two
o Install one (1) restroom addition at the TRC Muncie Central Classroom – Muncie Central High
School 801 N. Walnut Street
Phase Three
o Install two (2) restroom additions in rooms 114 and 130 at the TRC Anderson Head Start center
located at 812 W. 13th Street, Anderson
• Required supervision, permits and temporary protection, and general conditions.
• All contractors will need to wear masks while on premises working.


Documents:

Documents as of 3/4/2022
RFQ IN23 Restrooms.pdf