City of Griffin Quote

Title: Milling & Resurfacing FY21

Deadline: 5/7/2021 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Cancelled

Quote Number: 21-004

Description: The purpose of these specifications is to detail the requirements for the milling and resurfacing work on various streets (approximately 19,180LF) in Griffin. The maps detailing the needs are included as Attachments at the end of this document. All work as described in the technical specifications is subject to inspection of the City of Griffin Public Works and Utilities Department, Griffin, GA. It shall be the Supplier’s responsibility to coordinate with the City of Griffin Public Works and Utilities Department for inspection services. All work shall be done in accordance with the laws of the State of Georgia and shall meet or exceed the Georgia Department of Transportation’s Standard Specifications for the Construction of Roads and Bridges, MUTCD, latest edition and any amendments thereto. Asphaltic concrete milling, leveling, patching, resurfacing, shoulder stabilization including grassing, adjustment of manholes, water valves and drainage structures, and installation or replacement of thermoplastic striping as directed,traffic control, erosion control and dust control.All milled areas must be covered within 7 (seven) days.


Documents:

Documents as of 4/12/2021
21-004 Milling Resurfacing- FY21.pdf
21-004 LMIG STREET LIST INFO.xlsx
21-004 Quilly St Map rev.jpg
21-004 Forest Ave & Bieze St LMIG Map FY21.jpg
21-004 Anne St LMIG Map.jpg
21-004 Map-Ellis Rd & Crystal Brook Drive.jpg