City of Georgetown Sealed Solicitation

Title: Front Street Phase 3 UG Infrastructure Upgrade (T4) Request for Bid Project 1931

Deadline: 11/27/2024 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Open

Description: This project is Phase 3 of Underground Electrical Upgrades along Front St. Phase 3 consists of upgrading the power distribution system associated with existing Transclosure T4 including single phase pad mounted transformers, primary and secondary cables, service cables as necessary, new electrical conduit, modifications to existing duct bank, and refurbishment of existing pull boxes and manhole.


Pre-Bid Meeting Date: 11/7/2024 10:30 AM

Pre-Bid Meeting Details: Rainey Park on Front Street, Georgetown SC


Documents:

Documents as of 11/4/2024
RFB.pdf
2024.09.20_S_BASE_00_E_9732_.pdf
E3001_FSEU_Eqmt_Location_Plan_Rev_0_signed.pdf
E3002_FSEU_Electrical_Plan_Existing_Rev_0_signed.pdf
E3003_FSEU_Electrical_Plan_New_Rev_0_signed.pdf
E3004_FSEU_Construction_Sequence_Rev_0_signed.pdf
E3005_FSEU_BOM_Rev_0_signed.pdf
E3011_FSEU_Misc_Details_Rev_0_signed.pdf
E3016_FSEU_Manhole_T4A_Rev_0_signed.pdf
E3017_FSEU_Manhole_T4B_Rev_0_signed.pdf
E3031_FSEU_Pullbox_11_Rev_0_signed.pdf
E3040_FSEU_C_C_Schedule_Rev_0_signed.pdf
E3041_FSEU_Cable_Tags_Rev_0_signed.pdf
E3050_FSEU_Transformer_Dets_Rev_0_signed.pdf
E3100_1_FSEU_One_Line_Existing_Rev_0_signed.pdf
E3100_2_FSEU_One_Line_New_Rev_0_signed.pdf
G3001_FSEU_Title_Sheet_Rev_0_G3001_signed.pdf
Addendum_I_Pre_bid_meeting_location.pdf
Addition 1

Posted: 11/8/2024

Type of Addition: Non Mandatory Site Visit Sign in Sheet

Documents:

Posted: 11/8/2024

Type of Addition: Non Mandatory Site Visit Sign in Sheet

Documents: