Atlanta BeltLine, Inc. Sealed Solicitation

Title: Atlanta BeltLine, Inc. - Eastside Trail Capital Improvements Construction

Deadline: 7/8/2020 1:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Description:

Atlanta BeltLine, Inc. (ABI) is soliciting competitive sealed bids from qualified firms to implement the construction of several capital improvements to the existing Eastside Trail running from the intersection of 10th Street and Monroe Drive to the intersection of the trail and Irwin Street, Atlanta.The Eastside Trail opened in 2013 and spans two miles from the intersection of 10th Street and Monroe Drive to Irwin Street in Atlanta, Georgia. Design and construction of the trail segment was funded by a combination of public and private philanthropic sources. More than two million users per year visit the 14-foot wide multi-use trail, which connects Inman Park, Historic Fourth Ward, and Atlanta’s Midtown neighborhoods.  Due to the high volumes of users over the past six years, the trail and its surroundings need improvements to the stormwater conveyance system as well as additions to the hardscape and landscape. A large portion of these improvements will be to the current 2-foot soft shoulder that parallels most of the trail. To provide additional space for users and to help prevent further undermining of the trail surface, Flexi-Pave has been specified for installation along both sides of the trail to help mitigate both user volume and stormwater issues.  Installation of a new piped conveyance drainage system at Drewry Street will require trail closures and detours. All required work is outlined in the Scope of Work and Bid Form in this ITB.  ****** Please scroll down to view ITB and related documents.












Pre-Bid Meeting Date: 6/17/2020 1:00 PM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.Virtual Pre-Bid, Wednesday, June 17 2020, 1:00 PM (EST) Call-in Number: 1-646-558-8656 Meeting ID: 88636608118 Web Meeting Room URL: https://us02web.zoom.us/j/88636608118


Documents:

Documents as of 6/30/2020
East Side Capital Improvements ITB Posted.pdf
AppendixA C-2019-05-02 Midtown Beltline Drainge Set to ABI (1).pdf
AppendixA D-KBI Flexi-Pave HD2000 Spec. (2019).pdf
AppendixA E-KBI - Flexi-Pave HD2000 Side Detail.pdf
AppendixA F-31 23 18 Rock Removal - Eastside CAP Improvements.pdf
AppendixA G-32 92 00_Turf & Grasses.pdf
EST Cap Improvements ITB Pre Bid Presentation.pdf
Vendors Pre Sign In for EST Capital Virtual Pre Bid 6.17.2020.pdf
Addendum 1 - Eastside Trail Capital Improvements ITB.pdf
Question 1

Posted: 6/17/2020

Question: 1) LBR 40 is a Florida DOT spec item subgrade used underneath Flexi-Pave, Is there an equivalent subgrade acceptable for use in Beltline Application? Is Existing subgrade compacted sufficiently acceptable? 2) Who is responsible for testing of soil/aggregate on project? 3) Is the Flexi-Pave (2' wide) installed on both sides of Beltline Pathway from Monroe Dr. to Irwin St? 4) Will there be a staging area provided on this project? If so, where will it be located and size of area? 5) If pathway closure is needed during construction will that be allowed? If so, what is the maximum duration of pathway closure? 6) What kind of Permanent Grassing will be required for project? Will grassing maintenance after installation be required?

Response: We have responded to your questions. Please see the public solicitation, addendum #1 and other related documents. Thanks.

Question 2

Posted: 6/22/2020

Question: A) The typical section has 2’ wide ditch. In order to estimate the excavated soils we need the following: a. What is the depth of the ditch? b. What is the side slopes? B) Can you provide the estimated earthwork quantities since there are no cross sections? C) Can the excavated soil be spread on the slope on-site and stabilized by grassing? Please clarify.

Response: We have responded to your questions. Please see the public solicitation, addendum #1 and other related documents. Thanks.

Posted: 6/17/2020

Question: 1) LBR 40 is a Florida DOT spec item subgrade used underneath Flexi-Pave, Is there an equivalent subgrade acceptable for use in Beltline Application? Is Existing subgrade compacted sufficiently acceptable? 2) Who is responsible for testing of soil/aggregate on project? 3) Is the Flexi-Pave (2' wide) installed on both sides of Beltline Pathway from Monroe Dr. to Irwin St? 4) Will there be a staging area provided on this project? If so, where will it be located and size of area? 5) If pathway closure is needed during construction will that be allowed? If so, what is the maximum duration of pathway closure? 6) What kind of Permanent Grassing will be required for project? Will grassing maintenance after installation be required?

Response: We have responded to your questions. Please see the public solicitation, addendum #1 and other related documents. Thanks.

Posted: 6/22/2020

Question: A) The typical section has 2’ wide ditch. In order to estimate the excavated soils we need the following: a. What is the depth of the ditch? b. What is the side slopes? B) Can you provide the estimated earthwork quantities since there are no cross sections? C) Can the excavated soil be spread on the slope on-site and stabilized by grassing? Please clarify.

Response: We have responded to your questions. Please see the public solicitation, addendum #1 and other related documents. Thanks.