Solicitation From: Sierra County

RFP# 2017-07-007 MONTICELLO WATER SYSTEM IMPROVEMENTS FOR MOTICELLO, NM
6/29/2017 2:00 PM (Mountain Standard Time)
Awarded
RFP #2017-07-007 MOTICELLO WATER SYSTEM
This RFP is seeking professional engineering services preliminary and final design phase. This is a phase project with the first phase consisting of architectural, engineering, surveying, landscaping and planning services for the Monticello Well Water Project. SAP 16-A-2309-STB. Attachment: SAP_Engineer_PDC_CONTRACT_FORM- WILL BE THE CONTRACT USED FOR SELECTED/AWARDED VENDOR.
6/6/2017 10:00 AM (Mountain Standard Time)
Pre-Proposal Conference: June 6, 2017 @ 10:00 AM- Meeting Location: 378 Calle Del Norte, Monticello VFD Station.

Addendum 1

Posted on 5/23/2017

Pre Con- Date Changed- from June 7th to June 6th-
6/29/2017 2:00:00 PM (Mountain Standard Time)
6/6/2017 10:00:00 AM (Mountain Standard Time)
Pre-Proposal Conference: June 6, 2017 @ 10:00 AM- Meeting Location: 378 Calle Del Norte, Monticello VFD Station.
RFP #2017-07-007 MONTICELLO WATER SYSTEM

Addendum # 2 PER STUDY If you have difficulty opening per study- please, contact me directly and I will provide it for you. Thank you.

Posted on 5/25/2017

PER REQUEST- THESE DOCUEMENTS WERE CONDUCTED PRIOR TO THIS SOLICIATION- THE DOCEMENTS HAVE BEEN REQUESTED THEREFORE THEY ARE BEING RELEASED FOR REVIEW. PLEASE, SEE ATTACHED-
6/29/2017 2:00:00 PM (Mountain Standard Time)
6/6/2017 10:00:00 AM (Mountain Standard Time)
PRE BID CONFERENCE Pre-Proposal Conference: June 6, 2017 @ 10:00 AM- Meeting Location: 378 Calle Del Norte, Monticello VFD Station.
RFP #2017-07-007 MOTICELLO WATER SYSTEM

Addendum 3 - PER COMPLETE WITH MAPS

Posted on 6/1/2017


Addendum # 4 Pre-Con and Other Questions

Posted on 6/9/2017

Addendum #4 is based on the Pre-Proposal Conference which was held on June 6, 2017 in Monticello @ 10:00- and questions submitted by other vendors. Note: Area Map and Other document's are for requested informational purposes only. Deadline for Questions is June 13, 2017 by 2:00 PM- Deadline for RFP Packets is June 29, 2017 @ 2:00 PM.
6/29/2017 2:00:00 PM (Mountain Standard Time)
Note: The Mandatory Pre-Con has been Amended to Non- Mandatory based on scheduling conflicts.
RFP #2017-07-007 MONTICELLO WATER SYSTEM

INTERVIEW SIGN IN SHEET

Posted on 7/27/2017

There were (2) of (4) submittal's that were selected by the evaluating committee for interviews. 1.) Smith Engineering 2.) Souder, Miller and Associates
RFP #2017-07-007 MONTICELLO WATER SYSTEM

FINAL SCORE SHEETS

Posted on 7/27/2017

Based on the discretion of the evaluating committee members, Sierra County, has elected to move forward with Smith Engineering at this time. All submittal's were exceptional and we appreciate the time it took to put these packets together.
RFP #2017-07-007 MONTICELLO WATER SYSTEM

In Review and Negotiations

Posted on 7/27/2017

Based on the discretion of the evaluating committee, the County of Sierra has opted for Smith Engineering to provide a cost proposal for the engineering and development of the well water system in Monticello. The score sheets have been reviewed and approved by the State which allowed us to move forward with these negotiations. All the submittal's were well crafted and we appreciate all the Engineering companies that took the time to provide a packet.

Smith Engineering

Posted on 8/18/2017

$100,000.00
© Copyright Vendor Registry 2018 Terms of Use Privacy Policy